Qatar Building Permit Process Flow
Qatar Building Permit Process Flow
DETAILED PROCESS
PERMITTING PROCESS
FOURTH & FIFTH PRECINCTS
FOURTH PRECINCT
Design Consultant (DC) / Architect of Record (AoR) Ministry of Municipality & Environment Stakeholders’ Services Approval
Stakeho
PLANNING PERMIT PRE‐
Master Plan preparation and approval by Client
lders
APPLICATION
Submission of Master Plan to MMUUP
Letter (Request for review of the development draft master plan)
Explanatory Document KM – Electricity KM – Water
Planning Approval Plumbing Drawing
Conceptual Plans
Electricity service site plan with cable route Plumbing Calculations
Sustainability features and ratings Receive and review documents
Development Phasing Plan
Substation Plans, civil details with dimensions
and finishes.
Illustrative Drawings HV (11kV) Single line diagram with HV cable
Comparison Table route.
Broad Land Use Budget MV‐Panel and SMB Schematic diagrams with
cable sizes.
Voltage drop calculations.
Electrical Load Summary for each MV panels.
Submission: kWH Meters Summary
Civil Section Approval
Letter (request for review of the development final master plan and issuance of
Planning Permit and clearance to proceed in building permit) Reviewed /
All above drawings in Planning Approval
specifically Civil Details
All required information / Documents listed for Pre‐Application and corrected Approved? Planning & Protection Approval
Drawings approved by Civil Section
PLANNING PERMIT APPLICATION
based on UPD review report.
A0 Plan (3 copies) Installation Engineer Approval
All drawings approved by Planning &
N Y Protection Section
PEO
Compilation of the required documents “Package for Opening File”: Hard copies of external elevations of the
Copy of Ownership Document and Property Document (PD), certified by the buildings excluding sections & details ASHGHAL – Drainage ASHGHAL – Roads
Stamped drawings by PEO
real estate registration (VL 6 months).
Copy of owner's ID or authorized person. Another hard copy of the same contents an Item
Drainage Drawing Site drawings with road layout
Hydraulic Calculation TIS
Establishment ID and commercial permit of the organization. 1 but on A3 or A4 size.
Electronic copy of the full architectural drawings Services Site Plan
Housing department letter.
Stability Certificate (for additional floor/s). in PDF format and AutoCAD
Allocation letter (for government projects). Electronic copy of the plot document, plot
number and plot ownership.
Stability Certificate (for additional floor/s).
No objection Letter from third parties such as the PEO, Supreme Council of
Hard copy of the perspectives and colored Planning Permit
presentation elevations QCDD ‐ Firefighting QCDD – Fire alarm
Health, AWQAF, etc. (please refer to the list beside this box)
Hard and Electronic copy of the photos of the Detail Design Report (where (through QCD System)
Copy of inquiry of planning and architectural regulations. existing buildings applicable) Detail Design Report (where
Structural plans (for Rail). A statement on the present status of the project Fire Fighting system drawings (floor applicable)
Street level site plan (from Ashghal). A statement for the reasoning plans, elevations, sections) Fire Alarm system drawings (floor
Consultant’s authorization by owner. Hard copy of any supporting document or Schematic Diagrams plans, elevations, sections)
Consultant Engineer Office Obligation. drawing you wish to add. Fire Pump Rooms/Fire Water Storage Schematic Diagrams with input‐
Policy plan. The elevations of all type of mosques, (blow up plans required) output matrix
Other Attachments. coordinated with the mosque sections in the Calculation Reports (hydraulic, Fire Command Center/Fire Pump
Ministry of Islamic Affair
manual, water) Rooms/Generator Rooms (if
DC1, STAGE 1 OPENING FILE
ly
QCD Guidelines provided)
Calculation Reports (battery load,
audible/visible,lux)
Submission of the required documents: Reviewed / QCD Guidelines
Compiled “Package for Opening File” ‐ see above list. Internet
Resubmission as requested by MMUP
Submission of the required documents:
N – (Additional information required)
Y
on
Approved?
QCDD – ACMV (through QCD System)
Detail Design Report (where
applicable)
ACMV system drawings (floor plans,
elevations, sections)
Approved Planning Permit (Master Plan) Reviewed /
e
Site Plan and Location Map Internet Schematic & Control Diagrams
Approved?
Architectural drawings( Floor Plans, Elevations, Sections) & schedule of Pump Room/Generator Room
Accommodation/Area Statement Ventilation System (as required)
Calculation Reports (smoke exhaust
nc
N
system, staircase & fire lift shaft
Y
pressurization system, CFD Analysis )
Stair & Lobby Pressurization (if
Submission of the required documents provided)
Kahramaa Building Permit Application (Electrical) QCD Guidelines
Bulk Application
re
Single Line Diagram
Substation Layout MOI Security
DC1, STAGE 2
Official letter in Arabic director to
fe
SSD ‐ MoI.
Copy of commercial registration with
activity approved by SSD.
Submission of the required documents Authorization letter in Arabic from
Qatar Civil Defense (QCD) the owner to the approved
Narrative/Fires safety report KM ‐ Electrical
re
Cameras storage calculation details +
Load calculation.
Fo
DC1 Approval Control room design layout with all
TEMPORARY BUILDING
security system equipment’s.
Detailed schematic diagram drawing
Design beyond the end of Schematic Design till Final Building Permit by D&B Contractor of system.
PERMIT (BP)
Technical specification of cameras
and security system devices.
Copy of maintenance contract or
Submission periodical services level agreement
Temporary Building Permit request Reviewed &
OOREDOO (SLA) (if available).
DC1 Approval Approved? Site Plan Project time line plan details showing
*SC’s support will be
Required undertaking letters / forms required Ooredoo/telecom schematic the start & end dates.
Ooredoo incomer details, Ooredoo
N room details
Y
Digital details of Ooredoo incomer
SERVICES’ APPROVAL
MOE
Temporary BP Obtained
STAKEHOLDERS
Approved EIA
Submission
All required stakeholder design documents. Stake‐
DC1 Approval form
MOT
Approved DC1 Site Plan
holders Approved TIS
Other forms / documents
Services Approved
QCAA
QKLEEN Building Plans
DC2 STAGE
Site Plan shows garbage disposal Elevations showing maximum height
Submission location Policy Plan
Updated Architectural documents
Original approved services documents / drawings Reviewed &
Y DC2 Approved
Structural design Approved?
3D modelling (as needed) QRAIL
Other documents Architectural, Location plan,
N Structural plans, Sections and
WOQOD Elevations with QND (95) levels
Y
BUILDING PERMIT
Brief Description of the Gas/liquid noted on all drawing including the
fuel System required. loading design and foundation details
Building Permit Submission Construction Layout (DWG)
MMUP DC1 and DC2 Approval Notice Proposed location of Fuel System
(BP)
All Approved Drawings & Documents incorporated in the layout
MMUP Form – Building Permit Request (with required fees if needed) Reviewed & Detail drawings of the Fuel System
MMUP Form – Consultant Engineering Office Obligation Approved?
Y Building Permit Obtained Detail data of all Fuel System
MMUP Form – Contracting Company Obligation Equipment
MMUP Form – Contracting Company Authorization
MMUP Form – Owner Obligation
MMUP Form – Engineering Consulting Office Authorization
N
LEGEND:
Design Consultant (DC) /
Client Architect of Record (AoR)
MMUP STAKEHOLDER INTERNET / ONLINE Approval
GE