0% found this document useful (0 votes)
141 views5 pages

Statistical Quality Control: R Charts Guide

This document discusses control charts, specifically R charts, which measure variation within subgroups. It notes that an R chart would not be considered under control if more than 2-3% of subgroups fall outside the control limits. If variation is due to issues like raw material quality, machine settings, the operator, measurement procedures, or a new method, troubleshooting should be done. Even after troubleshooting, if the R chart is still not under control, elimination of subgroups can be considered to plot a new R chart.

Uploaded by

Sudhagar King
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views5 pages

Statistical Quality Control: R Charts Guide

This document discusses control charts, specifically R charts, which measure variation within subgroups. It notes that an R chart would not be considered under control if more than 2-3% of subgroups fall outside the control limits. If variation is due to issues like raw material quality, machine settings, the operator, measurement procedures, or a new method, troubleshooting should be done. Even after troubleshooting, if the R chart is still not under control, elimination of subgroups can be considered to plot a new R chart.

Uploaded by

Sudhagar King
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

15P501- STATISTICAL QUALITY CONTROL

CONTROL CHARTS

PRESENTED BY
Dr. [Link]
Assistant Professor ([Link].)
Department of Production Engineering
PSG College of Technology
Coimbatore - 641 004

24-Sep-20 1
CONTROL CHARTS
 R Chart – Variation within subgroup
 R Chart is not under control
Troubleshooting is done
Variation like

1. Raw material quality


2. M/c setting
3. Operator
4. Measurement procedure
5. New method was used

Again R chart is not under control

24-Sep-20 2
CONTROL CHARTS
 Elimination can be done up to 2 – 3% subgroups
 For some component 10% elimination can be done
 If the characteristic is not critical characteristic delete subgroup and plot new R chart with
remaining subgroups.