923 Development: Construction Projects Overview

Engr. Joey Nerecina owns and operates 923 Development & Building Construction, which he registered in 2019. The company is currently working on two major projects - a 4-story house in Quezon City with a budget of over 20 million pesos, and a 1x12 MWe biomass power plant in Bocaue, Bulacan. Nerecina has over 20 years of experience in civil engineering and construction management, having worked on projects in the Philippines and abroad. 923 Development specializes in structural steel, architectural steel, and interior fit-out works.

Uploaded by

Joey Nerecina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views20 pages

923 Development: Construction Projects Overview

Engr. Joey Nerecina owns and operates 923 Development & Building Construction, which he registered in 2019. The company is currently working on two major projects - a 4-story house in Quezon City with a budget of over 20 million pesos, and a 1x12 MWe biomass power plant in Bocaue, Bulacan. Nerecina has over 20 years of experience in civil engineering and construction management, having worked on projects in the Philippines and abroad. 923 Development specializes in structural steel, architectural steel, and interior fit-out works.

Uploaded by

Joey Nerecina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

A.

GENERAL INFORMATION

923 DEVELOPMENT & BUILDING CONSTRUCTION is a Single Proprietorship


Business registered by its owner ENGR. JOEY T. NERECINA with the Department of
Trade and Industry (DTI) on October 2, 2019 to make his growing construction business
legitimate. At present 923 Development, for short, is doing two major projects. One is in
Brgy. Immaculate Concepcion, Cubao, Quezon City a four (4) storey house with a
budget cost of more than P20 million and the other one at Bonamy
Compound,Wakas,Bocaue, Bulacan a 1 X 12 MWe Bio-Mass Power Plant

Engr. Joey Nerecina was born in Brgy. Inabasan, San Jose, Antique and studied until high
school in San Jose, Antique. He moved to Manila City for his college education but
unfornately he did not pursue due to some factors and turned back to the Province to
continue his education where he finished his Civil Engineering Course from year 1995 to
2000.

He passed the Civil Engineering Board Examination on November 2000 and started
working in a Local Company in the Province of Antique to gain some experience.
Moved back to Manila in the year 2003 to look for a greener Pasteur and have a chance to
work for The Crowne Plaza in Ortigas Pasig and El Shaddai Formation Center in
Paranaque.

He had the chance to work abroad for 3 years from year 2008 to 2011 in order to gain
more experience as a Civil Engineer. When he came back to the Philippine and decided to
stay for good and employed locally.
From the year 2000 to he worked 2011 with the following corporations:

1. ARCH. MIKE LAZO AND ASSOCIATES (ANTIQUE)


2. INTRAC CONSTRUCTION CORPORATION, ARCHITECTURE AND INTERIOR
FIT OUT CONTRACTOR OF THE CROWNE PLAZA IN ORTIGAS PASIG
3. ACRO INDUSTRIAL AND DEVELOPMENT, GENERAL CONTRACTOR OF
THE EL SHADDAI FORMATION CENTER IN PARANAQUE
4. AL FARAA CONTRACTING AND ENTERPRISES IN ABU DHABI UAE, THE
FISHER MALL ABU DHABI
5. TAISEI, SKY ORYX JV IN QATAR, FOR THE NEW DOHA INTERNATIONAL
AIRPORT

The last company where Engr. Nerecina worked as a Construction Manager for Seven
(7) years, before he went on his own, is the MODERN DWELLINGS INC. The
company is developing, constructing and marketing modern and high end townhouses and
singled detached houses. Working with Modern Dwellings became a good training
ground for Engr. Nerecina to be prepared to go on his own and it widened his experience
and contacts in the construction Industry.

Eventually in the near future his plan is to convert 923 Development & Building
Construction into a Corporation in order to expand the scope of his construction business.
THE STAFF:

Eng’r. Joey Nerecina General Manager


Arch. Rommy Michael Combong Project Architect
Eng’r. Paul Ascano Operations Manager
Eng’r. Aileen Chua QA/QC Engineer
Eng’r. Federico Mauricio Project Engineer
Eng’r. John Paul Javier Electrical Engineer/Sanitary
Eng’r. Gian John Quinones Junior Site Engineer
Eng’r. Jed Tatoy Admin Officer/Comptroller
Anna Alberto Accountant
Normaine Melliza Safety Aide
Alvin Valaris Site Nurse
Honorio Rubio Warehouseman/Timekeeper
Glen Frey Del Rosario Surveyor
Salvador Buso Foreman (Architectural)
John Dale Paraon Electrical Supervisor
Lorenzo Peralta Foreman (Civil/Structural)
Gomer Corong Structural Steel Foreman
Ricky Mallada Foreman (Painting Works)
B. TECHNICAL EXPERTISE:

923 DEVELOPMENT & BUILDING CONSTRUCTION had


extensive exposure on the following major work areas:

1. In type of projects:

a. Steel Structural

-Trusses / Roof Framing


-Structural Building Frames
-Build-up Columns & Beams
-Pole Netting
- Elevated H20 tanks
-Wall Framing

b. Architectural Steel
Works:

- Steel windows and grills


- Steel doors (typical gate doors; mechanical
sliding Door)
- Steel bracket
- S/S cover, S/S handrails
- Steel stairs

c. Civil / Architectural /
Interior fit out Works

- Gypsum / Ficemboard Ceiling & partition


- Cabinets and other carpentry works
- Painting works
- Tiling Works
C. LIST OF COMPLETED AND ON GOING PROJECTS UNDER 923 DEVELOPMENT &
BUILDING CONSTRUCTION:

1. PROJECT: MR. & MRS. JOHN ZABALLERO


LOCATION: No. 8. Narra St. Sitio Seville, Fairview Quezon City
DURATION: November 2017 to August 2018
BUDGET: PHP 13, 450, 000.00

2. PROJECT: MR. & MRS. ROWENA MANZARETE


LOCATION: Sampaloc, Manila
DURATION: July 2018 to December 2018
BUDGET: PHP 5, 690, 000.00

3. PROJECT: MR. & MRS. WILFREDO MENOR


LOCATION: 13A Brooklyn St. Immaculate Concepcion Quezon city
DURATION: February 2019 to Present
BUDGET: PHP 21, 340, 000.00

4. PROJECT: NWORLD HUB


LOCATION: Brgy. Mayamot, Antipolo City
DURATION: March 2017 to May 2017
BUDGET: PHP 1, 210, 000.00

5. PROJECT: 12MWe BIO MASS POWERPLANT


LOCATION: Brgy. TAAL, MCARTHUR HIWAY BOCAUE BULACAN
DURATION: MARCH 2020 UP TO PRESENT
BUDGET: PHP 105,000,000.00

6. PROJECT: RENOVATION OF 3 STOREY COMMERCIAL BUILDING


LOCATION: Lilac St. Concepcion Uno, Marikina City
DURATION: February 21, 2022 up to Present
BUDGET: PHP 4,165,000.00

7. PROJECT: INTERIOR FIT OUT OF 1 BEDROOM CONDO UNIT


LOCATION: AVIDA TOWER, Mandurriao Iloilo City
DURATION: Februrary 30, 2022 to May 15, 2022
BUDGET: 1, 400,000.00
B. LIST OF COMPLETED PROJECTS UNDER MODERN DWELLINGS INC AND
OTHERS:

1. PROJECT: 6-UNITS TOWNHOUSES


LOCATION: 16 Malumanay St. Teachers Village, Quezon City
DURATION: September 2011 to May 2012
BUDGET: PHP 18, 340,000.00

2. PROJECT: 6-UNITS TOWNHOUSES


LOCATION: 93 Maningning St. Teachers Village, Quezon City
DURATION: May 2012 to February 2013
BUDGET: PHP 20, 680,000.00

3. PROJECT: 11 UNITS TOWNHOUSES


LOCATION: Don Victorino St. Don Antonio Hts. Quezon City
DURATION: May 2014 to July 2015
BUDGET: PHP 60,000,000.00

4. PROJECT: 4 UNITS SINGLE DETACHED


LOCATION: Sun Valley, Brgy. Inarawan, Antipolo City
DURATION: May 2015 to May 2016
BUDGET: PHP 16,000,000.00

5. PROJECT: CROWNE PLAZA


LOCATION: ORTIGAS PASIG
OWNER: ROBINSONS LAND CORPORATION
DURATION: APRIL 2003 TO MAY 2006

6. PROJECT: EL SHADDAI FORMATION CENTER


LOCATION: Brgy. San Dionisio, Paranaque City
OWNER: BRO. EDDIE VELARDE
DURATION: JUNE 2006 TO SEPTEMBER 2010
PROJECT: JOHN ZABALLERO RESIDENCE
LOCATION: SITIO SEVILLE, FAIRVIEW, QUEZON CITY
DATE: NOVEMBER 2017 TO AUGUST 2018
PROJECT: MR & MRS. WILFREDO MENOR
LOCATION: 13A BROOKLYN ST. IMMACULATE CONCEPCION, QUEZON CITY
DURATION: FEBRUARY 2019 T0 DECEMBER 2020
PROJECT: MR. & MRS. ROWENA MANZARETE
LOCATION: SAMPALOC, MANILA
DURATION: JULY 2018 TO DECEMBER 2018
PROJECT: 12MWe BIO MASS POWER PLANT
LOCATION: BOCAUE, BULACAN
DURATION: MARCH 2020 UP TO PRESENT
PROJECT: EL SHADDAI FORMATION CENTER
LOCATION: AMVEL BUSINESS PARK PARANAQUE CITY
DURATION: APRIL 2005 TO DECEMBER 2010

PROJECT: 6 UNITS TOWNHOUSES


LOCATION: TEACHER VILLGE DILIMAN QUEON CITY
P

ROJECT: 1 BEDROOM CONDO UNIT AT AVIDA TOWER


LOCATION: ILOILO CITY
DURATION: FEBRUARY 30, 2022 TO MAY 15, 2022
PROJECT: 3 STOREY COMMERCIAL (EVENT PLACE/RESTAURANT)
LOCATION: MARIKINA CITY
DURATION: FEBRUARY 21, 2022 TO PRESENT
PROJECT: 2 STOREY RESIDENTIAL BUILDING
LOCATION: FELVILLE SUBD. STA. CRUZ, GUIGUINTO BULACAN
OWNER: MR AND MRS NOEL SUMAGAYSAY
PROJECT: HOUSE EXTENSION
LOCATION: IMUS CAVITE
OWNER: MR AND MRS GENE
PROJECT: 12MW BIOMASS POWERPLANT
LOCATION: BOCAUE BULACAN
OWNER: HYPERGREEN ENERGY CORPORATION

STRUCTURAL STEEL AND ARCHITECTURAL STAINLESS STEEL WORKS