You are on page 1of 1

ROOF DECK LINE ROOF DECK LINE

CEILING LINE CEILING LINE


THIRD FLOOR HALLWAY TECHNICAL
ROOM
ENTERTAINMENT
ENTERTAINMENT ROOM
ROOM
DOWN
BILLIARD'S TABLE

3RD FINISHED FLOOR LINE 3RD FINISHED FLOOR LINE


CEILING LINE CEILING LINE
TOILET MASTER'S MASTER'S TOILET AND HALLWAY BAR
STAIR RAILINGS
AND BEDROOM BEDROOM BATH
BATH

plant
2ND FINISHED FLOOR LINE 2ND FINISHED FLOOR LINE
CEILING LINE CEILING LINE
TOILET AND TOILET AND KITCHEN GUEST'SROOM
STAIR RAILINGS BATH BATH

DINING
ROOM

1ST FINISHED FLOOR LINE 1ST FINISHED FLOOR LINE


NATURAL GROUND LINE NATURAL GROUND LINE

2500 3000 3000


3500
6000 8500
A B C D 4 3 2 1

A TRANSVERSE SECTION A LONGITUDINAL SECTION


6 SCALE 1:100 6 SCALE 1:100
1 2

ENGR. JOHN KEVIN P. GARIDAN PROJECT TITLE OWNER: SHEET CONTENTS SHEET NO.
PROPOSED THREE STOREY RESIDENTIAL BUILDING MR. & MRS. GARIDAN TRANSVERSE SECTION
CORPORATION PRC NO.: VALIDITY:
LOCATION: ADDRESS:
IAPOA NO.: O.R. NO.:
piko_lino69@ymail.com LONGITUDINAL SECTION
PTR NO.: DATE: CAMP 7, BAGUIO CITY SUMULONG STREET. HOLYGHOST PROPER, BAGUIO CITY
09061614996 PLACE: TIN:

You might also like