ROOF DECK LINE ROOF DECK LINE
CEILING LINE CEILING LINE
THIRD FLOOR HALLWAY TECHNICAL
ROOM
ENTERTAINMENT
ENTERTAINMENT ROOM
ROOM
DOWN
BILLIARD'S TABLE
3RD FINISHED FLOOR LINE 3RD FINISHED FLOOR LINE
CEILING LINE CEILING LINE
TOILET MASTER'S MASTER'S TOILET AND HALLWAY BAR
STAIR RAILINGS
AND BEDROOM BEDROOM BATH
BATH
plant
2ND FINISHED FLOOR LINE 2ND FINISHED FLOOR LINE
CEILING LINE CEILING LINE
TOILET AND TOILET AND KITCHEN GUEST'SROOM
STAIR RAILINGS BATH BATH
DINING
ROOM
1ST FINISHED FLOOR LINE 1ST FINISHED FLOOR LINE
NATURAL GROUND LINE NATURAL GROUND LINE
2500 3000 3000
3500
6000 8500
A B C D 4 3 2 1
A TRANSVERSE SECTION A LONGITUDINAL SECTION
6 SCALE 1:100 6 SCALE 1:100
1 2
ENGR. JOHN KEVIN P. GARIDAN PROJECT TITLE OWNER: SHEET CONTENTS SHEET NO.
PROPOSED THREE STOREY RESIDENTIAL BUILDING MR. & MRS. GARIDAN TRANSVERSE SECTION
CORPORATION PRC NO.: VALIDITY:
LOCATION: ADDRESS:
IAPOA NO.: O.R. NO.:
piko_lino69@ymail.com LONGITUDINAL SECTION
PTR NO.: DATE: CAMP 7, BAGUIO CITY SUMULONG STREET. HOLYGHOST PROPER, BAGUIO CITY
09061614996 PLACE: TIN: