Opname Defect List Pelabuhan Laut

This document is a defect list report from an inspection of a port construction project. It was signed by the contractor's site manager and the supervising consultant's team leader. They inspected the completed work and found it to be 100% physically complete according to the contract documents. However, some defects were identified and the contractor agreed to make repairs. The report documents the inspection process and findings to serve as a basis for initial work inspection and use as required.

Uploaded by

Seven 7K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views2 pages

Opname Defect List Pelabuhan Laut

This document is a defect list report from an inspection of a port construction project. It was signed by the contractor's site manager and the supervising consultant's team leader. They inspected the completed work and found it to be 100% physically complete according to the contract documents. However, some defects were identified and the contractor agreed to make repairs. The report documents the inspection process and findings to serve as a basis for initial work inspection and use as required.

Uploaded by

Seven 7K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

KOP KONTRAKTOR

BERITA ACARA OPNAME DEFECT LIST


Nomor : …………………………./20………
Tanggal, ………………. 20…..

Pada hari ini ………., tanggal ………………. bulan ………….. tahun Dua Ribu ………….. (….-…..-
20……), kami yang bertandatangan dibawah:
1. Nama : [nama lengkap dan gelar]
Jabatan : Team Leader Konsultan Pengawas
2. Nama : [nama lengkap dan gelar]
Jabatan : Site Manager Kontraktor

Berdasarkan :
1. Kontrak Nomor : …………………………,
Tanggal ……………. 20………
2. CCO I Nomor : …………………………,,
Tanggal ……………. 20….
3. CCO II Nomor : ………………………………,
Tanggal ………….. 20….
4. CCO III Nomor : …………………………………,
Tanggal …………….. 20……..
5. Laporan Progress Mingguan ke …….

Bertempat di Proyek Pelabuhan Laut ……………… - Kabupaten………, telah dilakukan opname


lapangan dalam rangka defect list pada pekerjaan sebagai berikut :

1. Nama Pekerjaan : Pembangunan Pelabuhan Laut ……………… - Kabupaten


………….
2. Lokasi Pekerjaan : Pelabuhan Laut ………….. - …………….
3. Waktu Pelaksaan : ................ hari (CCO II)

Berdasarkan hasil opname lapangan defect list disepakati bersama sebagai berikut:

1. Opname Defect list dilakukan terhadap item pekerjaan terpasang dengan melakukan pemeriksaan
dan pengukuran dan membandingkan hasil pengukuran dengan volume BOQ dalam Surat
Perjanjian (Kontrak) dan Addendum Kontrak, Shop Drawing, As Build Drawing, Laporan
Mingguan, Laporan Dokumentasi dan Berita Acara Prestasi Fisik;
2. Pemeriksaan dan pengukuran dilakukan terhadap seluruh item pekerjaan yang tertuang dalam
Surat Perjanjian (Kontrak) dan Addendum Kontrak;
3. Berdasarkan hasil pemeriksaan dan pengukuran, disepakati pihak Kontraktor telah melaksanaan
seluruh item pekerjaan dengan progres Fisik Komulatif pekerjaan pada Minggu ke-..............
sebesar 100%.
4. Berdasarkan hasil pemeriksaan dan pengukuran, disepakati adanya beberapa item pekerjaan yang
mengalami cacat kurang dan Kontraktor akan memperbaiki sampai dengan dapat dinyatakan
dapat dilakukan pemeriksaan pekerjaan pertama dalam rangka PHO;
5. Diperiksa dan dihitiung di lapangan berdasarkan kondisi sebenarnya di lapangan;
6. Ceklis opname lapangan defect list sebagaimana terlampir dalam berita acara opname lapangan
ini;
7. Berita Acara beserta seluruh lampirannya merupakan satu kesatuan
Demikian Berita Acara Opname Lapangan Defect List ini dibuat dengan sebenarnya dalam rangkap
secukupnya sebagai dasar pemeriksaan pekerjaan pertama dan untuk dapat dipergunakan sebagaimana
mestinya

…………….., ……………….. 20…..


Diajukan oleh: Diperiksa dan disetujui oleh,
Kontraktor Pelaksana Konsultan Pengawas
[nama perusahaan kontraktor] [nama perusahaan Pengawas]

[nama project manager dan gelar] [nama tim leader dan gelar]
Project Manager Team Leader