You are on page 1of 2
GF DGN-OF 3 (rile SG Ter fet: 7 aoa OF BANGLADESH LTD. &... samt s (An Enterprise of Bangladesh Power Development Bosrd) Hub TITLE: DOCUMENT/ DRAWING APPROVAL) COMMENT: TRANSMITAL SONTRACT REFERENCE: PGCBRRAGS Phase-0472020; Date 20-00-2920 DOCUMENT SUBMITTAL REF: i) EELPGCEIRRAGS Phase 42021246 Date: 08.09.2021 ') EELIPGCBIRRAGS Phase-4/2021/245, Date: 08.08 2021 ULTANTS' COMMENT REF; NA SUBJECT: Comments Approval on tarf metering panel GA and ‘Schematic drawing for Bhola 230/33kV grid ‘Substation and Bhaluka 132/33kV grid substation, To Cony, Project Director RRAGS Phase ~04, PGCE Project, C-1/5 ARtabnagar, Bada Dhaka- 1212 Afiabnagar, Badda-1212 ka. Executive Drecor 8 0), 6CB Chief Enaineer & D1, Pace ieee re Dhal ‘Superintending | Engineer (SPMC), PGCB see Dears, Issued by: ee posts ene elon cer re poss det el Mater ‘nae ofa maton oer tan hes sida crt ot san al bo {attaed cea inte OrevingDocument whut stan hated and eos ae, {Syed Abadllah Halder AK) eet pine Engroe (Substation Design & Quality Controp, ‘®ApprovaliCommantsinformaton conveyed herein neither relieves the contractor of his PGCB Ltd, Dhaka on utc tga ni esnabits corres ote re Soruefens, weit quakes, design des, assonte ts, perfomance pare Sraceaemly of te speies wi th Stiny Lave of Bangacesh we mayoo ‘eppesle nor does tithe Employes right unde the contract” BaeBe 2721.0000.4104900121.1485 ate oerozaat "Ger | Peso of imine!” Dscamont amber” —Dranig Naber] Re Sites Encosed io | Documents | ‘Approved ith | | Comment anc Yes [V Tas metering panel GA nd | Corrction(acy Scivemate craving for hola Na aeevrcce. | wa | | 220733 rd suttaton oxy RRAGS-4132-MP Comments (2) | Bhaluta 192;83KV grid a oe substation i EEL-Poce. Request rns. RRAGSABIT- ‘Submission (| Bae es Annesureot \ | 7 7 Posse acnowledge rept of documents: a y [ba] Note: (qihe above paragraph shel bs ade ithe satus othe documents ACIOIRRIL ‘athe above paregrech shal be aed if the status of he documents Ar Ac i « Badda, Ohalat2i2 ban, Avenue, Jahurl lam ity, obnogar Bad vie: wpe gob PAX: 185-01 S573 35 Fars] SaTaa Sa paet gad QFDGNO Annexure-O1 Ref. no.- 27.21.0000.410.49.001.21,1456; Date: 06-10-2021 SN. | Submittal Ref. Description Vendor Doc. | Rev. | Status TELPOOBIRRAGS | Teil metering panel GA and | DFFL-POCB- = fi Phase-4/2021/245, | schematic drawing for Bhaluke | RRAGS4-132-MP 00 Approve Date: 08.09.2021 132/33kV grid substation _ with comments EELIPGCB/RRAGS | Tariff metering panel GA and ‘EEL-PGCB-RRAGS- 2. | Pnase-0202'/246, | schematic drawing for Bhola | -BHL-I32-MP 0 | Request for Date:08.00.2021 | | 230/33kV grid substation Resubmission Comments of Tariff metering panel GA and schematie drawing fo Bhaluka 132/33KV grid substation: 1) Manufacturer of backup energy meter shall be CEWE, UK 2s per the Schedule-D, page no. 1368, volume 2 of 3 of the contract document. 2) Manufacturer of different types of MCB shall be ABB, Europe as per the Schedule-D, page no, 1336 volume 2 of 3 the contract document. ‘Comments on Tariff metering panel GA and schematic drawing for Bhola 230/33kV grit substation: 1) Three line diagram of CT and PT connection from the respective bay to the metering panel showing secondary terminal box of the CT and PT, proper core marking, test block, MCB, MK box ete. shall be submitted for approval. 2) Manufacturer of backup energy meter shall be CEWE, UK as per the Schedule-D, page no, 1368, volume 2 of 3 of the contract document. 3) Manufacturer of different types of MCB shall be ABB, Europe as per the Schedule-D, page no. 1336 volume 2 of 3 the contract document. (Refat Bin Sayed) Exgcutive Engineer (SS0-2) suite stn & hy Conta Substalion Design & AC Sa CI Ea PGCE Lid,

You might also like