Dara Sakor Resort Working Plans
Dara Sakor Resort Working Plans
NOTE:
Working Line
.5
1:1
.5
1:1
.5
1:1
TP1+00 0 10 20 30 40 50 60 70 80 90
KEY MAP
vertical alignment
working plan 14.70 14.70 14.70 15.669 14.70 14.70 14.70 14.70 14.70
ground level 12.7 13.95 15.301 15.848 17.701 18.601 21.607 23.429 26.611 28.551
total level 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90
extra point No1+00 No1+10 No1+10 No1+10 No1+10 No1+10 No1+10 No1+10 No1+10 No1+10
REVISION
CHECKED BY :
APPROVED BY :
SCALE DATE
STA1 WORKING PLAN
1 SCALE = A3 = 1 / 300
A3= AS SHOWN
DRAWING TITLE
02-AUG-2023
DRAWING NO.
BU-01
Small Stone
Natural Line
ST RUSSIAN FEDERATION BLVD 110, KHAN 12406
PE Drain Pipe
Ø50mm@5m NOTE:
Natural Stone
Working Line
.5
1:1
.5
1:1
.5
1:1
TP2+00 0 10 20 30 40 50 60 70 80 90
KEY MAP
vertical alignment
working plan 14.70 14.70 14.70 15.669 14.70 14.70 14.70 14.70 14.70
ground level 12.7 13.91 14.92 16.60 16.969 18.65 21.5 24.14 26.242 28.356
total level 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90
extra point No1+00 No1+10 No1+10 No1+10 No1+10 No1+10 No1+10 No1+10 No1+10 No1+10
DRAWN BY :
CHECKED BY :
APPROVED BY :
SCALE DATE
STA2 WORKING PLAN
2 SCALE = A3 = 1 / 300
A3= AS SHOWN
DRAWING TITLE
02-AUG-2023
DRAWING NO.
BU-01
Con'c Drainage 500x500
Natural Stone
Working Line
.5
1:1
.5
1:1
.5
1:1
TP3+00 0 10 20 30 40 50 60 70 80 90
KEY MAP
vertical alignment
working plan 14.70 14.70 14.70 14.70 14.70 14.70 14.70 14.70 14.70
ground level 12.7 13.66 15.07 16.56 18.45 20.92 23.74 26.49 28.54 29.8
total level 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90
extra point No2+00 No2+10 No2+10 No2+10 No2+10 No2+10 No2+10 No2+10 No2+10 No2+10
PROJECT NO.
DRAWN BY :
CHECKED BY :
APPROVED BY :
SCALE DATE
STA-3 WORKING PLAN
3 SCALE = A3 = 1 / 300
A3= AS SHOWN
DRAWING TITLE
02-AUG-2023
DRAWING NO.
ST RUSSIAN FEDERATION BLVD 110, KHAN 12406
NOTE:
KEY MAP
PROJECT TITLE
Small Stone Back fill 140 m3 140 m3 140 m3 420 m DARA SAKOR RESORT
PROJECT
PROJECT PHASE
PROJECT NO.
DRAWN BY :
Natural Stone Works
2 SCALE = A3 = None
CHECKED BY :
APPROVED BY :
SCALE DATE
A3= AS SHOWN 02-AUG-2023
DRAWING TITLE
DRAWING NO.
ST RUSSIAN FEDERATION BLVD 110, KHAN 12406
NOTE:
235
+14.70
2000
+12.90
KEY MAP
vertical alignment
working plan 14.70 14.70 14.70 14.70 14.70 14.70 14.70 14.70 14.70
ground level 12.7 18.45 15.07 16.56 18.45 20.92 19.3 19.3 19.3 19.3
total level 0+00 0+20 0+40 0+60 0+80 0+100 0+120 0+140 0+160 0+180
extra point No2+00 No2+10 No2+10 No2+10 No2+10 No2+10 No2+10 No2+10 No2+10 No2+10
REVISION
PROJECT TITLE
DARA SAKOR RESORT
SECTION -A PROJECT
1 SCALE = A3 = 1 / 300 PROJECT PHASE
PROJECT NO.
DRAWN BY :
CHECKED BY :
APPROVED BY :
SCALE DATE
A3= AS SHOWN 02-AUG-2023
DRAWING TITLE
DRAWING NO.