QUALITY sySTEM
stem!)
paspages. comlcategory/environment-health-and-safety-system/)
ESMS (hitos:/wwingaspages,com/caleqory/ood-safely-management-system/)
‘EnMS (httns://wwwinnaspages,com/category/energy-management-system/)
180 17025 (nipuiwiww.innasrages.com/categorylisa-t7025)) Q
Blog Home (htesvimmwinpaspages.com) » Quay Taos (tps iAwinadvanced product quality
planning for new product
development
2 ont (tps wainnaspages.comfauthortbmand0.2) —
Qual Toks (ts: /wwinespages cam/ategorylauath
February 8, 2019 -
tools)
APQP (advanced product quality planning) for new product
development. - Step by step procedure for implementation and
process management by advanced planning tool
What is purpose of APQP?
APP (advanced product quality planning) for new product
development. ~ Step by step procedure for implementation and
process management by advanced planning tool
Where to implement APQP?
This is applicable to all products/ manufacturing process
development activities & revisions in existing products/
manufacturing processes (e.g. Changes in product specification
requirements, raw material to be use, product out of current
manufacturing range etc.).
What will be inputs of it?
Customer requirements of product. Manufacturing feasibility,
previous product/ process development experience, similar
application products being manufacture etc.
Step by Step guide for implement APQP in organization
Activity of APQP
+ The Activity of APQP is carry out for any special customer
requirements receive. Where entire manufacturing process cycle
Search
I Popular Posts
Gauge R&R (Gauge
Bi ity an
Reproducibility) Stuey
(otto:
coducbiliy-study/)
Internal Audit check
(btips:/wunw inpaspages.com/int
‘emal-auditchecktisy)
‘hiins:wwwwingaspages,comlad
roduct-qualiy =
roduct-development)
cof service twalization
procedure example
{hiins:wwwwinpaspages,com/ola
anning-of-service-realization-
procedure-example/)
‘Quality assurance report
template for excel
{https Jwwwingaspages.comiqu
alty-assurance-report-template-
for-exoel)
Preventive Actions for Provent
Potential Failures - Procedures
{hllpsivwvwinpaspages com/or
tive-aetions-for-nrevent-
potontial-falures-procadures!)
Customer Feedback
{hilps vwnwingaspages.comlcu
stomer-feedback/
‘System improvements, enhance
he resources reliability and
system value
{hitps:vwnwingaspages.comisyneed to be establish. APQP is carry out through different stemImprovements-enhance:
phases
system-valu
+ After receiving the inquiry for development of new products, stow te Conta
immediately following actions are to be initiate. inerunmats?
+ Across functional team generally comprising of personnel from (https: inpaspages.comiho
yols-on-measurng
production, QC, Purchase, Planning and marketing is form. One instruments)
team leader is to be nominate, the team should define the scope
Waste Management Plan
considering customer need, expectations & requirements. Chea
(https wwecin
nanagement.
spages.comiva
Plan & Program
In the first phase of plan & define program following outputs should be
generate:
+ Defining customer requirements specific to product
performance. Preliminary process flow charts for product
manufacturing Preliminary listing of special product & process
characteristics.
+ Initial risk evaluation is done to ensure that risks encounter are
considerable,
In the second phase of product design & development following outputs
are to be generate.
+ Customer drawings / specifications review is complete resulting
in finalize product drawing/ specifications.
+ Special product and process characteristics are document.
Prototype control plan, if prototype is to be develop. (If speci
by the customer)
+ New equipment, tooling, and facilities requirements are review.
+ Gauges / testing equipment requirements, if any are review.
+ Team feasibility review report shall be sign by all team members,
on review as above i.e. once feasibility of product manufacturing
is ensure,
In the third phase of process design and development, the inputs from the
second phase are to be taken in order to generate the following outputs.
+ Packing standards if specify by customer and different from
existing packing+ Product / process quality system review is carry out.
+ Process flowchart if being different from existing process is
prepare. Floor plan layout if existing floor plan needs some
modification for manufacturing, new part family or new type of
machine / equipment is to be made available,
+ PFMEA, if new PFMEA is to be prepare or existing PFMEA
needs revision for new product development. Process
instructions, if any new process is to be develop or product
specific care is to be taken during manufacturing.
+ Measurement system analysis plan, if new measurement system
is to be use.Preliminary process capability study, if applicable.
Review all above mention activities to ensure management
support.
In the fourth phase of product and process validation, the inputs from the
third phase is taken in order to generate following outputs Production
trials run,
+ Measurement system evaluation, if new / non — evaluate
measurement system is involve, Preliminary process capability
study.
+ Production part approval. Sample performance test if require
+ Packing evaluation, if new packing is to be use. Quality planning
sign- off and management support is ensure.
+ Manufacturing process conformance is ensure. Process
specifications as refer in control plan (e.g. draw bench speed,
Annealing temperatures etc.) are finalize once process sign off
is over,
In the fifth phase of feedback, assessment and corrective action, the
inputs from the fourth phase are to be taken in order to generate the
following outputs:
+ Reduce variation through appropriate SPC tools to demonstrate
stable process, where applicable. Customer satisfaction through
approvals from customers & regular supplies.
+ The progress of APQP will be review in the management review
meetingWhat is output of this process?
Product & manufacturing processes validate with respect to
customer requirements,
List of documents are use in APQP are:
APAP time schedule
- Preliminary flow chart
. Initial risk evaluation checklist
. Design information checklist
New equipment tooling and test equipment checklist
. Team feasibility report
. Product / process quality checklist
Process flowchart checklist
Floor plan checklist
Seerngaapwon oa
10. process FMEA checklist
11, MSA Plan
12. SPC Plan
13, Product quality planning
14. MSA studies
15. SPC studies
16, Product quality planning summary and sign- off
17. Process sign off checklist
18. Special characteristics monitoring record
{https://www.blogger.com/blogger.g?_
&blogID=8081465525434502044)
(https://www, blogger.com/blogger.g?
rinli=1 &pli=1&blogID=8081465525434502044)
Here, one out of the above documents — Process Flow Chart
Checklist format:pcs FLOW CHART CHECKLIST ®.ramanen —
vestion ‘ves| No| Comment /Action Rewuired | q,feita,, | Oa
(http:/www,inpaspages.com/advanced-product-quality-planning-
for-new-product-development/apgp_process_flow_chart_checklist/
Process Flow Chart Checklist format
© Previous Post
Preventive Actions for Prevent
Potential Failures — Procedures
(https:/www,inpaspages.com/
paspag
es.com/aut
hot/ibman O*bitis @ expert in solutions of industrial problems
80-2) viz quality, production, planning, inspection etc.
Orbit is writes about manufacturing's problems and
its state solutions for quality lovers...> YOU MIGHT ALSO LIKE
Training Layout Inspection
Attendance & Plan
Evaluation report (https:/www.inpa
format ‘spages.comllayou
(hitrsiww.inpa -—_‘tsinspection-plan/)
spages.comitrai © ayet23,2014
ng-attendance.
evaluation-report-
form:
© Apel 12,204
© October 17,2013,
Copyright - Inoaspages.com,
‘The contents copyrighted to inpaspages.com and may nol be reproduced on other websites / any media