Data Center Space Requirements Overview

This document outlines the space requirements for a new facility that will house various teams, labs, and administrative functions. It estimates needing a total area of approximately 5525 square meters to accommodate 473 users. Key spaces include 5 office zones for project teams of 50 people each, labs for testing, coding, and monitoring, seminar and conference rooms, board rooms, administrative offices, a security center, research center, data storage facility, and parking. Ancillary spaces like cafeterias and gym are also accounted for based on user needs.

Uploaded by

kavya pushparaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
249 views12 pages

Data Center Space Requirements Overview

This document outlines the space requirements for a new facility that will house various teams, labs, and administrative functions. It estimates needing a total area of approximately 5525 square meters to accommodate 473 users. Key spaces include 5 office zones for project teams of 50 people each, labs for testing, coding, and monitoring, seminar and conference rooms, board rooms, administrative offices, a security center, research center, data storage facility, and parking. Ancillary spaces like cafeterias and gym are also accounted for based on user needs.

Uploaded by

kavya pushparaj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Sr. No.

Spaces

1
Entrance and Ground Floor
Requirements

2
Office and Working spaces for
employees
CEO X1

President X1

Vice-President X1

Director X2

Managing Director X4
4 Server Lab
5 Network Lab
6 Monitoring Lab
7 Testing Lab
8 Coding Lab

9 Research Centre

10 Facility Administration
10 Facility Administration

11 Facility Management Centre

12
Security and Surveillance
Centre

13 Seminar X3

14 Conference X5

15 Internal meeting X2

16 Board rooms X1

Other ancillary spaces that will


17 be required on day to day
working
18 Parking

19 Data Storage Facility

20
Server Room and Power
backup Room

21 Hospitality Staff

TOTAL AREA (APPROXIMATELY)


Content Area

Entry, Security Clearance (Staff, VIP and Visitors)


Reception, Waiting Area, Registration centre for
visitors along with (Administration of the same and As per Floor Area
Record room and Surveillance Centre), Inquiry
desks, Kiosk, Ancillary Service Areas, Surveillance
Room.

To be designed on the basis of departmentalisation.

Each office zone will be designed for a complete


chain of designations keeping in mind the project
hierarchy and shall be independent of each services
and need physically available in each zone.

There will be 5 office zones/teams comprising of 50


primary users each.

Each team will be allocated an


area of 300 sq. mts.
(Team of 50 will include Project Manager,
Compliance Officers, Cyber security Specialists, Data
Center Technicians, Cloud Architects, IT Engineers,
Coders, Hackers and Interns) Six such teams have to
be allocated space in design program along with
ancillary spaces they would require during the work
timings.

Leisure spaces can be a sharing facility between


different teams as per design conceptualisation.
Each independent User will have and independent
working space, they have to be provided with other
ancillary spaces that can be shared and used for
leisure activities. The hierarchy of areas will be
decided as per design of each layout provided for
the respective personnel’s.

They will have access to the whole centre and have


designated service lifts, toilets other services as
needed and individual residence spaces in the
facility. Minimum office space for each
should be 45 sq. mts. plus 5 sq.
mts. of the secretary = 50 sq. mts
minimum for each.
Their deign spaces should be zoned keeping in mind
they can have access to the seminar, conference,
team office areas, research centre, internal meeting
and board rooms, Labs and data storage centre.

Every Personnel will have a secretary with an


adjacent office space of minimum 5 sq. mts.

All labs to be provided on the same floor with easy


access to Project Managers and Upper Hierarchy. 75 sq. mts.

To be designed like office Zone for team of 10


people 150 – 200 sq. mts.

Administration office 15 people.

150 sq. mts.


150 sq. mts.
(Can be divided in zones and provided as per areas
and zoning or can be a central facility)

To be designed like Administrative block, for 5 100 sq. mts.


people.

Surveillance room and Back office 200 [Link].

To be used for visitor interaction, team growth


programs and events conducted with intra
companies discussing growth working and
management of the facility. 300 sq. mts.

To be designed for 100 people

To be used by office teams for internal meetings


and project discussions and working. 50 sq. mts.

To be designed for 50 people

To be used by upper hierarchies and Project


Managers and Researchers for Data Centre
Management, Marketing and development and 50 sq. mts.
R&D discussion.

To be designed for 25 people


To be used for internal meetings by the Upper
Hierarchies. 50 sq. mts.
To be designed for 15 people

Cafeteria, Gym, Leisure Room, Resting Spaces, As per user zoning and access to
Library, Rest Rooms, Changing Spaces, Kiosks, any the space. (refer standards for per
other if design demands. person space requirement)
Only for Upper Directives and VIP’s, Staff Transport
vehicles, Emergency Vehicles, Facility Vehicles. -

To be left as vacant rooms for stacks and racks of


data drives.
100 sq. mts.
To be Designed for 5 Teams one for each.

To be left as vacant rooms dedicated rooms. 100 sq. mts. each

Staff needed fo Security, Management, Cleaning,


Maintainence and functioning of spaces like Caferia,
Gym etc in the center. Space for them to rest, 300 sq. mts.
change, eat and work from. To be designed for 50
people.

TOTAL AREA (APPROXIMATELY)


Total Area Users

- 25

1500 250
450 18

375 10

200 10

150 15
150 15

100 5

200 10

900 10

250 10

100 5

50 5

500 25
10

500 10

200 5

50 50

5525 473

Sr. No.
Spaces
1
2
Entrance and Ground Floor 
Requirements
Office and Working spaces for 
employees
3
4
Server Lab
5
Network Lab
6
Monitoring Lab
7
Testing Lab
8
Coding Lab
9
Research Centre 
10
Facility Administration
CEO
10
Facility Administration
11
Facility Management Centre
12
13
Seminar                        X 3
14
Conference
18
Parking
19
Data Storage Facility
20
21
Hospitality Staff
TOTAL AREA (APPROXIMATELY)
Server Room and Power 
backup Room
Content
Area
As per Floor Area
Entry, Security Clearance (Staff, VIP and Visitors) 
Reception, Waiting Area, Registration cen
75 sq. mts. 
150 – 200 sq. mts. 
Administration office 15 people.
150 sq. mts.
Each independent User will have and independen
150 sq. mts.
100 sq. mts.
Surveillance room and Back office
200 sq.mts.
300 sq. mts.
To be designed for 100 people
50 sq. mts
-
100 sq. mts.
To be Designed for 5 Teams one for each.
To be left as vacant rooms dedicated rooms.
100 sq. mts. each
300 sq.
Total Area
Users
-
25
1500
250
450
18
375
10
200
10
150
15