Tender 110
Tender 110
SUPPLY & INSTALLATION OF HVAC SYSTEM (VRF) TO WINGS ‘A’ & ‘E’ IN
SHREE VITTHAL RUKMINI BHAKTA NIWAS COMPLEX.
2019-2020
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
DISCLAIMER
1) Detailed Time Table for the various activities to be performed in the e-tendering
process by the Tenderer for quoting their offer is giving in this Tender Document
under "Tender Schedule". Contractor should carefully note down the cut-off dates for
the carrying out each e-tendering process/activity.
,2) Every effort is being made to keep the Website up to date and running smoothly 24
X 7 by the Government and the service Provider. However, Govt. takes no
responsibility, and will not be liable for, the website being temporarily unavailable
due to any technical issue at any points of time.
3) In that event LAW & JUDICIARY DEPARTMENT will not be liable or responsible for
any damages or expenses arising from any difficulty, error, imperfection or
inaccuracy with this Website or any part thereof or any contents or any associated
services.
4) Tenderers must follow the time table of e-tendering process and get their activities of
e-tendering processes done well in advance so as to avoid any inconvenience due
to unforeseen technical problem if any.
5) LAW & JUDICIARY DEPARTMENT will not be responsible for any incomplete
nativity of e-tendering process pf the tenderer due technical error/ failure of website
and it cannot be challenged by way of appeal, arbitration and in 1 the Court of Law.
Contractors must get done all the e-tendering activities well in advance.
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Online Tenders (e-tender) in “ B-1” form for the following work is invited by the Executive Officer, SHRI
The details can be viewed and downloaded online directly from the Government of Maharashtra e-
Executive Officer
SHRI VITTHAL RUKMINI TEMPLES COMMITTEE,
PANDHARPUR.
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Tender Notice
SUPPLY & INSTALLATION OF HVAC SYSTEM (VRF) TO WINGS ‘A’ & ‘E’ IN
SHREE VITTHAL RUKMINI BHAKTA NIWAS COMPLEX.
Please Note: All bid related activities (Process) like tender Document Download, Bid
Preparation and Bid Submission will be governed by the time schedule given under Key Dates
below:
Seq
LAJD Stage Vendor Stage Start Date & Time Expiry Date & Time
No
Dates mentioned here, are scheduled dates for Bid Opening Activities. Any changes in dates of
opening of technical and commercial bids shall be notified in 'Press Notice / Corrigendum' section on
the e-Tendering sub portal of the department before opening of the same.
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
-: NAME OF WORK:-
SUPPLY & INSTALLATION OF HVAC SYSTEM (VRF) TO WINGS ‘A’ & ‘E’ IN SHREE
VITTHALRUKMINI BHAKTANIWAS COMPLEX,
PANDHARPUR, DIST. - SOLAPUR.
1. Online percentage rate Tenders in "B-1" form are invited by the Executive Officer, Shri Vitthal Rukmini
Temples COMMITTEE, Tal. Pandharpur (Phone no. 02186/224466) for the following works on
Government of Maharashtra Electronic Tender Management System http://maharashtra.etenders.in
from the Registered contractors in appropriate class of the Public Works (Electrical) Department of
Govt. of Maharashtra State. The name of work, estimated cost, earnest money, security deposit, time
limit for completion etc. are as under
Time Cost of e-
Earnest
Sr. Estimated limit for tender Class of
Name of Work Money
No Cost Rs. Comple Form Fee Contra-ctor
Rs.
tion Rs.
SUPPLY &
INSTALLATION OF
HVAC SYSTEM (VRF) 11,800/- Contractor
Should be "A"
TO WINGS ‘A’ & ‘E’ IN
(Non- Class registered
SHREE 02 Refundable) contractor with
VITTHALRUKMINI 99,87,839/- 1,00,000/- Months the Public
1
BHAKTANIWAS (Including Works Electrical
COMPLEX, GST) Department,
PANDHARPUR (Online Govt of
Mode Only) Maharashtra.
,DIST.- SOLAPUR.
2. Tender form, conditions of contract, specifications and contract drawings can be downloaded from the
e-Tendering portal of LAW & JUDICIARY DEPARTMENT, Government of Maharashtra i.e. https://
lajd.maharashtra.etenders.in after entering the details, payment of Rs. 11,800/- should be paid online
using payment gateway. The fees of tender document will be non refundable. Further information
regarding the work can be obtained from the above office.
3. Attested EMD Exemption certificate, Affidavit on Rs. 100/- stamp paper in prescribed form given in
Annexure I sworn before Executive Magistrate / Notary, Additional Performance Security Deposit
(If required), should be submitted in sealed covers addressed to the Executive Officer, SHRI VITTHAL
RUKMINI TEMPLES COMMITTEE with the name of the work written at the top of the envelope will be
received in the office of the Executive Officer, SHRI VITTHAL RUKMINI TEMPLES COMMITTEE
during Bid Opening. Bids will be opened as per the Tender Schedule, in the presence of such intending
Tenderers or his/ their authorized representatives who may be present at that time.
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
4. The offer of the Contractor shall remain valid for acceptance for a minimum period of 30 days
from the date fixed for opening of Envelope No. 2 ( Main Tender) and thereafter until it is
withdrawn by the Contractor by notice in writing duly addressed to the authority opening
the tender and sent by Registered Post Acknowledgement Due.
5. The tender notice shall form a part of the contract agreement.
6. The tenders are invited on the public works Departmental design only.
7. The tenderer if firm or company shall in their forwarding letter mention the names of all the
partners of the firm or the company ( as the case may be) and the name of the partner who holds
the power attorney if any, authorizing him to conduct transaction on behalf of the Firm or Company.
8. Right is reserved to revise or amend the contract documents fully or part thereof prior to the
date notified or amended for the receipt of tender. Such deviations/ amendments if any, shall
be communicated in the form of corrigendum or by a letter as may be considered suitable.
9. The tenderer shall enter his percentage rates in words and figures " below / above". In case
there is difference between percentage written in figures and words, the lower offer will be taken
as final.
10. No pages should be removed from, added in or replaced in the Tender.
11. Right is reserved to reject any or all tenders without assigning any reason thereof.
12. Tenders who do not fulfill all or any conditions or are incomplete in any respect are liable to
summary rejection.
13. The Tenderer may, in the forwarding letter, mention any points he may wish to
make clear but right is reserved to reject the same of the whole of the tenders if the same become
conditional tender thereby.
Executive Officer
SHRI VITTHAL RUKMINI
TEMPLES COMMITTEE, PANDHARPUR.
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Name of Contractor :
Percentage quotes :
Amount of Contract :
Date of Commencement :
Reference to sanction of :
Tender.
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
DETAILS OF WORK
Name of Work: SUPPLY & INSTALLATION OF HVAC SYSTEM (VRF) TO WINGS ‘A’ & ‘E’ IN
SHREE VITTHALRUKMINI BHAKTANIWAS COMPLEX, PANDHARPUR,
DIST.- SOLAPUR.
Term Deposit Receipt of Schedule Bank / Nationalized Bank / State Bank of India Challan or
Valid E.M.D. Exemption Certificate duly attested shall be uploaded at the time of submission.
Total Security Deposit 4% ( Four Percent).
:
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
G ENE R AL
a) Time limit : The work is to be completed within time limit as specified in the Notice
inviting tender which shall be reckoned from the date of written order of commencing the
work and shall be inclusive of monsoon period.
b) Tender Rate : No alteration in the form of tender and the schedule of tender and no
additions in the scope or special stipulation will be permitted. Rates quoted for the tender
shall be taken as applicable to all leads and lifts.
c) Tender Units : The tenderers should particularly note the unit mentioned in the
Schedule "B" on which the rates are based . No change in the units shall be allowed.
In the case of difference between rates written in figures and words , the correct rate
will be the one, which is lower of the two.
d) Correction : No corrections shall be made in the tender documents. Any
corrections that are to be made by crossing the incorrect portion and writing the
correct portions above with the initials of the tenderer.
e) All pages of tender documents , conditions, specifications, correction slips , etc. shall be
initialed by the tenderer.The tender should bear full signature of the tenderer, or his
authorized power of attorney holder in case of Firm.
f) The tendered rates shall be inclusive of all taxes, rates and cases and shall also be inclusive
of all livable in respect of works contract in provision of the Maharashtra Sales Tax/VAT on
transfer of property in goods involved in the execution of works contract Act, 1985
(Maharashtra Act No. XIX of 1985) Maharashtra Act XIX of 1985 clause regarding
turnover tax vide PWD Circular No. CAT 1086/CR-330/Bldg-2 dated 10.06.87.Tender
rates must be inclusive of GST
g) The Income Tax @ 2.30% or percentage in force from time to time or at the rate as
intimated by the competent Income Tax authority shall be deducted from bill
amount whether measured bill, advance payment or secured advance
h) Royalty :- Royalty shall be recovered from R.A. Bills, if Challans of revenue authority is
not submitted at the rates in force from time to time or at the rate as intimated by the
competent Revenue and Forest Department Authority.
i) Employees provident fund Act, minimum wages Act, etc. will be applicable on tenderer. The
amount payable arising due to these will be whole responsibility of the tenderer .Temples
committee will be not be responsible for such any payment.
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
2.1 The EMD Rs. 1,00,000/- if applicable shall be paid via online mode or if exemption
Certificate is available then valid certificate of exemption from payment of earnest money
should be Scanned from original copy, Additional (performance ) Security (if required )
(Copy to be Submitted as per the tender schedule).
2.2 Scanned copy of Valid earnest money exemption certificate will also be accepted
in lieu of earnest money deposit,. The tenderers who are exempted from payment of
earnest money deposit should attach attested copy of certificate from Government of
Maharashtra regarding exemption from the payment of earnest money.
2.3 Tender of those who do not deposit earnest money in one of the above
acceptable forms shall be summarily rejected. Earnest money in any other form of
cash or Cheque will not be accepted.
2.4 The amount of earnest money will be refunded to the unsuccessful tenderer on deciding
about the acceptance or otherwise of the tender or on expiry of the validity period
whichever is earlier.
In case of the successful tenderer, it will be refunded on his paying the initial
security deposit and completing the tender documents or will be transferred towards a part
of security deposit to be paid after awarding of the work. If successful tenderer does
not pay the security deposit in the prescribed time limit and complete the
agreement bond, his earnest money deposit will be forfeited to the Committee.
Tender Forms can be purchased from the e-Tendering Portal of LAW & JUDICIARY
DEPARTMENT, Government of Maharashtra i.e. https:// lajd.maharashtra.etenders.in after
paying Tender Fees via online mode as per the Tender Schedule.
3.2.2 The prospective tenderers are free to ask for any additional information or
clarification either in writing or orally concerning the work, and the reply to the same
shall be uploaded on the portal http://lajd.maharashtra.etenders.in and this clarification
referred to as Common Set of Conditions/Deviations (C.S.D.), shall form part of
tender documents and which will also be common and applicable to all tenderers.
The point/points if any raised in writing and/or verbally/ online by the contractor in
pretender conference and not finding place in C.S.D. issued after the pre- bid
conference, is/are deemed rejected. In such case the provision in NIT shall prevail. No
individual correspondence will be made thereafter with the contractor in this regard
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
3.2.3 The tender submitted by the tenderer shall be based on the clarification, additional
facility offered (if any) by the Department, and this tender shall be unconditional.
Conditional tenders shall be summarily REJECTED.
3.2.4 All tenderers are cautioned that tenders containing any deviation from the
contractual terms and conditions, specifications or other requirements and
conditional tenders will be treated as non responsive. The tenderer should clearly
mention in forwarding letter that his offer (in envelope No. 1& 2) does not contain any
conditions, deviations from terms and conditions stipulated in the tender.
3.2.5 Tenderers should have valid Class II / III Digital Signature Certificate (DSC) obtained
from any Certifying Authorities. In case of requirement of DSC, interested
Bidders should go to
http://maharashtra.etenders.in/mah/DigitaICertLasp and follow the procedure
mentioned in the document 'Procedure for application of Digital Certificate'.
3.2.6 The Tenderers have to make a payment of Rs 1058/- online as service charges for the
use of Electronic Tendering during Online Bid Data Decryption and Re- encryption
stage of the Tender.
3.2.7 For any assistance on the use of Electronic Tendering System, the Users may call the
below numbers:
Landline No. - 020 - 25315555
3.2.8 Tenderers should install the Mandatory Components available on the Home Page of
http://maharashtra.etenders.in under the section 'Mandatory Components' and make
the necessary Browser Settings provided under section 'Internet Explorer Settings'
For participating in Limited and Restricted tenders the registered vendors have to apply
for empanelment on the sub-portal of lajd in an appropriate class of registration. The
empanelment will have to be approved by the respective officer from the Temples
Committee. Only empaneled vendors will be allowed to participate in such tenders.
The Bid Data that is prepared online is required to be encrypted and the hash value of
the Bid Data is required to be signed electronically using a Digital Certificate (Class
- II or Class - III). This is required to maintain the security of the Bid Data and also to
establish the identity of the Contractor transacting on the System.
Bid data / information for a particular Tender may be submitted only using the Digital
Certificate which is used to encrypt the data / information and sign the hash value
during the Bid Preparation and Hash Submission stage. In case during the process of
preparing and submitting a Bid for a particular Tender, the Contractor loses his/her
Digital Signature Certificate (i.e. due to virus attack, hardware problem, operating
system problem); he / she may not be able to submit the Bid online. Hence, the
Users are advised to store his / her Digital Certificate securely and if possible, keep
a backup at safe place under adequate security to be used in case of need.
The same procedure holds true for the Authorized Users in a Private / Public Limited
Company. In this case, the Authorization Certificate will have to be signed by the
Director of the Company or the Reporting Authority of the Applicant.
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The Utilities are available for download freely from the above mentioned section.
The Contractors are requested to refer to the E-Tendering Toolkit for Bidders
available online on the Home Page to understand the process of setting up the
System, or alternatively, contact the Helpdesk Support Team on information / guidance
on the process of setting up the System.
In case, the Contractors have multiple documents under the same type (e.g. multiple
Work Completion Certificates) as mentioned above, the Contractors advised to either
create a single .pdf file of all the documents of same type or compress the documents in a
single compressed file in .zip or .rar formats and upload the same.
It is mandatory to upload the documents using the briefcase facility. Therefore, the
Contractors are advised to keep the documents ready in the briefcase to ensure timely
bid preparation.
Note: Uploading of documents in the briefcase does not mean that the documents
are available to Temples Committee at the time of Tender Opening stage unless the
documents are specifically attached to the bid during the online Bid Preparation and
Hash Submission stage as well as during Decryption and Re- encryption stage.
The Contractors can view the Detailed Tender Notice along with the Time Schedule
(Key Dates) for all the Live Tenders released by lajd on the home page of lajd e-
Tendering Portal on http:// lajd.maharashtra.etenders.in under the section Recent Online
Tender.
The Pre-qualification / Main Bidding Documents are available for free downloading. However to
participate in the online tender, the bidder must purchase the bidding documents via online
mode by filling the cost of Tender Form Fee.
PG. 15
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Notes:
Preparation and Hash Submission as per Time Schedule mentioned in the Tender
documents.
e. This stage will be applicable during both, Pre-bid / Pre-qualification and
Financial Bidding Processes.
After the expiry of the cut - off time of Bid Preparation and Hash Submission stage to be
completed by the Contractors has lapsed, the Tender will be closed by the Tender
Authority.
The Tender Authority from Temples Committee shall generate and digitally sign the
Super Hash values (Seals).
After the time for generation of Super Hash values by the Tender Authority from
Temples Committee has lapsed, the Contractors have to make the online payment of
Rs. 1,092/- towards the fees of the Service Provider.
After making online payment towards Fees of Service Provider, the Contractors are
required to decrypt their bid data using their Digital Certificate and immediately
encrypt their bid data using the Public Key of the Tendering Authority. The Public Key
of the Tendering Authority is attached to the Tender during the Close for Bidding stage.
Note: The details of the Processing Fees shall be verified and matched during the
Technical Opening stage.
At this time, the Contractors are also required to upload the files for which they generated
the Hash values during the Bid Preparation and Hash Submission stage.
PG. 16
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The Bid Data and Documents of only those Contractors who have submitted their Bid
Hashes (Seals) within the stipulated time (as per the Tender Time Schedule), will be
available for decryption and re-encryption and to upload the relevant documents from
Briefcase. A Contractor who has not submitted his Bid Preparation and Hash Submission
stage within the stipulated time will not be allowed to decrypt / encrypt the Bid data /
submit documents during the stage of Decryption and Re encryption of Bids (submitting the
Bids online).
The Tendering Authority will first open the Technical Bid documents of all Contractors
and after scrutinizing these documents will shortlist the
Contractors who are eligible for Financial Bidding Process. The shortlisted Contractors
will be intimated by email.
The Contractors may remain present in the Office of the Tender Opening Authority at
the time of opening of Financial Bids. However, the results of the Financial Bids of all
Contractors shall be available on the l a j d e-Tendering Portal immediately after the
completion of opening process.
The Contractors are strictly advised to follow the Dates and Times allocated to each stage
under the column "Contractor Stage" as indicated in the Time Schedule in the Detailed
Tender Notice for the Tender. All the online activities are time tracked and the Electronic
Tendering System enforces time-locks that ensure that no activity or transaction can take
place outside the Start and End Dates and Time of the stage as defined in the Tender
Schedule.
At the sole discretion of the Tender Authority, the time schedule of the Tender stages may
be extended
Terms and Conditions For Online-Payments
The Terms and Conditions contained herein shall apply to any person (“User”) using the
services of lajd Maharashtra, hereinafter referred to as “Merchant”, for making Tender fee and
Earnest Money Deposit(EMD) payments through an online Payment Gateway Service
(“Service”) offered by ICICI Bank Ltd. in association with E Tendering Service provider and
Payment Gateway Service provider through lajd Maharashtra website i.e. http://
lajd.maharashtra.etenders.in. Each User is therefore deemed to have read and accepted
these Terms and Conditions.
Privacy Policy
The Merchant respects and protects the privacy of the individuals that access the information
and use the services provided through them. Individually identifiable information about the User
is not willfully disclosed to any third party without first receiving the User's permission, as
covered in this Privacy Policy.
This Privacy Policy describes Merchant’s treatment of personally identifiable information that
Merchant collects when the User is on the Merchant’s website. The Merchant does not collect
any unique information about the User (such as User's name, email address, age, gender etc.)
except when you specifically and knowingly provide such information on the Website. Like any
business interested in offering the highest quality of service to Clients, Merchant may, from time
to time, send email to the User and other communication to tell the User about the various
services, features, functionality and content offered by Merchant's website or seek voluntary
information from The User.
PG. 17
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Please be aware, however, that Merchant will release specific personal information about the
User if required to do so in the following circumstances:
a) in order to comply with any valid legal process such as a search warrant, statute, or court order,
or available at time of opening the tender
b) if any of User’s actions on our website violate the Terms of Service or any of our guidelines for
specific services, or
c) to protect or defend Merchant’s legal rights or property, the Merchant’s site, or the Users of the
site or;
d) to investigate, prevent, or take action regarding illegal activities, suspected fraud, situations
involving potential threats to the security, integrity of Merchant’s website/offerings.
General Terms and Conditions For E-Payment
1. Once a User has accepted these Terms and Conditions, he/ she may register on Merchant’s
website and avail the Services.
2. Merchant's rights, obligations, undertakings shall be subject to the laws in force in India, as well
as any directives/ procedures of Government of India, and nothing contained in these Terms
and Conditions shall be in derogation of Merchant's right to comply with any law enforcement
agencies request or requirements relating to any User’s use of the website or information
provided to or gathered by Merchant with respect to such use. Each User accepts and agrees
that the provision of details of his/ her use of the Website to regulators or police or to any other
third party in order to resolve disputes or complaints which relate to the Website shall be at the
absolute discretion of Merchant.
3. If any part of these Terms and Conditions are determined to be invalid or unenforceable
pursuant to applicable law including, but not limited to, the warranty disclaimers and liability
limitations set forth herein, then the invalid or unenforceable provision will be deemed
superseded by a valid, enforceable provision that most closely matches the intent of the original
provision and the remainder of these Terms and Conditions shall continue in effect.
4. These Terms and Conditions constitute the entire agreement between the User and Merchant.
These Terms and Conditions supersede all prior or contemporaneous communications and
proposals, whether electronic, oral, or written, between the User and Merchant. A printed
version of these Terms and Conditions and of any notice given in electronic form shall be
admissible in judicial or administrative proceedings based upon or relating to these Terms and
Conditions to the same extent and subject to the same conditions as other business documents
and records originally generated and maintained in printed form.
5. The entries in the books of Merchant and/or the Payment Gateway Service Providers kept in
the ordinary course of business of Merchant and/or the Payment Gateway Service Providers
with regard to transactions covered under these Terms and Conditions and matters therein
appearing shall be binding on the User and shall be conclusive proof of the genuineness and
accuracy of the transaction.
6. Refund For Charge Back Transaction: In the event there is any claim for/ of charge back by
the User for any reason whatsoever, such User shall immediately approach Merchant with his/
her claim details and claim refund from Merchant alone. Such refund (if any) shall be effected
only by Merchant via payment gateway or by means of a demand draft or such other means as
Merchant deems appropriate. No claims for refund/ charge back shall be made by any User to
the Payment Gateway Service Provider(s) and in the event such claim is made it shall not be
entertained.
7. In these Terms and Conditions, the term “Charge Back” shall mean, approved and settled
credit card or net banking purchase transaction(s) which are at any time refused, debited or
charged back to merchant account (and shall also include similar debits to Payment Gateway
Service Provider's accounts, if any) by the acquiring bank or credit card company for any
reason whatsoever, together with the bank fees, penalties and other charges incidental thereto.
8. Refund for fraudulent/duplicate transaction(s): The User shall directly contact Merchant for any
fraudulent transaction(s) on account of misuse of Card/ Bank details by a fraudulent
individual/party and such issues shall be suitably addressed by Merchant alone in line with their
policies and rules.
9. Server Slow Down/Session Timeout: In case the Website or Payment Gateway Service
Provider’s webpage, that is linked to the Website, is experiencing any server related issues like
‘slow down’ or ‘failure’ or ‘session timeout’, the User shall, before initiating the second
payment,, check whether his/her Bank Account has been debited or not and accordingly resort
to one of the following options:
i. In case the Bank Account appears to be debited, ensure that he/ she does not make the
PG. 18
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
payment twice and immediately thereafter contact Merchant via e-mail or any other mode of
contact as provided by Merchant to confirm payment.
ii. In case the Bank Account is not debited, the User may initiate a fresh transaction to make
payment. However, the User agrees that under no circumstances the Payment Gateway
Service Provider shall be held responsible for such fraudulent/duplicate transactions and hence
no claims should be raised to Payment Gateway Service Provider No communication received
by the Payment Gateway Service Provider(s) in this regard shall be entertained by the Payment
Gateway Service Provider.
Limitation of Liability
1. Merchant has made this Service available to the User as a matter of convenience. Merchant
expressly disclaims any claim or liability arising out of the provision of this Service. The User
agrees and acknowledges that he/ she shall be solely responsible for his/ her conduct and that
Merchant reserves the right to terminate the rights to use of the Service immediately without
giving any prior notice thereof.
2. Merchant and/or the Payment Gateway Service Providers shall not be liable for any inaccuracy,
error or delay in, or omission of (a) any data, information or message, or (b) the transmission or
delivery of any such data, information or message; or (c) any loss or damage arising from or
occasioned by any such inaccuracy, error, delay or omission, non-performance or interruption
in any such data, information or message. Under no circumstances shall the Merchant and/or
the Payment Gateway Service Providers, its employees, directors, and its third party agents
involved in processing, delivering or managing the Services, be liable for any direct, indirect,
incidental, special or consequential damages, or any damages whatsoever, including punitive
or exemplary arising out of or in any way connected with the provision of or any inadequacy or
deficiency in the provision of the Services or resulting from unauthorized access or alteration of
transmissions of data or arising from suspension or termination of the Services.
3. The Merchant and the Payment Gateway Service Provider(s) assume no liability whatsoever
for any monetary or other damage suffered by the User on account of:
(I) the delay, failure, interruption, or corruption of any data or other information transmitted in
connection with use of the Payment Gateway or Services in connection thereto; and/ or
(ii) any interruption or errors in the operation of the Payment Gateway.
4. The User shall indemnify and hold harmless the Payment Gateway Service Provider(s) and
Merchant and their respective officers, directors, agents, and employees, from any claim or
demand, or actions arising out of or in connection with the utilization of the Services.
The User agrees that Merchant or any of its employees will not be held liable by the User for any
loss or damages arising from your use of, or reliance upon the information contained on the
Website, or any failure to comply with these Terms and Conditions where such failure is due to
circumstance beyond Merchant’s reasonable control.
Miscellaneous Conditions :
1. Any waiver of any rights available to Merchant under these Terms and Conditions shall not
mean that those rights are automatically waived.
2. The User agrees, understands and confirms that his/ her personal data including without
limitation details relating to debit card/ credit card transmitted over the Internet may be
susceptible to misuse, hacking, theft and/ or fraud and that Merchant or the Payment Gateway
Service Provider(s) have no control over such matters.
3. Although all reasonable care has been taken towards guarding against unauthorized use of any
information transmitted by the User, Merchant does not represent or guarantee that the use of
the Services provided by/ through it will not result in theft and/or unauthorized use of data over
the Internet.
4. The Merchant, the Payment Gateway Service Provider(s) and its affiliates and associates shall
not be liable, at any time, for any failure of performance, error, omission, interruption, deletion,
defect, delay in operation or transmission, computer virus, communications line failure, theft or
destruction or unauthorized access to, alteration of, or use of information contained on the
Website.
5. The User may be required to create his/ her own User ID and Password in order to register
and/ or use the Services provided by Merchant on the Website. By accepting these Terms and
Conditions the User agrees that his/ her User ID and Password are very important pieces of
information and it shall be the User’s own responsibility to keep them secure and confidential.
In furtherance hereof, the User agrees to;
i. Choose a new password, whenever required for security reasons.
ii. Keep his/ her User ID & Password strictly confidential.
PG. 19
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
iii. Be responsible for any transactions made by User under such User ID and Password.
The User is hereby informed that Merchant will never ask the User for the User’s password in
an unsolicited phone call or in an unsolicited email. The User is hereby required to sign out of
his/ her Merchant account on the Website and close the web browser window when the
transaction(s) have been completed. This is to ensure that others cannot access the User’s
personal information and correspondence when the User happens to share a computer with
someone else or is using a computer in a public place like a library or Internet café.
Debit/Credit Card, Bank Account Details
1. The User agrees that the debit/credit card details provided by him/ her for use of the aforesaid
Service(s) must be correct and accurate and that the User shall not use a debit/ credit card,
that is not lawfully owned by him/ her or the use of which is not authorized by the lawful owner
thereof. The User further agrees and undertakes to provide correct and valid debit/credit card
details.
2. The User may make his/ her payment(Tender Fee/Earnest Money deposit) to Merchant by
using a debit/credit card or through online banking account. The User warrants, agrees and
confirms that when he/ she initiates a payment transaction and/or issues an online payment
instruction and provides his/ her card / bank details:
i. The User is fully and lawfully entitled to use such credit / debit card, bank account for
such transactions;
ii. The User is responsible to ensure that the card/ bank account details provided by him/
her are accurate;
iii. The User is authorizing debit of the nominated card/ bank account for the payment of
Tender Fee and Earnest Money Deposit
iv. The User is responsible to ensure sufficient credit is available on the
nominated card/ bank account at the time of making the payment to permit the
payment of the dues payable or the bill(s) selected by the User inclusive of the
applicable Fee.
Personal Information
3. The User agrees that, to the extent required or permitted by law, Merchant and/ or the Payment
Gateway Service Provider(s) may also collect, use and disclose personal information in
connection with security related or law enforcement investigations or in the course of
cooperating with authorities or complying with legal requirements.
4. The User agrees that any communication sent by the User vide e-mail, shall imply release of
information therein/ therewith to Merchant. The User agrees to be contacted via e-mail on such
mails initiated by him/ her.
5. In addition to the information already in the possession of Merchant and/ or the Payment
Gateway Service Provider(s), Merchant may have collected similar information from the User in
the past. By entering the Web site the User consents to the terms of Merchant’s information
privacy policy and to our continued use of previously collected information. By submitting the
User’s personal information to us, the User will be treated as having given his/her permission
for the processing of the User’s personal data as set out herein.
6. The User acknowledges and agrees that his/ her information will be managed in accordance
with the laws for the time in force.
7. Payment Gateway Disclaimer
The Service is provided in order to facilitate payment of Tender Fees/Earnest Money Deposit
online. The Merchant or the Payment Gateway Service Provider(s) do not make any
PG. 20
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
representation of any kind, express or implied, as to the operation of the Payment Gateway
other than what is specified in the Website for this purpose. By accepting/ agreeing to these
Terms and Conditions, the User expressly agrees that his/ her use of the aforesaid online
payment service is entirely at own risk and responsibility of the User.
Sr. Type of
Brief detailed of document required
no. Document
The first envelope clearly marked as envelope No.-1 shall contain forwarding letter clearly indicating the
following documents.
1. The Blank Tender Fees and EMD if applicable will be paid via online mode or if Compulsory
exemption certificate is available then valid certificate of exemption from payment of
earnest money should be Scanned from original copy.
Scan Copy Registered Electrical Contractor of P.W.D. Govt. of Maharashtra or Compulsory
2
C.P.W.D. in Class “A‟, Valid Company/ Firm Registration Certificate.
4 Scan Copy of Valid G.S.T. Registration. Compulsory
Scan Copy of Permanent Account Number (PAN) allotted by Income Tax Department Compulsory
5
in the name of firm.
6 Scan Copy of Partnership Deed in case of Partnership Firm, Memorandum / Article of If Applicable
Association in case of Company & Power of Attorney.
7 Scan copy of Details of work tendered for & in hand. (Information to be given in Compulsory
Statement- I) (work orders & completion certificate must be attached)
8 Scan copy of the magnitude of works done by the Contractor in Government / Non- Compulsory
Government Sector, out of which the magnitude of one single similar type of work
done by the Contractor not less than Rs 30/- Lakhs (30% of Tender amount)
9 Scan copy Statement showing average Annual Turnover for the last three years Compulsory
(2015-16, 2016-17, 2017-18) of magnitude of Certificate from the registered
chartered accountant, not less than Rs.105/- Lakhs (100% of Tender amount)
(Work Completion Certificate & Performance Certificate )
10 Scan copy of List of Tools and Plant and Machinery available with the Tenderer Compulsory
which will be used for this work.
11 Scan copy of Details of Technical persons on the roll of Tenderer. (Recent copy of Compulsory
muster should be attached in support)
12 Scan Copy of acknowledged income tax return filed last three financial years. Compulsory
(Financial Year 2015-16, 2016-17, 2017-18)
13 Scan copy of The bidder should provide affidavit duly notarized (On Rs. 100/-stamp Compulsory
paper), verifying that neither the Tenderer, nor the OEM have been black listed/
banned / suspended.
14 Scan copy of the affidavit duly notarized (On Rs. 100/-stamp paper), stating that Compulsory
documents submitted in Envolope-1 are true.
PG. 21
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The second online envelope "Envelope No.2" shall contain only the main tender
including the Common Set of Conditions / Deviation issued by the Department after the
pre-tender Conference. A tender submitted without this would be considered as invalid.
The Tenderer should quote his offer duly signed in terms of percentage of
estimated rates at the appropriate place of tender documents to be submitted
only in Envelope No.2 He should not quote his offer any where directly or indirectly
in Envelope No. 1. The contractor shall quote for the work as per details given in
the main tender and also based on the detailed set of conditions issued /
Additional stipulations made by the Department as informed to him by a letter
from Chief Engineer / Superintending Engineer after Pre-Tender Conference. His
tender shall be unconditional.
On the date, specified in the Tender Schedule, following procedure will be adopted for
opening of the Tender.
First of all Envelope No.1 of the tender will be opened online to verify its contents as
per requirements. If the various documents contained in this envelope do not meet
the requirements of the Department, a note will be recorded accordingly by the tender
opening authority and the said tenderers Envelope No. 2 will not be considered for
further action and the same will be recorded.
The decision of the tender opening authority in this regard will be final and binding on
the contractors.
PG. 22
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
This envelope shall be opened online immediately after opening of Envelope No.1,
only if contents of Envelope No.1 are found to be acceptable to the Department. The
tenderedratesin Schedule 'B' or percentage above/below the estimated
rates shall then be read out. in the presence of bidders who remain present at the time of
opening of Envelope No.2.
b) Earnest money of minimum Rs. 1,000,000/-shall be paid via online using NEFT/RTGS or
payment gateway mode.After Tender opening, the EMD of the unsucessfull bidder will be
returned to account provided by the bidder during the bid prepration as given in challan
under Beneficiary Account Number.
Earnest Money in the form of cheques or any other form except above will not be accepted.
(iii) The amount will be refunded to the unsuccessful tenderers on deciding about the acceptance
or otherwise of the tender. In case of successful tenderer, it will be refunded on his paying initial
(iv) In case of Joint Venture, Earnest money Exemption certificate in individual capacity will not be
accepted. Earnest money shall be be paid via online using NEFT/RTGS or payment gateway
mode. The Security Deposit, additional security deposit etc. in the form of T.D.R. / F.D.R.
issued in the name of Joint Venture Company drawn by scheduled bank having branches in
Rukmini Mandire Samiti. for the period of one year will be considered
3.10.1 The successful tenderer shall have to pay 50% initial security deposit in cash or in shape
of National Saving Certificate or Fixed Deposit Receipt or Bank Guarantee in favor of
The Executive Officer, Shri. Vitthal Rukmini Temples Committee,
Pandharpur or Bank Guarantees from a Nationalized / Scheduled Banks in the
enclosed form and complete the contract documents failing which his earnest money
will be forfeited to Government. The balance 50% security deposit will be recovered from
the R.A. bill at 4% of the bill amount. Amount of total Security Deposit to be paid shall be
4% of the cost of accepted tender or estimated cost put to tender whichever is higher.
3.10.2 All compensation or other sums payable by the Contractor under the terms of this contract
or any other contract or on any account may be deducted from his Security Deposit or from
any sums which may be due to him or may become due to him by Government on any
PG. 23
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
account and in the event of the security being reduced by reason of any such above
noted deductions, the Contractor shall within 10 days of receipt of notice of demand from
the Engineer-in-charge make good the deficit.
3.10.3 There shall be no liability on the Department to pay any interest on the Security
Deposited by or recovered from the Contractor.
3.10.4 The Security Deposit shall be refunded after completion of defect liability period prescribed
for this contract.
3.10.5 In case the tender offer the rates more than 15% Below/above of tender amount, he shall to
pay additional security deposit at the rate of 15% of the amount exceeding 15%
below/above of the tender amount before acceptance of tender for assurance of good
performance if the work such additional security deposit shall paid in the form of team
deposit receipt valid for 18 month of any schedule Bank or nationalized bank EMD shall be
forfeited to the government. If additional security deposit is not remitted additional security
deposit shall be refunded along with final bill. (Reference: - Irrigation Department. Circular
No. Appendix 1097 (105/97) Mantralaya, Mumbai Dated 22 May 1998)
3.11 The tenders who do not fulfill the condition of the notification and the general rules and
directions for the guidance of contractor in the agreement form or are incomplete in any
respect are likely to be rejected without assigning any reason therefore.
3.12 (a) The Tenderers shall be presumed to have carefully examined the drawings,
conditions and specifications of the work and have fully acquainted themselves with all
details of the site, in general with all the necessary information and data pertaining to the
work, prior to tendering for the work.
(b) The data whatsoever supplied by the Department along with the tender documents
are meant to serve only as guide for the tenderers while tendering and the Department
accepts no responsibility whatsoever either for the accuracy of data or for their
comprehensiveness.
If the tenderers are a firm or company, they should in their forwarding letter mention the
names of all the partners together with the name of the person who holds the power of
Attorney, authorizing him to conduct all transactions on behalf of the body, along with the
tender.
3.14 The contractor or the firms tendering for the work shall inform the Department if they appoint
their authorized Agent on the work.
3.15 No foreign exchange will be released by the Department for the purchase of plants and
machinery for the work by the Contractor.
3.16 Any dues arising out of contract will be recovered from the contractor as arrears of Land
Revenue, if not paid amicably. Moreover, recovery of Government dues from the
Contractors will be affected from the payment due to the Contractor from any other
Government works under execution with them.
3.17 All pages of tender documents, conditions, specifications, correction slips etc. shall be
initialed by the tenderer. The tender should bear full signature of the tenderer, or his
authorized power of Attorney holder in case of a firm.
PG. 24
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
3.18 The Income Tax at 2.00 % including surcharge or percentage in force from time to time or at
the rate as intimated by the competent Income Tax authority shall be deducted from bill
amount whether measured bill, advance payment or secured advance.
3.19 The successful tenderer will be required to produce, to the satisfaction of the specified
concerned authority a valid concurrent license issued in his favor under the provisions
of the Contract Labour (Regulation and Abolition) Act
1970 for starting the work. On failure to do so, the acceptance of the tender
shall be liable to be withdrawn and also liable for forfeiture of the earnest money.
3.20 The tenderer shall submit the list of apprentices engaged by the Contractor under
Apprentice Act.
The offer shall remain open for acceptance for minimum period of 120 days from the Date
of opening of Envelope No.2 (Financial Bid) and thereafter until it is withdrawn by the
contractor by notice in writing duly addressed to the authority Opening the tender and sent
by Registered Post Acknowledgment due.
3.22 The contractor will have to sign the hard copy of the tender papers and the drawings
according to which the work is to be carried out. The contractor shall also have to give a
declaration to the effect that, he has fully studied the plans , specifications, local conditions
and availability of labour and materials and that he has quoted his rates with the
consideration to all these factors.
PG. 25
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
TECHNICAL SPECIFICATION
ENGINEERING BLOCK
Unit shall be air cooled split type multi-system air conditioner consisting of one outdoor unit
multi indoor units, each having capability to cool independently for the requirements of the
rooms.
Up to 16 different type and capacity indoor units to be connected to one refrigerant circuit
and controlled individually.
Compressors shall be equipped with inverter scroll controller and capable of changing the
rotating speed to follow variations in cooling load.
The unit supplied should be suitable for 415+/-10 Volts. If required the vendor should check
the voltage personally at site before submitting their offer.
Outdoor unit.
The outdoor unit shall be a factory assembled unit housed in a sturdy weather proof casing
constructed from rust-proofed mild steel panels coated with a baked enamel finish and a coil
guard.
The outdoor unit shall have multiple of Scroll inverter compressors and be able to operate
even in case that one of the compressors is out of order.
The connectable range of indoor units shall be from 0.8HP to 37.5 HP with all outdoor units.
PG. 26
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The noise level shall not be more than 48 dB(A) normal operation for the cassette while for
High wall and exposed units it shall be 37dB(A) measured horizontally 1m away and 1.5m
above ground.
The outdoor unit shall be modular in design and should be allowed for side by side
installation.
Compressor:
The compressor shall be highly efficient Scroll type and capable of Inverter control. :
All outdoor units shall have multiple steps of capacity control to meet load
fluctuation and indoor unit individual control. All parts of compressor shall be
sufficiently lubricated stock. Forced lubrication may also be employed.
Oil heater shall be provided in the compressor casing.
The Variable compressor shall be at Nominal Capacity at Indore condition.
Compressor shall be deliver 100% capacity as per mentioned in the BOQ @ 43 Deg
C. (Pandharpur- Solapur)
Heat Exchanger:
The heat exchanger shall be constructed with copper tubes mechanically bonded to
aluminum fins to form a cross fin coil the coils and the aluminum fins shall be covered by anti-
corrosion resin film.
The unit shall be provided with necessary number of direct driven low noise level propeller
type fans arranged for vertical discharge. Each fan shall have a safety guard.
Refrigerant circuit
The refrigerant circuit shall include an accumulator, liquid and gas shut off valves, sight glass
and a solenoid valve. All necessary safety devices shall be provided to ensure the safety
operation of the system. The refrigerant piping /interconnecting cabling has to on in steel
tray.
The equipment must have in built refrigerant stabilization control for proper refrigerant
distribution.
SAFETY DEVICES:
The following safety devices shall be part of the outdoor unit. High pressure switch, low
pressure switch, fan motor safety thermostat, inverter, overload protector, over current
relay, under voltage monitor fusible plugs, fuses.
PG. 27
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Unit shall be equipped with an automatic oil recovery system to ensure stable operation with
long refrigerant piping.
The system must be provided with oil balancing circuit to avoid poor lubrication.
INDOOR UNIT.
Each indoor unit shall be of ceiling mounted ducted type or ceiling mounted cassette type or
High wall type as specified in scope of work. It shall have electronic control valve which
control refrigerant flow rate in respond to load variations of the room. The fan shall be DIDW
of the dual suction multi blade type and statically and dynamically balanced to ensure low
noise and vibration free operation.
The address of the indoor unit shall be set automatically in case of individual and group
control.
In case of centralized control, it shall be set by liquid crystal remote controller.
The units shall be ceiling mounted type. The housing of the unit shall be of powder coated
galvanized steel and shall include pre-filter, fan section, coil section etc. The body shall be
light in weight and shall be able to suspend from four corners.
The fan shall be aerodynamically designed DIDW centrifugal type. The fan shall be mounted
directly on motor shaft having supported from housing. The fan shaft shall be statically and
dynamically balanced. The fan shall be direct driven type.
The cooling coil shall be of seamless copper tubes and shall have continuous aluminum fins.
The tubes shall be staggered in the direction of airflow. The fins shall be uniformly bonded to
the tubes by mechanical expansion of the tubes. The coils shall be tested against leaks.
Unit shall have filter cleanable type of resin net (with mold resistant) fixed to an integrally
molded plastic frame. The filter should be slid away type but neatly inserted.
Unit shall have an external supply air outlet flange for connection to damper and duct and
with fresh air intake provision (if required), low gas level detection system.
Each unit shall have an electronic expansion valve which control refrigerant flow rate in
respond to load variations of room. Each unit shall also have a pressure sensor.
The computerized PID control shall be used to maintain a correct room temperature. Each
unit to be provided with microprocessor thermostat for cooling or cooling and heating.
Each unit shall be with wired remote/cordless controller LCD type. The LCD remote controller
shall memorize the latest malfunction code for easy maintenance.
PG. 28
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The unit shall be ceiling mounted type. The unit shall include pre-filter, fan section and DX-
coil section. The housing of the unit shall be powder coated galvanized steel. The body shall
be light in weight and shall be able to suspend from four corners. The fan shall be
aerodynamically designed diffuser turbo fan type.
Unit shall have an external attractive panel for supply and return air. Unit shall have four way
supply air grilles on sides and return air grille in center.
Each unit shall have high lift drain pump, fresh air intake provision (if specified) Low gas
detection system and very low operating sound.
All the indoor units regardless of their difference in capacity should have same decorative
panel size for harmonious aesthetic point of view. It should have provision of connecting
branch ducts.
The units shall be complete with motors, fans, cooling coils, condenser coils, control package,
cleanable filter, facia grille and casing
INSULATION:
Scope:
The Scope of this section comprises supply and fixing of insulation as specified. All insulating
materials in the form in which it is used and under the condition anticipated shall not ignite,
support combustion or release toxic gases when subject to fire or heat including adhesives.
All materials used for acoustical insulation shall be resin bonded fiber glass of density and
thickness as specified or indicated on the drawing. All materials used for acoustical insulation
shall be Armaflex closed cell electrometric nitrite rubber class ‘O’. All sun exposed roof shall
have photothermal under deck insulation of the density and thickness specified.
Manufacturers’ recommendation for application & safety shall be strictly adhered to.
CONTROL:
Each unit shall be provided with Corded /Cordless remote for ON/OFF, temperature setting,
fan speed, louver oscillation.
PG. 29
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Compressors/Condensers/Evaporators etc.
Indoor Units:
Blowers
Coils
Pneumatic test or as per manufacturer.
Visual examination.
Inspection of raw materials to be used for fabrication and assembly and inspection of
manufacturer’s certificates.
Pressure testing of pipe fit used for the refrigerant and water services.
Pressure testing, leak testing of complete piping network. Condenser for refrigerant/
services.
Checking of electrical circuits (power & controls) and checking functioning of controls
of refrigerant systems and other circuits of air conditioning system.
PG. 30
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Electrical Equipment:
Electrical Contractor Scope of work, excluding specified in HVAC BOQ
Performance Tests:
The installation as a whole shall be balanced and tested upon completion, and all
relevant information, including the following shall be submitted to the architects.
Electrical current readings, in amperes of full and average load running, and starting,
together with name plate current of each electrical motor.
Continuous recording over a specified period, of ambient wet and dry bulb
temperatures under varying degrees of internal heat loads and use and occupation,
in each zone of each part of the building.
Daily records should be maintained of hourly readings, taken under varying degrees of
internal heat load and use and occupation, of wet and dry bulb temperatures. The
current and voltage drawn by each machine.
Any other readings shall be taken which may subsequently be specified by the
architect.
Miscellaneous:
The above tests are mentioned herein for general guidance and information only
but not by way of limitation to the provisions of conditions of contract and
specification.
The date of commencement of all tests listed above shall be subject to the approval of
the Engineer and in accordance with the requirements of this specification.
The contractor shall supply the skilled staff and all necessary instruments and carry
out any test of any kind on a piece of equipment, apparatus, part of system or on a
complete system if the architect requests such a test for determining specified or
guaranteed data as given in the specification or on the drawings.
Any damage resulting from the tests shall be repaired and/or damaged
material replaced, all the satisfaction of the Engineer.
In the event of any repair or any adjustment having to be made, other than normal
running adjustment, the tests shall be void and shall be recommended after the
adjustment or repairs have been completed.
The contractor must inform the Engineer when such tests are to be made, giving
sufficient notice, in order that the Engineer or his nominated representative may be
present.
Complete records of all tests must be kept and 3 copies of these and location drawings
must be furnished to the Engineer.
The contractor may be required to repeat the test as required, should the ambient
conditions at the time not given, in the opinion of the architect, sufficient and
suitable indication of the effect and performance of the installation as a whole or of
any part, as required.
PG. 31
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
1.1.5 Type --
1.2.1.1 Type --
PG. 32
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The contractor shall prepare all necessary general arrangement and fabrication drawings and
these shall be submitted to the Consultant for comments before manufacture is commenced.
The verification and site checking of all dimensions shall be the responsibility of the HVAC
contractor.
The following details are required for review and approval before commencing any
installation.
For each drawing, all supply of copper piping & machine work must be accompanied by
computer generated detailed Schedule of materials indicating all relevant pipe sizes,
dimensions and quantities. In addition, summary sheets are also to be provided.
All cutting, folding notching, beading, shearing operations must be done by machines
(CAD/CAM equipment preferred) for accuracy of parts and speed of fabrication. Fabricator to
supply brochures and other documentation showing list of equipment used, manufacturing
processes involved and also Quality Assurance Plan for approval. Exercise special care to
provide light fittings well fabricated, well braced duct work system.
PG. 33
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The consultant/Owner or their authorities reserves the right to peruse the weights,
dimensions etc., of the insulation material supplied. Samples of all insulation materials
specified in various forms shall be submitted by the Contractor. The customer/consultant
shall have the right to reject all supplies, which do not conform to the specification and to the
samples so approved. Each lot of insulation material delivered at site shall be accompanied
with manufacturer’s test certificates for thermal conductivity values and density. Samples of
insulation material at each lot delivered at site shall be subjected at random for approval,
shall be gotten tested for thermal conductivity and density at contractor’s cost. All insulation
work shall be carried out by skilled workman, specially trained in this kind of work.
Sample of sheet from each lot selected at random by the Employer shall be subject to
approval and get tested for thickness and zinc coating at HVAC contractor expenses. Further
any duct run which in the opinion of the Owner/ owner’s representative is of poor
workmanship and not installed properly shall be removed from site and new ducting shall be
provided at HVAC contractor’s cost.
Copper piping shall be stored and handled as per manufacturer’s instruction. During erection,
open ends left on pipes shall be covered with polyethylene sheet or waste sheet at open ends
to prevent ingress of dust and builders rubble inside. All piping work and plant is to be
cleaned thoroughly internally before it becomes inaccessible due to the progress of works.
The contractor shall provide and neatly erect all copper pipe work as shown on drawings or
as may be required to carry out the intent of these specifications and drawings and this work
shall meet with the approval of the
PG. 34
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The rates furnished in the Schedule of Quantities will apply for the entire
project.
Any item of work which is not covered in the Schedule of Quantities (read with
the General Conditions of Contract) which may be required to be carried out
on site shall be executed by the Contractor and payment for such items of
work shall be made as per the terms indicated in the tender.
No material of any kind will be supplied by the Employer and the Contractor
must take his own arrangements to procure all the required materials
conforming to the relevant Indian Standard Specifications. In the absence of
any Indian Standard Specification for any material, such material shall be the
best of its kind and approved by the Consultant. All materials (including water)
proposed to be used on the works should be got tested by the Contractor at
his cost as may be required by the Consultant from approved laboratory and
test results shall be submitted to Consultant for approval. Only those materials
(including water) approved by the Consultant are to be used on the Works.
The Contractor will be expected to employ on the Work skilled employees with
Experience of that particular work.
All incidental expenses towards employment of all kinds of labor necessary for
the execution of the works such as compliance with all legislations in respect of
wages and welfare schemes as applicable (such as payment of Minimum
wages, Regulation and Control of contract Labor, ESI scheme, Provident Fund,
etc.) shall be responsibility of the Contractor.
The normal hours of work on the site are from 08.00 hours to 18.00 hours .
Specific permission of the Employer shall be taken for working outside the
normal working hours and on holidays.
All employees of the Contractor, while on duty within the premises, shall wear
Identification badges provided by the Contractor consistent with the security
Rules of the Employer.
PG. 35
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The Contractor shall ensure that all notices displayed on the Site and any
Instructions issued by the Employer are strictly adhered to by the
Contractor’s Employees.
4.0 REPORTING:
From the Date of Commencement of the Contract, the Contractor must report
the following information to the Employer in writing. until the Date of
Completion:
Progress achieved.
Expected dates for completion of various phases of the work.
No excavation will be started without the permission of the Employer who will
Inform the Contractor of the position of any pipes or cables known to be
buried
In the area. All excavations must be effectively railed off at all times, or
completely boarded over and properly marked during the hours of darkness
by red warning lamps, and using flame proof warning lamps in non-smoking
areas. During the hours of darkness heaps of debris or material which cannot
be immediately removed must be heaped in such a way so as to leave
adequate pathway.
The Contractor will notify the Employer of his intention to bring on to the site
Any equipment such as space heating or welding apparatus, or any container
Holding or any container holding liquid or gaseous fuel or other substance
which might create a hazard. The Employer will have the right to prohibit the
use of such equipment or to prescribe the conditions under which such
equipment may be used.
The Employer will have the right to inspect any construction plant, and to
forbid its use if in his opinion it is unsuitable or unsafe. No claim arising
therefrom shall Be made by the Contractor nor entertained by the Employer.
The Contractor or anyone acting on his instructions will not bring on to the site
Any radio-active substance or any apparatus using such substance or any X-ray
Apparatus until written permission and direction regarding the use of such
Equipment has been received from Employer.
The Contractor will meet all requirements and act on the instructions of the
Employer where it is necessary to operate a “Permit-to-Work “system.
The Contractor shall have his own firefighting extinguishers and equipment’s
as Per statutory requirements and normal safety regulations.
The Contractor shall be solely responsible for providing all necessary safety
Notices and safety equipment and PPE for the labor that, may be required
under applicable Central,
PG. 37
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Adherence to PPE: Workers and supervisors will be allowed inside the factory
premises only with the P.P.E prescribed by Safety Department
Only those drawing shall be submitted as per the system installed at site.
C. Temperature readings chart, recorded during air balancing (indoor & outdoor).
H. All submittal (initial test reports) for any BOQ items should be incorporated in this
Document.
All the above shall be handed over (spiral binding set) to the Consultant which shall be
Then forwarded to the Client after duly checking of the same.
Delivery Period : 2-3 Weeks from the date of the receipt of the PO by the tenderer.
Completion Period : The total job shall be completed and commissioned within 8
weeks from the date of the receipt of the PO by the tenderer.
Payment Terms : 10% advance against Advance Bank Guarantee, 50% against the
delivery of the material at the site duly certified the concerned authority, 20% against
the installation duly certified the concerned authority, 10% against the commissioning
and handing over and 10% against PBG valid for the period of 1 year from the date of
Handing over the job to the client.
PG. 39
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
SCHEDULE- B
The work includes supply, fabrication, erection, testing and commissioning of the complete air-conditioning plant. The
schedule of quantities required for the project has been listed below. The Tenderer Shall fill in the columns of rate and
amount and submit the same along with the proposal. The Tenderer shall clearly adhere to the Technical Specifications,
attached separately & the List Of Approved Makes. No deviations will be accepted by the Owner/Buyer.
TOTAL
UNIT RATE
AMOUNT
SR.NO ITEM DESCRIPTION UNIT QTY
SUPPLY INSTALLATION SUPPLY INSTALLATION
PG. 40
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
PG. 41
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The work includes supply, fabrication, erection, testing and commissioning of the complete air-conditioning plant. The
schedule of quantities required for the project has been listed below. The Tenderer Shall fill in the columns of rate and
amount and submit the same along with the proposal. The Tenderer shall clearly adhere to the Technical Specifications,
attached separately & the List Of Approved Makes. No deviations will be accepted by the Owner/Buyer.
TOTAL
UNIT RATE
SR.NO ITEM DESCRIPTION UNIT QTY AMOUNT
SUPPLY INSTALLATION SUPPLY INSTALLATION
Unloading, Installation,
Testing, lifting, shifting &
Commissioning of VRV/ VRF
Outdoor Units of following
type & capacities complete
with Rigging, Anchor
Fasteners, Threaded Rods, 2
1
Layered 10mm thick Ribber
Rubber Pads with 24 Gauge
GI Shim in-between, GI Nuts
& Bolts etc., The outdoor
unit shall be supported in all
the four corners and bolted
through to the M S Stand.
1.1 68 HP Nos 1 0 70000 0 70000
Unloading, Installation,
Testing, lifting, shifting &
Commissioning of VRV/ VRF
Indoor Units of following
type & capacities complete
2
with Anchor Fasteners,
Threaded Rods, Rubber
Gourmets, GI Nuts & Bolts,
Canvass for Hide Away Units
etc.,
A Hi Wall Type Indoor Unit
2.1 1.3 TR - 448 CFM Nos 34 0 3000 0 102000
2.2 1.5 TR - 500 CFM Nos 17 0 3000 0 51000
PG. 42
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
PG. 44
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
PG. 46
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The work includes supply, fabrication, erection, testing and commissioning of the complete air-conditioning plant. The
schedule of quantities required for the project has been listed below. The Tenderer Shall fill in the columns of rate and
amount and submit the same along with the proposal. The Tenderer shall clearly adhere to the Technical Specifications,
attached separately & the List Of Approved Makes. No deviations will be accepted by the Owner/Buyer.
UNIT RATE TOTAL AMOUNT
SR.NO ITEM DESCRIPTION UNIT QTY
SUPPLY INSTALLATION SUPPLY INSTALLATION
Supply of VRV/ VRF Outdoor
Condensing Units of
following actual capacities
complete with Inverter
Scroll Compressors,
Standard Compressor,
Condenser Coil, Condenser
Fan with VFD, Necessary
Refrigerant Piping with
1
necessary interlocks, Oil
return circuit,
Microprocessor Controller
etc., Capable of running on
R410c / R407a Refrigerant.
(Necessary combination to
submit by the contractor /
supplier), (With Multikits
wherever required)
Note- Derating to consider
as per Pandharpur (solapur)
condition and the
equipment should deliver
actual capacities as
mentioned in BOQ. OEM
confirmation required along
with quote. 43 Deg C.
1.1 46 HP Nos 1 895000 895000 0
PG. 48
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
The work includes supply, fabrication, erection, testing and commissioning of the complete air-conditioning plant. The
schedule of quantities required for the project has been listed below. The Tenderer Shall fill in the columns of rate and
amount and submit the same along with the proposal. The Tenderer shall clearly adhere to the Technical Specifications,
attached separately & the List Of Approved Makes. No deviations will be accepted by the Owner/Buyer.
UNIT RATE TOTAL AMOUNT
SR.NO ITEM DESCRIPTION UNIT QTY
SUPPLY INSTALLATION SUPPLY INSTALLATION
Unloading, Installation,
Testing, lifting, shifting &
Commissioning of VRV/ VRF
Outdoor Units of following
type & capacities complete
with Rigging, Anchor
Fasteners, Threaded Rods,
1 2 Layered 10mm thick
Ribber Rubber Pads with 24
Gauge GI Shim in between,
GI Nuts & Bolts etc., The
outdoor unit shall be
supported in all the four
corners and bolted through
to the M S Stand.
1.1 46 HP Nos 1 0 38000 0 38000
Unloading, Installation,
Testing, lifting, shifting &
Commissioning of VRV/ VRF
Indoor Units of following
type & capacities complete
2
with Anchor Fasteners,
Threaded Rods, Rubber
Gourmets, GI Nuts & Bolts,
Canvass for Hide Away
Units etc.,
A Hi Wall Type Indoor Unit
2.1 0.8 TR - 358 CFM Nos 40 0 3000 0 120000
Cassette Four Way Type
B
Indoor Unit
2.2 1.7 TR - 650 CFM Nos 5 0 5000 0 25000
2.3 2.8 TR - 945 CFM Nos 1 0 5000 0 5000
2.4 3.2 TR - 1095 CFM Nos 1 0 5000 0 5000
PG. 49
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
PG. 52
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
Total Estimate
A 3258368.00
B 2098258.00
C 2611200.00
D 2020013.00
Grand Total for (A+B+C+D) 99,87,839/-
PG. 53
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
PG. 54
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
A Wing Drawing
PG. 55
“A” & “E” WING
SHRI. VITHAL RUKMANI TEMPLES COMMITTEE- PHANDARPUR, DIST-SOLAPUR
E Wing Drawing
PG. 56
“A” & “E” WING
Compensation or any sums owed by the contractor under the contract terms or any other account may be deducted from the security deposit or any other amounts due to the contractor from government contracts. If such deductions reduce the security deposit, the contractor must replenish the deficit within 10 days of receiving notice of demand. This ensures that contractors maintain adequate financial backing to meet their obligations and cover any potential compensation claims .
The initial security deposit required is 50% of the total security amount, which can be paid in cash, National Saving Certificate, Fixed Deposit Receipt, or Bank Guarantee in favor of the Executive Officer. The balance 50% is recovered from the Running Account bills at 4% per bill. The total security deposit is 4% of the cost of the accepted tender or estimated cost, whichever is higher. This initial deposit may be provided in Bank Guarantee form for the entire project duration, and it should be extendable if the project period extends .
Tenderers must adhere strictly to the technical specifications provided without any deviations. The owner's/buyer's acceptance is contingent upon compliance with these specifications, and any deviation may lead to the rejection of the tender. This requirement ensures that all tenders are evaluated on a standard set of criteria and that the project meets its technical and performance standards .
If the tenderer is a firm or company, they must mention in their forwarding letter the names of all partners and the individual who holds the power of attorney, authorizing him to conduct all transactions related to the tender on behalf of the firm. This ensures accountability and clear communication regarding authority in tendering processes .
Contractors are expected to have carefully examined the drawings, conditions, and specifications and fully familiarized themselves with all site details and project data before tendering. The data provided by the department serves as a guide, but the department does not guarantee its accuracy. Contractors' understanding is evaluated on their capability to interpret these details correctly and their readiness to assume full responsibility for their offers, which influences the acceptance of their proposal .
The earnest money must be paid online either through NEFT/RTGS or a payment gateway. It is not accepted in any other form, such as cheques. For successful tenderers, the earnest money is refunded upon paying the initial security deposit and completing the tender documents. For unsuccessful tenderers, the refund is processed after the acceptance decision of the tender. In a joint venture, an individual capacity exemption certificate for earnest money is not accepted .
If a contractor owes dues under a particular contract, the department can recover these as arrears of land revenue or adjust them against payments due from other government projects the contractor is engaged with. This means the contractor must ensure financial compliance in all engagements, as dues are cross-recovered, impacting their cash flow and financial standing in ongoing and future projects .
If a tenderer proposes rates 15% below or above the tender amount, they must pay an additional security deposit of 15% of the amount exceeding this range as assurance of good performance. This additional security deposit must be a term deposit receipt from a scheduled or nationalized bank, valid for 18 months. If the tenderer fails to remit this deposit, the earnest money is forfeited to the government. This condition ensures that the tenderer's proposal is backed by financial assurance to cover any performance-related risks .
The pre-tender conference allows prospective tenderers who have downloaded the tender form to obtain clarifications about the work and tender conditions. Any points raised during the conference, if not included in the Common Set of Conditions/Deviations (C.S.D.) document subsequently issued, are deemed rejected. The C.S.D. document, which includes the accepted clarifications, becomes part of the tender documents and applies to all tenderers. It ensures that all participants have a uniform understanding of the project's requirements, thus impacting the tender process by setting a common baseline for all bids .
In joint ventures, the earnest money must be paid collectively as a joint venture entity rather than in individual capacity. An exemption certificate in individual capacity is not accepted, ensuring that the joint venture is fully committed as a single legal and financial entity to the tender obligations. This approach protects the interests of the party requiring the tender as it ties the entire venture financially and ensures collective responsibility and performance .