0 ratings0% found this document useful (0 votes) 288 views10 pagesElectrical Engineering-Tables
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
tek. yo, om
emia ouside recs Wraight ‘nse Weight ‘ose Wit
‘Soe Sartor Dlameier ‘ert er planer re
wn) o © o o ©. o rc
x oars ons oon O78 ease ears ome
s am >a 400 26 a3 285 28
3 aes aa 5 aes 43 ase 358
emia Se tse oar snsce Dae islaneper (ne)
co on wo Taco eS Comper aoe Capper
2 273 2062 402 aa rs
2 ears 2500 a8 00 6“a Semis, olarmeter rns, ete rege Seciona oh
or ro ‘i oo ‘erie reds ‘ca i weet
TABLE 1212 WEIGHTS AND DIMENSIONS OF EXTRA STAONG 004 WEIGHT SCHEDULE 60 STEEL PPE
Irs vat weiss per vice ona
Biemeter “Tacks Footie ‘root Sectional Sone
im o rs Pours “ara i). vebety
ozs 005 osu 0036 a
oss ona? 08 oat 73
200 0300 1025 ens 260
aan 0375 an saw 56720
te
ome gepnza ineow in Gallons per Mowe
an
1. This chart applies to farty rough pipe and to actu diameters which in general
‘will be lass than tse sctuai dlamaters of the new pipe of the ame kind.
Matric added by author.
AURA
FIGURE 13.7 Pressure loss trom friction caused by water flow in rough pipe (steel or
iron), based on flow rate and pipe diameter.FRICTION LOSS IN SMOOTH PIPE
Feton los in headin KPa Per 10m fh
228 me 462 2682 aot 306 2226
“a ca
Bal Geope Taba
Bin) “Simon Ape
Tent — — — — 70
ret
Spex —
aso
gf ag8
Be 8 BS sees
126
Bu ss eseet
ea
ae
es
a4
Fos ats Partnnute
Flow in Liters per Second 1)
025
ora
208
72 3 45 a7 eer QS «SB THO PO 9 AOBEeD BD 100
Fictlon Loss Ls. par Sa in. Head per 100 Lang
4. This chart applies to smooth new copper tubing with recessed (streamlined) soldered
joints and to the actual sizes of types indicated on the diagram.
Note: Metric added by author
FIGURE 13.6 Pressure loss from friction caused by water flow in smooth pipe (copper
tubing), based on flow rate and pipe diameter.Bose 1s oz an
a 2 es 7s ona
{OLE 1928 EQUIVALENT LENGTHIN METERS OF TUBING FOR FRICTIONLOSS INVAIVES AND FITTINGS (TUBING).
_Equnalont Matos of Pipe er Various Nominal Damnstos
ting eva fim em nm mm Km Sm Sam
{45° abowe sous) 02 02 03 03 os oe 2
90" ebew ours) 02 os 03 os os oe as
Toa sali (rough) 02 02 02 03 re os *
ee bree (wouat) 03 os oe 12 as 21 =
Asrobew (se) 02 03 os os oo te a
90" eben 5) 03 os 12 18 24 a 58
Teo craig nn (act) 02 02 02 03 3 ce ae
‘eo. tran cee) os os 1 a 28 2 eo
Compression ap 1 o 02 = * “ “
Gene vave = “ = wean ms = =
Gatch = = ee 02 ee 0c ee ee
TABLE 1838 EQUIVALENT LENGTH IN FEET OF THREADED PIPE FOR FRICTION LOSS IN VALVES AND FITINGS (THREADED PEE).
Enuivalrt Fate ie fo Vacs Nerina Diameters
HOLE 1924 EQUIVALENT LENGTHIN FEET OF TUBING FOR FRICTION LOSSIN VALVES AND FITTINGS TUBING).
Equvatert Foot Pige er Yrous Nonira iets
Fig rv in in sin i kin 2in iin Sin
45" obo (wrought) os os, 10 10 20 20 20, 40
‘rebar (wrought os io 19 20 20 20 20 30
“ea, saight on reugh) 05 os 05 os tb to 20 =
‘Tee, brarch (wou 19 20 30 40 50 to 20. =
45rebon (ash D3 10 20 20 30 50 a0 no
Soreber (058 0 20 © 50 20 so or 10
“ee, stalgt run cas) 05 05, 05 10 10 20, 20 20
‘ee, branch (cae 20 EC 50 20 20 120 ome
(Compression sop 130 210 a0 = = = = =
Gisbe sabe ~ a ~ so eo soe = =
Gate vane = = 1 18 20 20 20 20
TABLE 1930 EGUVALENT LENGTH INFEET OF THREADED PIPE FOR FRICTION LOSS IN VALVES AND ATTINGS (THREADED FIPE).
Ecpivalrt toe Pipe fr Vio Nominal imate
tino o Vat igen mm smn am Om mma
45 sbow os os 05 os os 2 15
Too, adaigtun 02 2 03 oa oe te oa
“oo. tree 08 rr 15 18 2a a a7
Gate veh ot a2 02 a2 03 a as.
Balanang cho 02 os 05 os or os sh
Pug-ype cock oz os 03 os or oe a
Check wave, ng 7 26 a4 43 51 ee ae 139
(Ghte ave 45 a 78 7 a7 a8 198k
‘Ai valve 2s 37 45 55 67 86 joa tee‘TABLE 185 APPROXIMATE FLOW RATES AND TYPIGAL CONGUVPTION BY TYPE OF PLUVONG FIXTURE AND LOSATION.
FLOW RATE VARI=S SIGNIFCANTLY 8Y RESIDUAL PAESSURE (WATER PRESSURE BEFORE THE FIXTURE)
‘Asoroserate ow Rates by Fors Ts
atta vce sesem tsb s0Linin 025 20SUs
Cette acer (bundy) tesa HeLa esemozeUe
Distwaster comeste) sbsom Teun Ciemosus
Dining buna Sumin 005Us
Hees abe (1) 1827 oreo ue
wither ake 2osom BtosT Lime orsieoosus
Lute faucet 2esem Bieriume eismoreus
ln sper (ores) Seven 127i Siew ousus
‘Showoresd (ow lw datgn) 2b3pm Biot time Sismoraus
‘Stewaread (tana fou sion) sesmm 1p23Lmn 0.18 008Lisee
‘otek tis tank Sbsem HeLa ‘esewoaeus
“ode or unnal,1fshave (15t 0p) eer 103 0133 Un Sate 2aae
“ypc Consumplin or Ubon er Suburtn eidones
er person pr ay i puposes swiozaL, =
Per showoe pore seas =
Feat, pe fit Tau =
“ypc Consumption for Purl Rasderce
er erson pr ay, i puposes com ae -
Per here, dy com beet ania po ey el aL =
Per mikirg eam pt oy Sel sa -
Per nea aay aa SL =
Fe sh per day ea eb
Per 100 cere por day ca aL
TABLE 13.6 APPROXIMATE WATER REQUREMENTS FOR SELECTED BUILDINGS.
Nunber of Faeures
{Typical Flow Fate
oerpaney Type __ shel Demand Load 01050 61100 10116200 20149400 40 1980060101200 Over 1200
Flow ai, omititure 505 20 28 2s 26 2
Apartments Minmumcapactygpn 6 a & io ao so
Maximancapeciy gem 25S eo us 200 200 =
ow aio, prixire 4.0 —~—~—EO 0 50 40 a0 7
Hospitals Winmum capasiy.gom 25S as 125 210 20 500
Maximum capeciy gam 50. 120 200 320 4a =
Flow aio, omixure 6S SSCS 45 35 ox 25 2
Hotel” Minmum capactygon 25S eo 00 180 Es 30
Mexmaneapesty gem 33S 0 140 240 200 =
Flow ae, gone SSS 7 0 “25 30 =
Mercantile Minmum eapaciy.gom 070 a0 +50 250 460 0
Maximum capaciy gpm 6575, 0 240 440 00 =
Flow aio, gpmifiure 1. 70 a 50 a7 20 a
Officet= Minmum capactygom 35 a0 140 0 Z 0
Maximum capaci gam 5870 1 200 500 20. =
Flow ae, gare 1.0 20 40 40 a0 70
‘Sehaotet Winrmum eapasiy.gpm 20D 7 a0 eo 240 500
Maximum capacity gam 50 100 160 20 4a =
‘Nats ape tsa onan ua numberof os and wen ocapanis If th majonty of esopants are women incrar th capt by 15%
* Were aundy is opera connctioewih the blag. increase the capacity by 10%
‘These als dono incde wat for special procest work. Then snout shad be dtemined and del tthe total capaci.JAGLE 197 SUPPLY, BRANCH SIZE, AND WATER GUPPLY FUTURE UNIT LOAD AEOUIREMENTE OF COMMON PLUMBING FIXTURES.
Mair Branch Water Supe Ft
Pie S22 ote
Fistwo pe occupancy Supp Conteh _in_——ram __—Taah——CCald Vilna aa
Biss oy Faves 10 + % *
Daeting union =u ‘Shute ie os 2s =
eve ways Prva Fave as 2 2 2
Levatory rate Faves x8 + co *
Laon ue Faues aw 2 u 1“
Serve oak Pub Fou as 2 ee 7
‘srowereae™ vate vane ae 8 2 1 te
‘Showernead” ue ag ae ss, 4 3 s
Uist Prato uch vale k 8 ’ . ~
ater coset Prats Fushi x 3 3 =
‘ap size
singe Prats fo o~ 3 2 2
‘clit nd was ces seria fae salen ee aur (of ce nl WSF ao ce
‘ASLE129 WATER SUPPLY FOCTURE UNIT (WS=U) LOAD AND RECOMMENDED DESIGN LOAD, IM GPA, LAIN, AND LS FOR
cro eutarss (e3.roean)
4 (arose
ter Sup Fatrs PPS MoS _ ter Sup Ete
Unrtced nerd)" pm unm us sem umn Us apm umn sunt ast
= Ss o 6 em a om a =
1 te Gr 8s i sm nT sm‘TABLE 13.3. WATER SUPPLY FIXTURE UNIT (W3FU) LOAD AND RELATED DESIGN LOAD, INGPM, LIM, ANDLIS, BASED ON
HUNTERS MORK ON INSTANTANEOUS DOMESTIC WATER DEMAND.
Seen oro Seen
— —
a
100 a ar 33 = as 0
200 & oa u a ae ee ee
= 5 a o 109 0 fs 0
io s a 3 i oe % 300
> os a n to Be ae 0
‘0 20 wes mts ‘000
‘00 mtu ‘00
200 Seok 2000
200 Bo tease ey tae a0
50 Bosse Sms oo
sao mo 80 me ‘om
0 mo 0 mS ta 00‘TABLE 1310 MAXIVUM WATER SUPPLY FIXTURE UNTS (WFSU) FOR & SUPFLY PRESSURE (THE AVAILABLE STATIC
PRESSURE AFTER HEAD LOSS) AND SPECIFIC PIPE SIZ=.
Meer end Buiding Suppty Maxieum Devlaped Length (8)
‘Sippy ‘Sree Savico and arch
Pressure Pipes) Pipes(i) __40_—-60_—gO__— 0015020009000
0045 pet x x 6s 6s 4 3 2 4 34
% x 6 6 4 2 8 § 6&
x 1 0 8 nom oT BO
1 Pe ee
iowa * ¥ 7 7 6 5 4 3 2
x x 0 20 8 7 w one
1 ™ mm 6 TF 2 & 2%
1 v oes SSS
‘Over 60 psi * ¥ 7 7 7 6 5 #3
x * 2 2 20 2 oF 8
% 1 3s 3 3 OH
1 1 2 3 3 OURO
1 1% m% 7% 7 7% mm @ 4
Nominal Pipe Size ave sive oa 7H tus ons woe
* a6 44 51 58 6s 73
x 7s so 105 24 136 153
ve 27 2 288 43 48 554
2 2 578 ora 74 167 963
3 80 were 4 sea 108 2123
a wad waa 2008 24 2581 268
4 064 237 261.0 283 356 a8
TABLE 13.9 WATER SUPPLY FDXTURE UNIT (NS=U) LOAD AND RECOMMENDED DESIGN LOAD. IN GPM LAAN, AND US. FOR
Selecren auLone Tres.
Inara Boge
Hotels and Motte (ce Butngs (eo. Hosp)
leer Supt Pore Mite Suppl Extce
Untised Wise) gpm __Unin Ue gpm Uimin scp in Us saa (SE
0 % a 6) Se Sk 0
4500 ws 75s ok 100,TABLE 18 11_TYPEL COPPER TUBE (PIPE) DIMENSIONS AND MAXIMUM DEMAND IN GPM AT COMMON MAXIMUM SUPPLY VELOCITIES.
at Common Navimun Supt Vlocties
Nomina pe Size ans. its, owe r01
x 60. va 136 181
1 03 68 2a 27
2 a5 na a7 963
2s 24 maa sm? a8
4 493 2083 m6 3728
BLE 1217 TYPICAL HOT NATER DEMANDS FOR VARIOUS TYPES OF BUILDINGS.
asim oe Hose Macnee Day era er Day
ye stung a L L a L
fod serve estan manera as sr no er 2a a
‘po hana! stuart a extaas o 23 3 ar oF 26
“pe Beinn, ilar, sanewieh aoe
‘nert hous port
“oo 20 ass a0 20a 2s
aris rar, shart 28 te za ee cf ‘e7
‘Wires commen pr shat 58 2 as 100 Ba ae
al por unt ander tee Uist
Arig hres pbk aS es 223 an ‘ea ar
ico being po poeon oa 1s 23 ‘8 “e 28
Enreary ool ar int 06 23 1 a 06 23
shhiorendeior igh acho pet ten? SS a 3 186 se ea
napster tat alo
“Pend option
TABLE 1818 GUE TO SELECTING THE MINIMUM GAS FIRED STORAGE TANK VATER HEATER SZE_IN GAL ADD 20GALFOR
Watorhestortaneeims.eat = «20 SO SS
Frsthow copacygav == 35 4S STD] TSO
Wank sice,L eee
Festhourcapaciy,Lhy 12217000828