0 ratings0% found this document useful (0 votes) 103 views9 pagesCIPC Circular
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
—
Board Circular No. A30/2012
Ref : SUPYCIPC/2012 *
12.09.2012
Addl. GMM
DGMM.
Board Secretary
AGMM
Managers / Chief Engineers
Chief Accountants
OICC’S / Heads of Sections
CIPC REQUEST FOR AIR CONDITIONER, PHOTOCOPIER AND IT EQUIPMENT
1. Requests for CIPC approval for the replacement of old Air Conditioners shall be
accompanied with a condemnation report from a committee comprising of the
DGM J AGM, Manager and Mechanical Engineer / Electrical Engineer OR a letter of
condemnation from Local Agent. On receipt of the new Air Conditioner, the old Air
Conditioner should be disposed as scrap.
Requests for CIPC approval for the replacement of photo copiers will be granted only on
trade —in basis.
If the CIPC approval is requested on replacement basis for IT Equipment, (as per the
CIPC approval policy for IT Equipment) the old item should be returned to the IT Division
immediately on receipt of the new equipment. If the old item is not returned to the IT
Division, any further requests from the relevant office for replacements will not be
granted
Please bring this to the notice of the relevant officials for compliance.
i
General Manageraipc - 2012
22.02.2012
Addi, GMM
DGMM.
APPROVAL FOR PURCHASING OF CAPITAL ITEMS.
At the CIPC Meeting held on 18" January 2012, it was decided that CIPC approval is not
required for the following items :
© Calculators less than Rs. 3,000/=
© All Tools & Equipment [for Electrical & Mechanical and 1)»
including Engineers Clippers, Asphalt Cutters, Pipe Cutters, oO
Tampers, Smalll Generators <25kva, Dewatering Pumps, de e fig ary
Pressure Pumps, Aluminium Ladders vst
© All Tools & Equipment for Service connections (Tapping M/C, (ait © we
Shoring plates, Pipe Cutters, Compactors} o We
© Laboratory Equipment below (each) Rs. 100,000/=
© Alisurvey equipments including GPS, Altimeters etc of below
Rs, 100,000/=
© Health and all safety equipment including Road safety
(Gum Boots, Helmets, Hanging
Belts, Eye washes, Masks, Chlorine Gas safety equipment,
Road safety Equipments, Blinking amps, Goggles, Chain blocks,
Batteries for touches & UPS.
Please forward your comments to reach AGM (Supplies) on or before 14" March 2012 to issue a
circular,
a
me 6)
one Ow
be seth oe
General Manager “ ey res 2 “wa*
; ae et
a v{- S& ve z
fof ee 1
Board circular No. At8/2042 ! ne (oy ee
mn See
Ref : SUIP/CIPC/2012 a J > p. a ot
21.05.2012
Addl. GMM
DGMM
Board Secretary
AGMM
Managers / Chief Engineers
Chief Accountants
OIC / Heads of Sections
APPROVAL FOR PURCHASING OF CAPITAL ITEMS
At the CIPC Meeting held on 18" January 2012, it was decided that requirement of obtaining prior
CIPC approval be further relaxed on the purchase of the following items :
°
°
Heavy duty Stapler Machines, Heavy duty Punchers of value less than Rs. 3,000/=
Calculators of value tess than Rs. 3,000/=
Pen Drives (Flash Drives} of value tess than Rs. 3,000/=
All Tools and following Equipment such as Engineers Clippers, Asphalt Cutters, Pipe
Cutters, Tampers, Small Generators <25kVA, Dewatering Pumps,
Pressure Pumps, Aluminium Ladders and Welding equipment
IT Tools {Hardware}
= Computer Serviceman’s Toolkits / Networking Toolkits
Cable / Voltage / Signa! / Continuity Testers
* Multimeters (Digital / Analog)
Troubleshooting Tools (Eg. Cable Testers, Power Supply Testers, Memory
Testers, Motherboard Slot Testers, Temperature Testers, etc.)
Network Testers (Eg, Network Cable Testers / Analyzers, PING Testers,
POE Testers, Tone & Probe Testers, Loopback Jacks, Crossover Adapters, etc.
Individual Hand Tools (such as Screw Drivers, Cable Cutters, Testers, Punch
Down Tools, Crimping Tools, etc.)
IT Toots (Software|
* Virus Guard Software (Value not more than Rs, 5,000.00 per user]
Alll Tools & the following Equipment for Service connections (Tapping M/C,
Shoring plates, Pipe Cutters, Compactors and Brush cutters, Gardening tools,
Ladders, Scaffolding, High Pressure Washers)
Laboratory Equipment of value below (each) Rs. 100,000/=
All survey equipment including GPS, Altimeters etc of value below Rs. 100,006/=
Health and safety equipment including Road safety equipment
(Gum Boots, Helmets, Hanging Belts, Eye washes, Masks, Chlorine Gas safety
equipment, Road safety Equipment, Blinking Lamps, Goggles, Chain blocks,
Batteries for torches & UPS}
The Circular No. GM/OP/02 dated 28.09.2009 & Addl. GM/CS/11 dated 20.04.2010 issued on CiPC
Purchases will remain in force. {attached}GMs Ole
Tel: 011 2635990, Tel/ Pax: 011 2636449"
Email: gmnwsdb@sltnet lk or gm@waterboard.tk
GM/OP/02 4 28" September 2009
Addl. General Managers
Deputy General Managers =
APPROVAL FOR PURCHASING
‘APITAL ITEMS,
‘This is further to the circular no. CIPCI2001/02 dated 12.03.2009 on the above subject.
(Copy is enclosed).
1n accordance with the decision taken gt the Operational Matters Meeting held on 14.09.2009
you are informed that the requirement of CIPC approval has been exempted om purcuse of "YX
the following items for those who are entitled for such facility.
Items Period Limit
Brief Case/ Circuit Leather Bag | Every 05 years For Gr.2-3 : Rs 2,500/-
For Grd Rs 2,000/-
For Gr.5-8 : Rs.1,500/-
Umbrella Bvery 03 years To be decided by thep .”
DGM :
Toreh | Bvery 02 years 7 Lae?
Rain Coats Bvery 02 years ~do-
“Mosquito Neis Bvery 03 years =do-
Clip Files for Meter Readers Every 02 years fdo-
ia
General Mansger> s e
eee Addie ay
. 20/04/2010,
Additional General Managers,
Oeputy General Managers,
Assistant General Managers, C Sup Plies )
Managers, =
¢
Chief Engineers, ‘ a
All Sectional Heads,
¢
EXEMPTION OF CIPC APPROVAL FOR SPARE PARTS OF COMPUTERS AND PERIPHERAL DEVICES
The procurement ofthe folowing tems reuied fr theres of Computes, Computer Pergheral
Devices (Printers, UPS, Plotters, Scanners ett} are-exempted from the nedd for CIPC epproval
Replacement parts for a repair ofan existing Cémputer or Peripheral Devie (Hard bist,
Memories, Internal Pavier Supply Unis, Expansion Cards, Floppy Orives, CO/OVD drives,
Circuit Boards, ICs, Electconic Componeits etc) :
2. Replacement Units for Primary Input/auiput devices such as Monitors, Mouse, Keyboards.” a
exe.
3. Rentacements for Existing Networking Components [Active ahd Passive components such as
Network Switches, Routers, Patch Panels etc.)
Acomenitiee comprising with the celevant OGM, Manager, Computer Engineer or Manager (it)
should approve the replacement.
a
K.LU Premanath
General Managertional Water Suppl
Ratmatana.
©Y/04/2012
Additional General Managers,
Deputy General Managers,
stant General M a
Managers, oe :
Chief Engineers,
Secretary,
Sectional Heads,
POLICY FOR APPROVAL OF CIPC REQUESTS FOR PURCHASING OF IT EQUIPMENT - EFFECT FROM
02° OF APRIL 2012
The policy for the approval of CIPC requests for IT Equipment is attached herewith along with a new
format for CIPC Request form for IT Equipment. In future, the CIPC approval cequests for IT
Equipment will be evaluated against this policy document
Please circulate among all the officers under your charge
ee
KL Premanath
Genéral Manager d
Ce:
1. Chairman
2. Vice Chairman
3. Working DirectorPolicy for granting CIPC Approval tor Computers and Periphorais
Notes:
Tbe aeaale ir hs ect Fam he relevan budgets
Fs No Hrcuate Request: deploy of thei alton shal be aeesesand cere
by the IT Division,
3 Mardware Engineersfystem Adminatrators shall mactananloventery off Assetsin an onine
database.
4 The PCs arated (onda offcors hal be located conveniently to ene other utes touted
whennot nse by the offcer. Therefore, keping PCs.on officers ible ite isnot recommended
—— rd shattbe-kept ona separate Computer tatse Se TMS OI SETS AO EAT TST WHET TING —
5 New PC form (given in Annexure shal be use for forwarding te C1PC approval requea fort
Fauipment. The request shal include the recommencation specified under special
recommendations column as show below, where applicable
No. Equipment Reasonfor —_ConditioniCriteria Special Remarks
Type Request _ Recommendations
Dt | Server Replacement | Agess years By acommituee
} Age >3 years & Major" comprising with DGM,
i defect beyane ‘Manager (77), Haroware
economical repairs Engineer
New For new Manager
Requirement office, max. of ?sesvers
{One for Billing, one for
TT Solution)
i "For RSC office, max. of
Server ((T Solution)
7 For Division 7
Personal Replacement | Age >5 years By a committee
Computers Age23years& Major comprising with OGM,
defect beyond ‘Manager (11), Hardware
econornical cepairs Engineer
New Oivisions/Regional
Requicement Offices (As per the
Allocation Policy Given
inArmexute |)
| Loser Printers Replacement " Age 5 years 8yacommitige
for Office Age>3 years & Major | comprising with DG,
Use (Ag Size) ~ “detect beyond Manager (iT), Herdware
i gnomical repairs | Engineer 7
New One Printer for Max. of Recommendation from” Divide No.of
Raquleemen 6 PCs(with networking) OGM, Manager iT)and PCsof tie
Hardware Engiveer Office by
No. of
Priers.
Page 10f6No. Equipment __easonfer __Condition/Crlterla —_ Speciat —____—_Raraeley
Type | Request Recommendations :
4" DoeMatrx g Replacement Age>syears 5 "Bye cormitter 2 : ete
—erincerstor <== ae 3 years earapgieing wath
Office Use Majer detect nage (1),
beyond econorma’ Matchvare Engineer
repairs
Neer One Printerfor Recommendation" Divide No.of PCsof
Requirement ax of 6 PEs with fom GN, Manager the Office by No. of
networking) (Tang Haedware —Princers,
. Ingincer
col Rep jase eae ass
Printers ‘comprising with
Age >3 years & © DEM, Manager (iT), _
Se Major éefect| Hardware Cngineer —
beyond econarmcal
cepaes
New (Gae wekyet Cotur Hardware
Requirement ngineer/Manager
(ot) shall very the
requirement.
6 Computers Replacement
aed
SlipfReceipt
Printers for
Castuer
Points Kew
Requiterent foreach Castner
7. ‘Computers Replacement Age> $ years By acommetee
for Age ssyears& compris
Commerciat Major detect Dont, Manager (17),
Bling Data beyond economical Hardware Engines?
Entry repairs
Rew Ore PC for goce
Reguiremen: connections
8, | Line Printers Replacement Age > $ years 8) acommitee
J for Age>3yeats& comprising with
Commercial Majer detect Dam, Manages (IT),
Bi Printing beyond eccnamical Hardware Engineer
4 repairs
New (One Prater for
Requirement each Manager
Office
Page 2of 62, LomputersiPrinters
for Stores
Conditlonjcriteria
Age syyens
Age 3300's &
sraer defect
Speciat
Recommendations
By commniteee —
compriging with
Dem, Martiger (IM),
Remarks
eae beyond © Hardwrare Engine
: Kew
Requirernemt Maten Peeter for
eat Sate
10. Uninterrupted Power Replacement Ages ‘8y2 commute
Supply Units Ager? years comprising with
Major defect GM, Manager (17),
= — — a —— aa
a z Repeits
New One Recommendation — Manager
Recurenert 6sojysaliacovA from DGM, (Mitiardware
uPs(trebule Manager (11), Engineer shall
UPSpowerisnot Hardware Engineer verify the
available) for each requirenvent
%
Bulk Supplies
(calculated on the
basis that 1000VA
capacity for? PCs)
M1. Anyotherit Replacement Age> 5 years By a committee
Equipment eg, Age >3years& comprising with
Plotters, Special Major defect bom, Manager (17,
Purpose Printers, beyond Hardware Engineor
Scanners, Fax
Machines, Mult
function Printers,
etc
New
Reguirernent
‘economical repairs
fer nomal office
Recommendation
from 0Ga,
Manager (1"),
Hardware Engineer
Manager
(iTyHtaraware
Engincer shalt
verty the
requirement
Page sof 6