ENERGIVO CONTROL SYSTEMS
Check list - Wiring
ECS w/o no : 180
Customer : GE T&D
Job. Ref : TURKMEN RING 5TH LOT
Panel Ref :
Panel si.no :
Date : 6/29/2023
Sl.no. Description Yes No
1 Wire size & colour as per panel construction note
2 In.bunching of wires at micom relay
3 Termination tightness check
4 Ferrule Readability of wires
5 Proper Bunching of wires at all relays & components (Aesthetic)
6 BBX wire bunching at both ends
7 Ensure the BBX wire bunching with identification tag provided
8 Wire pull test
9 Ensure the BCU Card Negative link check (if BCU applicable )
10 Ensure the CT & MICOM link check as per schedule
Verify the shielded cable crimping & connection (if shielded cable
11
applicable )
12 RED Tube ferrule using TRIP Circuit
13 Spiral/Nylon mesh used for swing wiring & Ac wiring
14 Ensure wires are not routed in Customer Cable trough
15 CAD checking
16 CAD report completion
Formate No: ECS/QC/W/2020
rev 1 Checked :
ENERGIVO CONTROL SYSTEMS
Check list - Wiring Harness
PO NO Panel Ref :
INVOICE NO Inspected Date :
GRN NUMBER Inspected qty :
SUPPLIER NAME Accepted qty
Job. Ref Rejected qty
Sl.no. Description Yes No
1 Wire size & colour as per panel construction note & wiring schedule
2 wire cutting as per schedule
Striping Length (Ring & fork &flat-6mm ,Tubler lugs-10 +_5 mm )
3
4 Ferrule inserting as per approved drawing
5 Lug crimping as per schedule mentioned .
6 Readability of Ferrules as per drawing
7 wire bunching
Inspected sample wire bunch si.no reference
Pul test Standard
Sl.No Sq.mm kg
1 1.5 13.6
2 2.5 22
3 4 31.75
4 6 36
Striping length standard
Sl.No LUG TYPE STRIPING LENGTH
1 RING 6MM
2 FORK 6MM
3 FLAT 6MM
4 TUBLER 10 +_5MM
IEC-60352-2
Formate No: ECS/QMF/QA/WH
REV NO 1 Checked :