0% found this document useful (0 votes)
156 views1 page

Pavement Edge Section Detail Drawing

This document is a pavement edge section detail drawing from Qatar's Public Works Authority (ASHGHAL) road works standards. The drawing shows a typical kerbed section detail and was last revised in September 2017 to incorporate further comments. It has gone through 4 revisions since 2013 when the typical kerbed section was first added. The drawing is approved and numbered SD 6-5-102.

Uploaded by

ecstacy7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
156 views1 page

Pavement Edge Section Detail Drawing

This document is a pavement edge section detail drawing from Qatar's Public Works Authority (ASHGHAL) road works standards. The drawing shows a typical kerbed section detail and was last revised in September 2017 to incorporate further comments. It has gone through 4 revisions since 2013 when the typical kerbed section was first added. The drawing is approved and numbered SD 6-5-102.

Uploaded by

ecstacy7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.

NOTES:

1
1
1
1
1
1

1
1

1
1
1
1
1
1

1
1

04 SEP 2017 INCORPORATE FURTHER COMMENTS


03 JAN 2016 UPDATE TO QCS 2014
APPLY NEW TITLEBLOCK WITH NEW
02 OCT 2013 MG
ASHGHAL LOGO
TYPICAL KERBED SECTION DETAIL
01 AUG 2013 MG
REVISED
Rev. Date Revision Details Appd.

1
1
QCS Section:
Section 6 - Road Works
Part 5 - Asphalt Works
Drawing Title:

PAVEMENT EDGE SECTION


DETAIL

Approved: Sheet No:


1 OF 1
Date: Scale:
NTS
Drawing Number: Revision:

SD 6-5-102 4

You might also like