0% found this document useful (0 votes)
133 views1 page

A326 PDF

Uploaded by

learnafren
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views1 page

A326 PDF

Uploaded by

learnafren
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

INSPECTION REQUEST

TO: SUPERVISOR FROM: Request No.:


INSPECTION UNIT ________________
ENGINEERING
DIVISION Tel.: ____________
Request Date:
Fax.: ___________
_______________

This is to inform you that the following job is scheduled to start as detailed below.
Please provide the required inspection coverage.
Work Description: (Include Plant No., Location of work, etc.)

Start Date: ___ / ___ / ______ Completion Date: ___ / ___ / ______
Time: ________ Time:_______
Inspection Required: ________ Pre – T&I ________ Pre – T&I ________ None T&I
Mechanical Welding Electrical
Paints & Coating Cath. Protection Relief Valves
Engineering Package: (Repairs / Modifications / Maintenance Projects)
Available Under Preparation Not Required
Inspection Worksheet:
Available IWS #: Required Not Required
IU- ________
Comments:

______________________
Area Rep. Sign
For Inspection Unit Use Only
Assigned Inspector: _____________________
Inspection Supvr. Instructions: ________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________

cc: Supt. ED
Supvr. OEU _____________________
Supvr. MSU Inspection Unit Sup.
Operations Forman

EMB/Form/99
Saudi Aramco: Company General Use

You might also like