SAF-O1 General Requirements for Safety and Fire Protection Directives
8. Fire Protection Workflow
Facility Operator (FO) selects HCIS approved FP Consultant
I
FP Consultant develops front end engineering package for FP systems
I
FO reviews, approves and submits to HCIS
‘Comments
HOS reviews
Necomments
FO selects HOSS approved FP Contractor
i
FP Contractor develops installation package
I
FP Consultant/ FO reviews, approves and submits to HCIS|
Crimes
HOS reviews
Neeomments
FP Contractor supplies installs and tests systems
t
FP Contractor, FP Consultant, & FO commission the systems
t
FP Contractor trains FO’s personnal
Se
FO operates systems, maintains documentation
|
FP Contractor & FO inspect, test and maintain systems
Page 70f8
12 Security Projects
12.1 Security Project Service Providers
Only HCIS approved security consultants and contractors shall work on the security
infrastructure, security system design, and implementation of SEC compliant
requirements for facilities. Refer to section 5.2, SEC-14 for further details.Kingdom of Saudi Arabia
Ministry of interior as
High Commission for Industrial Security SS)
Secretariat General
SEC-01 General Requirements for Security Directives
12.2 HCIS Approval Stages
Security Projects shall follow a 4 stage HCIS approval process as shown in the
diagram below. The details for each stage are stipulated in SEC-14.
ENGINEERING & DESIGN
I ) I
stage 1 > Stage 2 p+ Stage
FISK ASSESSMENT PRELIMINARY DESIGN DETAIL DESIGN
READINESS REVIEW