Toin Vietnam Factory Handover Document

This document is a handover document for the mechanical work of the Nissey Vietnam Phase 4 Factory Project. It details that the main contractor is Tsuchiya Vietnam Co., Ltd. and the subcontractor is Thang Tien Technical Material Co., Ltd. The document is presented in multiple volumes and contains technical specifications and details for the mechanical works and systems being handed over for the new factory project in Vietnam.

Uploaded by

Bay Mưa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views17 pages

Toin Vietnam Factory Handover Document

This document is a handover document for the mechanical work of the Nissey Vietnam Phase 4 Factory Project. It details that the main contractor is Tsuchiya Vietnam Co., Ltd. and the subcontractor is Thang Tien Technical Material Co., Ltd. The document is presented in multiple volumes and contains technical specifications and details for the mechanical works and systems being handed over for the new factory project in Vietnam.

Uploaded by

Bay Mưa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

NISSEY VIETNAM PHASE 4 FACTORY

-------- PROJECT --------

HANDOVER DOCUMENT

MAIN CONTRACTOR: TSUCHIYA VIETNAM CO., LTD.

SUB CONTRACTOR: THANG TIEN TECHNICAL MATERIAL CO., LTD

May - 2016
RIAL CO., LTD
TOIN VIETNAM FACTORY PROJECT

HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT


HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT

HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT

HANDOVER DOCUMENT
MECHANICAL WORK

SMBC HCMC BRANCH OFFICE PROJECT

HANDOVER DOCUMENT
MECHANICAL WORK
RY PROJECT

CUMENT
ORK

RY PROJECT
CUMENT
ORK

RY PROJECT

CUMENT
ORK

RY PROJECT

CUMENT
ORK

ICE PROJECT

UMENT
RK
TOIN VIETNAM FACTORY PROJECT
HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT


HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT


HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT


HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT


HANDOVER DOCUMENT
MECHANICAL WORK
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
6 7 8 9 10
6 7 8 9 10
6 7 8 9 10
6 7 8 9 10
6 7 8 9 10
6 7 8 9 10
6 7 8 9 10
6 7 8 9 10
6 7 8 9 10
6 7 8 9 10
TOIN VIETNAM FACTORY PROJECT

VOL.1
HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT

VOL.1
HANDOVER DOCUMENT
MECHANICAL WORK

TOIN VIETNAM FACTORY PROJECT

VOL.2
HANDOVER DOCUMENT
MECHANICAL WORK
TOIN VIETNAM FACTORY PROJECT

VOL.2
HANDOVER DOCUMENT
MECHANICAL WORK

SMBC HCMC BRANCH OFFICE PROJECT

HANDOVER DOCUMENT
MECHANICAL WORK
1 2 VII A B I II III IV V VI 1 2 3 4 5
1 2 VII A B I II III IV V VI 6 7 8 9 10
1 2 VII A B I II III IV V VI 1 2 3 4 5
1 2 VII A B I II III IV V VI 6 7 8 9 10
1 2 VII A B I II III IV V VI 11 12 13 14 15
1 2 VII A B I II III IV V VI 11 12 13 14 15
1 2 VII A B I II III IV V VI 1 2 3 4 5
1 2 VII A B I II III IV V VI 1 2 3 4 5
1 2 VII A B I II III IV V VI 1 2 3 4 5
1 2 3 a b c d e f g h 1 2 3 4 5
6 7 8 9 10
11 12 13 12 11
6 7 8 9 10
11 12 13 12 11
16 17 18 19 20
16 17 13 12 11
6 7 8 9 10
6 7 13 12 11
6 7 8 9 10
6 7 8 9 10
MUROTECH VIETNAM PHASE 3

HANDOVER DOCUMENT
HỒ SƠ HOÀN CÔNG

MAIN CONTRACTOR: TSUCHIYA VIETNAM CO., LTD.

SUB CONTRACTOR: THANG TIEN TECHNICAL MATERIAL CO., LTD