0 ratings0% found this document useful (0 votes) 103 views2 pagesOP Checklist
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
em. Descrip ca eduled | __ Actual Date
1 GBP Final Amendment Drawing |
fi) subi = st
[fit aporovat ee ee
y 2 [Drainage Final Amendment Drawiny
: __—_i}_submission
fi). appraval
i (3, [Plumbing }
13) __ Water main connection ae a i
i Ba eingl VLD drewing to WSD
13.3__- |Porm 132 submission i
3.4 Water imcicr installation
5.5 |For WW046 submission _ _L 7
: 3.6 [W.A: Inspection.
13.6. |Weler certificate granted
ld ing Serviews _
ld. [Final Form 314 He
fy submission _
li) approval 1
4.2 [Weter nwiss connection eerie
14.3 [Form W086 subnission ’
lid |W.A, inspection 7
[4.5 [Weer cestificue ranted is |
[4.6 [Form 501 submission = ' ce 1
\a.7 FSD Inspection _ t
46 __ [Fire certificate granted 7
1S Blecteteal fnstaliaiivn
Tm TX room handover abe
|52___ [Cable draw pit randover ae
| (53 -feabte laying completion a
53° -_|D.G. licence Submission =
/ 458 [Ps inspection 1
[5 — |D.G. ioence pranted a | 7
“> (5.6 © Power On 7
: iy ule Zann aene ues
am | Deseriptivn ‘Seheduled ‘Aglusl Dale
lo ie e ae el
\o.i__[Fonw S submission cai Z “
[6.2__ [EMSD inspection a
(6.3 __ [Form 6 zramted
ly |Sewage Treatment Plant Z
{21 [Plant room handover He al
72___ [Plan instellstion completed is 1
| 1
ff [Swimming Pyol & Equipment Installation
5.2, _ [Equipment installation eompletetion
82. [Brom G & Gu subsiission
83° [From WWO4G submission (From 1) _ | {
{84__]w.A. inspection jee i
gis [Water Certificate Grent
18.4 ISwimming poo! licence granted
2. Form BA 13. 1
19.1___[Sutunisaion |
19.2 [Bp tnapection I