0% found this document useful (0 votes)
212 views4 pages

Drawing Schedule for Blocks & Villas

The document provides a drawing schedule for blocks & villas, clubhouse, and external services projects with target dates for completion. It lists over 100 individual drawings across various disciplines like architecture, structure, electrical, plumbing, landscape, and services. The majority of drawings have target completion dates between October 2022 to May 2023, with some extending into November 2023 for more specialized drawings like swimming pool details.

Uploaded by

Siddhartha Dubey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
212 views4 pages

Drawing Schedule for Blocks & Villas

The document provides a drawing schedule for blocks & villas, clubhouse, and external services projects with target dates for completion. It lists over 100 individual drawings across various disciplines like architecture, structure, electrical, plumbing, landscape, and services. The majority of drawings have target completion dates between October 2022 to May 2023, with some extending into November 2023 for more specialized drawings like swimming pool details.

Uploaded by

Siddhartha Dubey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Drawing Schedule- Blocks & Villas

Target Dates
Sl. No. Particulars
B-1
A Architectural Drawings
1 Architectural Complete Set (Plans, elevations & sections) Received
2 Toilet Details (Wall elevations, Plumbing & Fixtures details) 01/Oct/22
3 Balcony Railing 01/Nov/22
4 Stair railing 01/Nov/22
5 Flooring Pattern (Inside Flats) 01/Dec/22
6 Flooring pattern (Common Area & Lift Facia) 01/Dec/22
7 Flooring Pattern (Stilt Floor) 01/May/23
8 Wardrobes & Kitchen Cabinet Details 01/Jun/23
9 External Painting Color Scheme 01/Oct/23
10 Internal Signage Details 01/Oct/23
11 Concierge Details 01/Oct/23

B Structural Drawings
1 Foundation Plan and Details Received
2 Column Layout Received
3 Column Schedule Received
4 Plinth Beam Plan & Details Received
5 1st Floor framing Plan, Beam & Slab Details Received
6 2nd to 9th Floor framing Plan, Beam & Slab Details 01/Sep/22
7 10th to 12th Floor framing Plan, Beam & Slab Details 01/Oct/22
8 Terrace Floor framing Plan, Beam & Slab Details 01/Nov/22
9 Machine Room & Over Head Tank 01/Dec/22
10 Service Platform Detail 01/Feb/23

C Electrical Drawing
1 Electrical Plan Stilt floor Received
2 Electrical Plan Typical floor 01/Sep/22

D Plumbing Drawings
1 Sleeve detail 01/Sep/22
2 Plumbing Plan stilt floor 01/Oct/22
3 Plumbing Plan Typical floor 01/Oct/22
4 Terrace Floor Drainage Plan 01/Dec/22
5 OHT sleeve detail 01/Jan/23
6 Schematic Line Diagram (Downcomers/Uprisers) 01/Feb/23
7 Terrace Ring line 01/Feb/23
Date: 24/Aug/22
Target Dates
B-2 Villas

Received Received
01/Oct/22 01/Sep/22
01/Nov/22 Received
01/Nov/22 Received
01/Dec/22 01/Oct/22
01/Dec/22 NA
01/May/23 NA
01/Jun/23 Received
01/Oct/23 Received
01/Oct/23 NA
01/Oct/23 NA

Received Received
Received Received
Received Received
Received Received
Received Received
15/Sep/22 Received
15/Oct/22 NA
15/Nov/22 NA
01/Dec/22 NA
01/Feb/23 NA

Received Received
01/Sep/22 Received

01/Sep/22 Received
01/Oct/22 NA
01/Oct/22 Received
01/Dec/22 Received
01/Jan/23 NA
01/Feb/23 NA
01/Feb/23 NA
Drawing Schedule- Club House 24/Aug/22
Sl. No. Particulars Target Dates

A Architectural Drawings
1 Architectural Complete Set (Plans, elevations & sections) 01/Oct/22
2 Railings Details 01/Dec/22
3 Flooring Pattern 01/May/23
4 Specifications 01/May/23
5 HVAC Detail 01/Jun/23
6 Interior Drawings (Complete Set) 01/Jun/23
7 External Painting Color Scheme 01/Jul/23
8 Furniture Details 01/Oct/23
9 Gym & Games Equipment Details 01/Dec/23
10 Signage Details 01/Dec/23

B Structural Drawings
1 Foundation Plan and Details 01/Oct/22
2 Column Layout 01/Oct/22
3 Column Schedule 01/Oct/22
4 Plinth Beam Plan & Details 01/Oct/22
5 1st Floor framing Plan, Beam & Slab Details 01/Nov/22
6 Terrace Floor framing Plan, Beam & Slab Details 01/Dec/22
7 Machine Room & Over Head Tank 01/Jan/23

C Electrical Drawing
1 Electrical Plan Ground floor 01/Nov/22
2 Electrical Plan 1st floor 01/Nov/22
3 Electrical Plan Terrace floor 01/Dec/22

D Plumbing Drawings
1 Sleeve detail 01/Nov/22
2 Plumbing Plan Ground floor 01/Dec/22
3 Plumbing Plan 1st floor 01/Dec/22
4 Terrace Floor Drainage Plan 01/Jan/23
5 OHT sleeve detail 01/Jan/23
6 Schematic Line Diagram (Downcomers/Uprisers) 01/Feb/23
7 Terrace Ring line 01/Feb/23
Drawing Schedule- External Services 24/Aug/22
Sl. No. Particulars Target Dates

Landscape Drawings
1 Main Gate Received
2 Water Body Received
3 Landscape Setting out Plan 01/Jan/23
4 Lanscape Road, Pathway & Kerb setting out 01/Feb/23
5 Landscape Detail for Parks, Grading & Sections 01/Feb/23
6 Landscape Detail for Feature elements 01/Mar/23
7 Outdoor sports Activities 01/Apr/23
8 Amphitheatre Details 01/May/23
9 Swimming Pool Architecture Detail 01/Nov/23
10 Plantation Plan 01/Nov/23

Services
1 STP 01/May/23
2 UG Tank 01/Jul/23
3 Electrical Sub station 01/Jul/23
4 Sewage Disposal Plan 01/Jul/23
5 Storm water drainage with RWH Pits 01/Aug/23

Structure Drawings
1 Swimming Pool 01/Nov/23
2 Amphitheatre 01/May/23
3 STP 01/May/23
4 UG Tank 01/Jul/23
5 Electrical Substation 01/Jul/23