0 ratings0% found this document useful (0 votes) 53 views21 pagesSafety Audit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
_ E Issue No. 2
Engineering Services Safety Audit of — [ Date: 20.10.2006
(Offshore Works Division) Vessel Rev.: 4
ISO 9001:2015 Rey Date:20.09.20243
PRFORMA OF SAFETY AUDIT OF VESSELS
(No editing in the format, Hand filling only)
(1) Name of the Vessel: Year of built:
(2) Project Work: Installation’ Pipe lay/ Hook Up & Accommodation/ Work Boat / Crew Boat/ AHTS/
Supply Vessel/ DSV.
(3) Approved POB. Capacity (Crew +Passenger) 12 + O = \2 persons
Flog sve QUIA soon MMST NO nh GOOLS,
(4) IMO NO.
(5) Type of Vessel: — Self Propelled / Non Propelled.
(©) Approved As per SPS / MODU. ..
(7) Date of inspection.
(8) Location of the vessel.
* (9) Captain / Master of the vessel
(10) Last date of dry dock from.,2:\:2°3
ONGC (Project-ES) ONGC (HSE-ES)_|
MASTER
of VesseV/Barge ‘Master Mariner (TPI)
ONGC (Asset) Safety Officer (CA) | ONGC (Marine Cell) Contractors Rep |OIL AND NATURAL GAS CORPORATION LTD.
PART-A: VESSEL DOCUMENT CHECK LIST
OFFSHORE ENGINEERING SERVICES
SAFETY AUDIT OF VESSEL
NAME OF BARGE / VESSEL: .. DATE OF AUDIT:
SL Certificate Reference ‘Authorised [Annual Validity | Remarks
No. Agency/ Class |Verifleation
Certificate [date
Certificate of class ‘Spee.6001F Pa ae
2 [international Load Line Certificate ‘Spee.6001F- ms fi
Permanent Certificate of Registry ‘Spee. 6001F, See He cae
4 | Authorization for Persons on board MMO
a) Approved GA 4. SOLAS regulation V/14.2
b) Accommodation Plans, b. MLC2006. taumenr — fo2a-2015 | acce-aeay
‘© Safe Manning Documents/Certificate ©. MLC 2006.
4) Vs\/Barge/DP Vsl Particulars
5 | @Anternational Oil Pollution Prevention Re
Certificate (1OPP) es
5) Intemational AIR Pollution Prevention | MARPOL Annex 1 , Regulation 5 , Gee sons
Certificate (IAPP) Gand 7. Mumens [492998 | 30.06.2034
©) Intemational Sewage Pollution Prevention
Certificate (SPP)
§ | Approved Shipboard Oil Potion Emergency | MARPOL Annex 1, Reg 37
Plan (SOPEP) Tes 23.042022 | 20.06 2oy
7") Approved “Tntact Stability Condition | SOLAS Reg AS © WLS
Approved by Class/Flag State NA NA NA
b) Considering Crawler Crane (if on board)
Dama eg) ST
8 | Approved Damage Control Booklet SOLAS Reg TI9, MSC 1G | ae a
9” | Document of compliance (DOG) SOLAS Reg IX 18M Cod, Para ms at Wk
10 | Safety Management Cerificate (SMO) SOLAS Reg IX74,1SM Code 13. WE cE ak
Page No. 2Ti | Safety Construction Certificate (SCC) SOLAS Reg IX/2 ses 33m. 2002 | 3e.0e-a0y
12 | a. Safety Radio Certificate SOLAS 1/I2GMDSS amendment
b. Radio License 1988 Ch V, Radio Reg 18,
International” Telecommunication| 2 &S Jou-er-20a1 | ae. 06.2024
Union Convention.
*13 | Special Purpose Ship (SPS)/MODU Certificate | MSC/Cir 739, SPS Code 2008
(whichever applicable) ISOLAS resolution MSC.38(63)| NF NA NA
2009 MODU Code
+14 | Safety Equipment Certificate (SEQ)— Statement | SOLAS 1/12.
of Fact (Form-E/ Form-F whichever applicable) ERS 24.09.2022] 36-06 2024
415, | Service Certificates of ‘As per LSA Code. aca le
jy Valid Life Rafts om eee ae
») Life Boat me 7etee nt akieniscs
soy Rescue Boat Sos
|\B)Monthly Maintenance record of Life Boat &
Rescue Boat, peer
fanufacturer's certificate of HRUs for Life
oe Cele) | Wisse> egasang
“16 | Valid Fire Fighting Equipment — service| vac foe
ae mee
8 Portable Fire Extinguisher. a) FFA Code, pt sev
‘by Fixed Fire Fighting System in Engine-room|b) FFA Code.
e} Heat & Smoke Sensors/ Fire Alarm System| c) FFA Code. " Jor 0q 2023
4) EEBD (Emergency Escape Breathing | d) LSA Code. ‘i ‘
Device)
e03] 18.08.2004
Apparatus)
D- Monthly Inspection & Maintenance Record
of all Fire Fighting Equipment & System.
*17 | Crane Operator's Competency Certificate | OSHA Crane rule 29CFR
Grade/Level/ handling capacity) Issued by| 1926.1427 sub port. Issuing]
Classification Societies (IACS) National] authority is “An accredited crane] N® NA NA
Commission for the Cert. of Crane & Operator] operator testing organisation.”
(NCCCO)
¥18 | *a) Recent Cranc Load Test Report. 10 152,
*b) Annual thorough visual inspection report ya pe Hh
*c) Class approval in case of Crawler Crane.
Load test~ OSHA 1910.179 (k)
*d) Crane Man-riding,
OSHA ~ ANSI B30-2.0-1967.
Page No. 3*19
‘NDT report of crane boom
a) * MPI
b)_*UT
a) 1L0 152
b)_ 10152
NA
ne
NA
720
*a) 5 Yearly Load test report of Davit for Rescue
boat
b) Names & Competency Certificate of
Persons for Operating Rescue Boat.
+c) Annual thorough inspection report of Davit
for Rescue boat / Life Boat.
LSA Code.
SMRVANS
ENG
Aw oes
03.09.2023
18.03.2024,
“21
‘Annual Inspection / Test Certificate of
a) Load cells.
*b) Winches (Anchor/ Mooring / Pipe) Test of}
Winch is to be witnessed by Class /|
Consulting of Class) LEEA Certified
Inspectors / TPI.
c) Annual anchor wire inspection and breaking
load test certificate.
4) FAT/SAT / Break Holding Capacity Test
of all Winches. (Every 5 years).
©) Monthly Inspection & Maintenance Record
of all Anchor handling Equipment, Towing
Equipment & machineries. (Inspection by
ONGC representative).
g) Anchor Handling Manual / Procedure
h) Towing Manual / Procedure.
i) Emergency Towing Procedure.
TLO 152 & Indian Dock Labour Act.
72
ay Annual Inspection / Test Certificate
of Loose Gears.
+b) Chain.
c) Shackles.
*d) Slings.
**e) Chain Pulley Block.
*) Wire rope Maximum Breaking Load Test]
certificate of all fittings of Towing
Equipment (including Towing _ plates,
shackles, eyes, bridle chain, towing]
bollards).
g) Gangway Installation Procedure.
*h) Register of Lifting Gears (loose Gears).
+i) Monthly Inspection & Maintenance
Record of Loose gears.
ILO 152 & Indian Dock Labour Act.
excee,
TO RRINE
SEQVIERdS
wr.
ure
09.04
2023
08.04
2024
Page No. 4"23
Personal Transfer Basket’s Service Certificate
(Rigid Type) Annual),
Indian Dock Labour Act
HSE and Legislation.
OCMF guidelines for transfer of a7 no NA
personnel (Page 10) Para 3.2
24._| Diving System Safety Certificate. Res A 536(13), section 1.6 NA NA NA
25. | a) Hyperbaric Fast Rescue Boat’s Service | IMCA
Certificate for Saturation Diving System. ne = re
26 |a) Approved Garbage Management Plan. a)MARPOL Annex V, Reg-10
‘by Garbage Record Book .
{Oil Record Book.
27} Recent Drill reports. As per SOLAS, Chapter IT
|) Abandon Ship. Regulation 24 and 15. Chapter | c.g
‘by Fire. Regulation 19, 26 and 30. hI Sees eee
ey Man overboard. Oe Une Srtounsdt| Hooks]
BF Rescue Boat.
ey HDS,
28 Ai ony ‘of Recent Safety Committee Meeting’s asi Per Ship Board approved ISM |
*29 | a) Recently filled copy of work permit system | As per ship board approved ISM
— Hot, Cold, Confined space entry etc. manual.
b) Approved SMS (Safety Management|
System) with Vessel ERP (Emergency|
Response Plan).
30 | Recent Water Portability Sample Test Report ~ | SOLAS RegUii7-1
Chemical test like TDS, TSS, Ph, Turbidity,
Chloride and Total Hardness ete Also} NA ne na
Microbiological test like TVC, Coliforms, E-|
Coli ete.
31 | Recent Sewage Treatment Plant (STP) sample | MARPOL Annex - VI
test report — Minimum parameter like COD, na ne NR
BOD, Suspended solids, Ph, Oil & Grease etc.
32 tose ane / Derat Certificate (by | GOL Pow 31.07.2003 | 28.01.2004
33 | Recent Fumigation Treatment Certificate (by | GOT
Govt. approved agency).
34_| Approved Helideck layout drawing approved by | ACS and CAP 437 a a ne
Classification Society.
Page No. 535 | Cerlificates:-
Helicopter Landing Officer (HLO). ‘As per STCW Regulation
Helicopter Landing Assistant (HLA). ‘As per STCW Regulation Na RA nA
Hielidock Safety nets load test certificate
36 [a) Certificate of MBBS doctor on-board.
bb) Copy of contract for employing doctor. ne oe a
37 | a) Flag State Inspection Report. IMO / Flag state7 MOU'S
b) Third Party Inspection Reports OVID / Ne Nw Na
CMID/ MWs.
38 _ | Recent Noise Survey Report. SOLAS Reg I1-1/3-12
IMO Resolution A.468 (XII)
RESOLUTION MSC.337(91) dated ee ne A
30 Nov 2012.
¥39 | "Intemational Ship Security Certificate and Ship | SOLAS Reg XI-2/9, 1.1 me D
Security Plan (ISPS). rAUMERS Se Dies SLoe
¥40 | *General Trade License issued by DG Shipping, | GO1/ FS
rn " sare. 2016
@1_| Valid of insurance policy for a) Financial Liability GaeRneae
| ac“ Hull & Machinery. ») Financial Liability
br P&L ERRANE
c. Civil Liabilities Certificate for bunker Oil
Pollution Damage.) poo?
a Wreck Removal.
“42__[ International Tonnage Certificate “Tonnage Convention, Aricle7 [mo womens [55-07-31
43] Please confirm that Thuraya Mobile Satellite [ED-Chief security letter no. ae ie
Phone is not used at the barge/Vessel. ONGC/COS/2014 dt 21.04.2014 nS oe
44 | Approved Mooring Analysis by competent ‘ONGC Anchor Handling Policy Ye
agency kept on board.
¥45 | a) Classification Society's Approval of HHP | 01-09-2014
(High Holding Power) Delta flipper Anchors
(Original)
b) Mooring Wire Length Certificate Min. 1000 om ne NA
Mirs as per AHP for Hook Up Barges /AWB
©) MBL/SWL Certificate Winch Wire Annual
Thorough Examination report of Winch
Wire.
Page No. 6*46(a))
Limiting G per Mooring Analysis for|
safe Installation Work (For moored Vessels).
1. Wind Speed.
2. Current Speed,
3. Wave Height.
an
ae
NA
*450b)
Barge Master to take necessary precautionary
measures to ensure safety of barge in case of
weather forecast data exceeds the ‘Limiting
Weather Conditions’
NA
NA
NA
ry
‘Confirm that mooring buoys and Unit drum will
be lit as per standard.
MRVES/MS/Security/2/2014 dt
02.09.2014
NA
Ne
NR
B
‘Covid Prevention-
a) Isolation Facility for Covid-19 Suspect.
b) Pre Boarding/ Sign In / Sign Off procedure,
©) Oxymeter, Ray thermometer, Sanitizers ,
Mask , disinfectant, shields, PPE etc.
available,
@) Vaccination Policy for Covid for Marine
and Project Crew.
Covid Protection as per DGS
Circular dated 20.03.2020
Ne
Ne
NA
‘YES/
49
Bollard pull (BP) required for un-propelied AWB, Certified by MWS / Authorised Agency.
50
‘Name of allocated AHT with BP for the un-propelied AWB.
“si
‘Response Plan for Tropical Cyclone Cyclonic Storm Forecast / Warning.
YES/
Note: 1) * marked documents are critical without which barge / vessel is not allowed to sail.
2) Points which cannot be covered during safety audit, will be verified by ONGC representative during deployment.
3) There will be periodical inspection by marine cell team/OES representative during the deployment to ensure vessel is maintained in proper orde
4) HSE audit checklist is for important points of audit. Physical/ Virtus
all the time,
HSE Audit may be more comprehensive and inclusive to improve safety
Exemptions granted by FSI for safety critical items like SCC, SEQ, DoC, SMC are not acceptable. Ship owners / charterer’s policy / document ar
required duly approved by [ACS / MWS/ Consulting of Class.
Page No.7Er
Engineering Services Part-B
(Offshore Works Division) | Safety Audit of Vessel.
ISO 9001:2015 Physical Verification.
Issue No. 2
Date: 20.10.2006
Rev.: 4
Rey Date:20.09.2021
PART-B: PHYSICAL VERIFICATION
Tobe filled in by vessel owner / contractor and verified by ONGC during vessel audit
3.1 Quantity of life jackets (150% of Approved POB )
3.2 One life jacket per person avs
lable in each cabin?
3.3 Spare life jackets stored in boxes marked “Life Jackets” at
muster stations.
34 Tested and approved by International Standard
3.5 Each Life Jacket fitted with
= Whistle
«# Self igniting light.......
+ Expiry date of batteries
+ Reflectorised Tapes...
+ Stenciled with vessel’s name...
«= Life jackets kept in boxes marked in accommodation
cabins ?
‘= Operating instruction (Donning) are posted on each cabin
door?
YESANO-
YES/NO
YES/NO
st ‘Availability Remarks
ma ToB (Strike out which is | (For Auditor
not applicable) Only)
1.0 | MUSTER STATION:
1.1 Clearly Identified & Marked on the floor (Area 0.35M"per ES
person).
1.2 Location posted on each accommodation cabin door. YESINO
1.3 Bach muster station provided with adequate lighting? YESINO
1.4 Emergency lighting available in each muster station Esme
2.0 | STATION BILL:
2.1 Updated and displayed on each level at all prominent places? ee
2.2 Location posted on each accommodation cabin door.
‘YESINO-
3.0 | LIFEJACKETS:Engineering Services Part-B
(Offshore Works Division) | Safety Audit of Vessel.
Issue No. 2
Date: 20.10.2006
Rev.: 4
: Physical Verification.
ISO 9001:2015 ysical Verificat Rev Date:20.09.2021
ST ‘Availability Remarks
| no REQUIREMENTS (Strike out which is] (For Auditor
not applicable) Only)
[fo SURVIVALCRAFTS: 1x__=
12x
(Life rafts and life boat aes
ife Rafts Details Capacity & Total Qty.
Lifeboat Capacity & Total Qty.
20x_2 = O02-N0S)
25x,
4.1 Aggregate capacity of life rafts & Tol OD
life boats should be 300% of Approved POB.
4.2 Ftted with certified hydrostatic release system. om
| 43 1 reseue boat available ae
| 4.4 Type of rescue boat (rigid or inflatable)
| 4.5 Class approval (Incase Zodiac is additional to rescue boat) Y¥ESINO |
| as abere Cortconas smb se boeede See a|
|
LIFEBUOYS/ILIFERINGS:
5.1 At least 8/12/18 units on board for vessel length les than 60
rte / 60-120 mtr/120-180 mtr, YESINO
| 5.2 Atleast 4 cach fitted with sel igniting lights, Esme
5.3 Atleast 2 each fitted with buoyant line. ve
5.4 At least two each fitted with MOB.
(Gelf igniting and smoke activating) po
FIRESTATIONS:
6.1. Stations appropriately marked YESINO-
(oe. Fire Station)
62. Station complete with
a) Fire Hosea. ese
b) Jet/ Spray combination nozZle.an YESINO
©) Spanners. YESINO
63. Hydrant valve easly operable. YESINO-
511 Guled couse: hpireae Ss hase eoni nee? YESINO
64 Hose & hydrant line working pressure not less than 100
PSI/7 kg fem square ? YESINO
65. Unobstructed nnn Caan
6.6 Hoses tidy?.. YES/NO
6:7 Atleast two spare hoses 4 YESINO™Engineering Services Part-B
(Offshore Works Division) | Safety Audit of Vessel.
Issue No. 2
Date: 20.10.2006
y : Rey. 4
1SO 9001:2015 Physical Verification.
y Rey Date:20.09.2021
SI ‘Availability: Remarks |
10 REQUIREMENTS (Strike out which is | For Auditor |
not applicable) Only)
70] FIRE FIGHTING GEAR:
7A. Atleast two (2) sets available containing the followin.
1 fire helmet, ae
1 tune pant. =
1 patr gloves. YESINO
Minima 30 te se conan BA wih pare inde aie
1 explosion proof fash lights aes
1 crow bar, ae
1 fire axe. YESINO
1 Heavy duty cutter. Sane
Life Line of 30 mtrs length (Material-SS with insulation ) ea
BA Board for the BA controller YESINO
72 List of above equipment posted on ts cabinet/ container? eee
7.3 One (1) each fire axe near fire stations or with in
accommodation area? YESINO
7A Atleast two nos offre blankets atthe kitchen located near
cooking range? vEsNe
7.8 Are smoke sensor provided inside the bunk? YESINO
116 Are water sprinkler system provided in the bunks? YESINO
30 | FIREPUMP:
8.1 Main pump In good operating condition
8.2 Can deliver at least 25M/ hr (110 gallons per minute)
= Discharge rate...
+ Discharge Pressure.
8.3, Date of the last testing
8.4. Emergency back up fire pump available
‘© Discharge rate.
+ Discharge Pressure.
85 Date of last testing
8.6 Whether PRY fitted in fire main system?
8.6.1 What is the pop up set pressure?
seveeendegfem2,Engineering Services Part-B
(Offshore Works Division) | Safety Audit of Vessel.
Issue No. 2
Rev.: 4
Date: 20.10.2006
ISO 9001:2015 Physical Verification, |Rev-id __|
= y Rev Date:20,09.2021
a ‘Avallabiliey Remarks
ra REQUIREMENTS (Strike out which isnot | (For Auditor
applicable) Only)
90 FIRE EXTINGUISHERS :
9.1 All fire extinguishers properly deployed and accesible
sccording tothe ves’ efety plan? YESINO
9.2 Date of last inspection.
9.3 Have operating instructions clearly visible? Dt. AMsOA2.2223
9.4 Seals and inspection tags (if any) still intact? aes ee,
. YESINO
9.5 CO2/ Halon system Installed in engine room? YES/NO
9.51 CO2/ Halon activation warning light fited in engine room ae
9.6 Last date of inspection. ee Beh hen Uacisa
9:7 Foam type fire extinguisher available ae
9.74 Capacity 2nd NOS nn
Pr eae Lt. No.
9.8 Spare units of fire extinguishers available? YESINO.
99. Five Fighting eytem in Engine room. YESINO
100 | BOARDING GEARS:
10.1 Sound Gangway with railing. on
102 Free oe
from oil & grease. YESING-
103. Wolanding from pecgyay melee ee
se! ee el YES/NO
10.4 Gangway net is available & secured? YESINO
10.5 Rigid Personal Transfer Basket ‘¥ES/NO_
10551 Nos. of Transfer Basket available.
10.52 Last date of inspection wmnnnenenne
10.5.3 Additional lifting belt attached to the PTB lifting eye?
10.54 Safety sling connected with PTB?
10 | EMERGENCY SIGNALING EQUIPMENT ©
COMMUNICATIO’
11.1 At least one EPIRB (emergency position indicating
radio beacon)
11.2 One set of pyrotechnics contained in metal box located
in dry and easily accessible location?
‘+ Twelve (12) handheld flares.
‘+ Twelve (12) Rocket parachute flares
+ Six (6) buoyant smoke signals...
YESNO,
YESINO
YESINO
YES/NO
YES/INO-Engineering Services Part-B tssue No. a aa
(Offshore Works Division) | Safety Audit of Vessel. [Rey 4
1SO 9001:2015 Physical Verification, | Re o5 pp z0n1
= Availability Remarks
3 REQUIREMENTS (Strike out which s not | (For Auditor
applicable) Only)
11.3 Emergency sound Signaling equipment for Fire / Abandon] YES/NO
ship (General alarm bell & whistle) in good working|
tandition?
11.4 Radar Transponder (SART) avalable as per approval Ne
from authorities? Total qty
11.5 Radio system (SSB) in working condition? YESING-
10 | LINE THROWING APPARATUS:
12.1 At least four (4) units onboard YES/NO.
122 Stored in an easily accessible dry location? ae
12.21 Ready to operate in an Emergency? ——
13:0] PPE (PERSONAL PROTECTIVE EQUIPMENT):
[Are suicient stock avallable for
13:1 Chemical gloves. peared
13.2 Cavern itmrenn are
133 Bar Plags/ Mf ae
134 Face shield for welding saa
YESINO
YESINO
YESINO
YESINO
yESINO
ust ae mace vase
1813 Welder chet YEsNo
1344 Welding Mask eeu
YES/NO:
YES/NO:
YESINOIssue No. 2
Engineering Services Part-B TREO
(Offshore Works Division) Safety Audit of Vessel. Rev = 4 =
1SO 9001:2015 Physical Verification. Ei
2 Rey Date:20.09.2021
st ‘Availability ‘Remarks (For
no REQUIREMENTS (Strike out which is not | Auditor Only)
applicable)
150} ELECTRICAL EQUIPMENTS:
‘14.1 Appliances earthed’ YES/NO
142. Lightlng rtures provided with covers? yes /0
1s Hacc wives ere) ace Yes/No
144 Welding cables without lacerations YES /No
145 Non conductive lor mats provided in ron ofeach electrical :
panels and machineries ? eee
146 Is electrical Insulation level monitoring devices provided oars
(not exceed 30mA) or ELCB fitted in galley appliances |
(Hotplates & Ovens)?
15.0 | FLOORS, PASSAGE AND STAIRS:
15.1 Unobstructe YES / NO-
15.2 Stair steps Well litermonne YES / NO
15.3 Spill oil or other contamination cleaned up? =
Tecapeleaine! andl Goore( cle efor fed femal seat
YES /.50
luminous Sign?
: ae YES /x0-
Barriers provided around openings in the floors and Decks. YES/NO
ard rails on walk ways platforms and deck complete? ae aoe
15.7 Doors not blocked? ine
15.8 Gratings on the walkways not los YES /NO-
15.9 Free from tripping hazard?
15.10 Materials stored in proper places..... us ‘YES / 3@
15.11 Water tight door seals & locks in good condition? YES /-N@
15.12 Inside alarm available in freezer & Chillar. oh
13 Galley range exhaust fan fitted and filters clean (working Uae
effectively)
Ta | CRANES AND LIFTING GEARS:
16.1 Are all lifting equipments / gears marked with SWL (Safe YESING
Working Load)
162. Are test certiflates availabe for al items of lifting gears YESING-
aod equipiiests?
163 Are al lifting gears identified? vesNo
16A Are lfting gears regulary checked for damage wear and YESING
tear?
+ Date of ast checking. [reser
165 Arelifting genre properly ed? YESING-
16.6 Are hooks fitted with safety lath YESINO
167 Arehooks regularly examine? YESINO
168 Whether SWL marked near Eyeball on crane boom? YES/NO”
169 Are shackle plns ket with originals shackle? YESINO
16.10 Are cross byclips being used. YES/INO-Engineering Services Part-B
(Offshore Works Division) | Safety Audit of Vessel.
[Issue No. 2
Date: 20.10.2006
Rev.: 4
ISO 9001:2015 Physical Verification.
s YY Rev Date:20,09.2021
a Avalablty Rear
5 REQUIREMENTS (Strike out which isnot | (For Auditor
aplcable) Only)
TGA Are First Grips elng used? YESINO
1642 Areitems10 &11 above ited properly? YESINO
16,13 Is packing being used in sharp cornered
eer ee P YES/NO
16.14 Are valid cranes Certificates available?
ve
is nee eee eee YESNO
+ Date of last test performed? =
16.181 Are limit switches provided with boom? Sear
16.16 Have all Safety Devices been tested? wee VigNG
+ By whom (Agency’sname)
2 Date of Test De
= Next due dat Br
16.17 Do Cranes have:
+ A maintenance Loghook & Monthly Inspection & YESINO
Maintenance Record of Crane.
+ Avweeliy record of inspection. ’
ESNO
'* Daily inspection report (may be visual) yang
+ Aninentoryofesiment pare ene.
Ae thin orden SNe
+ Load chart at cabin’. eae
16.18 Is the lifting gear colour coved for the certifieate ao,
expiry purposes?
16.19 What colour is currently valid!
a function test been performed on:
a) Load Indieators?.
D) Limit switches? on.
©) Date of ast test?.
4) Crane communication equipments Available?.nm
16.21 Have certificates for the following been checked?
Chain Pulley Block... :
+ Any appliance with a Lifting eapacity over one Ton
1622 Are Davit for rescue boats provided.
YES/NO
YES/NO
YES/NO
YES/NO
YES/NO
YES/NO
YES/NO
YES/NO
YES/NO1 ‘4 ‘. Issue No. 2
Engineering Services Part-B TET ROnUROTG
(Offshore Works Division) | Safety Audit of Vessel. | Rog
ISO 9001:2015 Physical Verification.
z Rev Date:20.09.2021
a Availablity Remarks
5 REQUIREMENTS (Strike out which isnot | (For Auditor
‘pplicable) Only)
1623. Ave Certificates in Order ?orancavomon peal
16.24 Is SWL clearly marked on the above item? nO
1625 Are function tests performed on
| + Deck Winche: YESINO
YESINO
YESINO
| vEs~No
+ Are those in order? ——*
16.27 Crane Operator’s Cabin Comfort.
+ Fire extinguisher in cabi pear
+ First Aid Box in cabin. YES/NO
‘+ Proper light arrangement on boom and operator’s cabin YES/NO
1629, Are crane operating instructions available in cabin. YESNO
16.30 Valid Competency certificate of crane operator. aN
(indicating Grade/ Level / Load handling capacity) .
16.31 Operator beable to understand
+ Hand signal YESINO
eibalcaar me YESINO
16.32 Communication System of crane operator cabin? Teen!
170] GASBOTTLES&HOSES:
17d. Are Gas bottles secured in a £80k wm YESINO
17.2 Oxygen bottles are separated from acetylene bottles? YES/NO
17.3 Provided with protective cap oe YES/NO
174 Flash back arrestors (both ends) for gas eutting equipment YESINO
provided?
175 Gas hoses and fittings without leak? YESINO
176 Oxygen hoses free of il and grease YESINO
17.7 Hoses properly rolled up?.. sevnnnasonnes
YESINO. Issue No. 2
Engineering Services Part-B oe
(Offshore Works Division) | Safety Audit of Vessel. -Rovs g
ISO 9001:2015 Physical Verification. ev
Rey Date:20.09.2021
st ‘Availability (Strike out | Remarks
no REQUIREMENTS Which isnot applicable) | (For Auditor
Only)
180 HELIDECK:
18.1 Design to prevent outflow of spilt oi YESINO
(ie low Kerbs, gutters etc)
18.2, Surface covered with a nonskid deck?. SEANO
18.3. Fitted with tie down points’ foe ey
18.4 Af least one wind sock in good condition & ESINO:
provided within built lighting arrangement? ‘
185 Its perimeter provided with lights as per FESINO,
CAP«372 a
18.6 Is crash kit provided as per CAP437?. YES/NO
187 Is there an anemometer?. YESINO
18.8 Equipped with foam guns?. YES/NO
18.9 Equipped with dry chemical powder?. SENG)
18.10 Equipped with CO> fire extinguishers? YES/NO
18.11 Are the following equipment available in a box (crash
kit) closed to Helideck?
+ Axes s YESINO
. YES/NO
. YES/NO
. YES/NO
. YES/NO
© Hammer... YES/NO
+ H.L.Ovest (one each). YES/NO
+ Fire suits (ovo sets). YESINO
«Ear Muffs (four pairs). YES/NO
+ Torch (one pai YES/NO
+ Ropes (one pair) z YES/NO
18.12 Are fire alarm equipment available:
18.13 Provided with signs? YES/NO
18.14 Vessel / Barge Identificatio YES/NO
18.15 Helipad drawing with Dimension & Tonnage values YES/NO
provided? YES/NO
18.16 Free of any Elevated Obstruction. YES/NO
18.17 Helideck peripheri net in good condit YES/NO
18.18 Helideck Safety net in good condition? YESINO
19.0 | MOCK DRILLS: af
Al drills recorded with response time, POB, Nos of attendees Ese
& No. of persons on emergency duty?
+ Date of lst Abandon Ship dri a
= Date of last fire drill, Date ..AY.4:28
‘+ Date off ast Manover board drill.. Date....SER.28>%
'* Date of last rescue boat drill.. ener acs
* Date of last H2S drill....sssssssssemeneere, peeEngineering Services Part-B
(Offshore Works Division) | Safety Audit of Vessel.
Issue No. 2
Date: 20.10.2006
7 m9 Rev.: 4
1SO 9001:2015 Physical Verification.
2 Rey Date:20,09,2021
SI Availability (Strike out Remarks
Bt REQUIREMENTS ‘which is not applicable) | (For Auditor
‘Only)
20.0| HEALTH&HYGTENE
20.1 Recent water potability test certificate available? YESINO
202 Recent De-rattng / fumigation certifieate availabe, YESINO
20:3 Clean accommodation:
: YESINO
: YESINO
+ Clean fod storage YESINO
204 Expired food items disposed? Sa
20-5 ocx x Jat md tetera
rst ald kit and stretcher a
20.6 Freezer equipped with emergency alarm / bell in working
condition and audible esough? es:
20:7 Drainage syste not logged wpe ane
208 Toilet bow is clean and flush workin yESINE-
20.9 Drinking outlet identified clearly.
YESINE
20.10 Oxygen resuscitator/ respirator available YESING
20.11 Medical stretcher ayailablewnne YESING
20.12, Whether regular medic posted.......
ae 2 YESINO
2043 Whether life saving medicine available? YESINO
2014 Whether Glucometer, Nebulizer, Defibrillator ete es
available?
20,15 Whether the general house-keeping is good, TEaNe
20.16 Physically the heat/ smoke and fire detector of control
‘room engine room and galley were tested and was found YES/INO-
iniwarking Gadion!
21.0 | LIVING QUARTERS:
YESINO
Ai eieeteectan rscke mere ety ee ese! oe een YESINO
found OK.
YESINO
21.3 Whether life jackets with lights and RR tapes were available
in the rooms,
21k Areiamttrosses und paige elon YESINO=Sey ; Issue No. 2
Engineering Services ] Part-B DETRDUNEODe
(Offshore Works Division) | Safety Audit of Vessel. | Rog
1SO 9001:2015 Physical Verification. ie
Z Rev Date:20.09.2021
sr aa | Availability aa?
a REQUIREMENTS | (Strike out which is eee
trike ont nen | (For Autor ny)
7.0] SAFETY COMMITTEE:
‘Whether regular safety meetings are being YEsno-
conducted?
330] WORK PERMIT SYSTEM: D) Hot work
) Cold Work
23.1 Whether permit to work system exists on the barge and is Syme: © | Caner
being followed. entry with entry
23.2 Whether job safety analysis & regular safety inspections YESINO" roster and gas
are being done. record at
regular
interval
340_| WASTE MANAGEMENT:
24.1 Whether the sewage is being treated prior to disposal into the | YES/NO:
sea as per MARPOL?.
242 Recent STP sample test report available? YES/NO
243. Whether the garbage is heing segregated in dry and wet| YES/NO
type as per GM Plan?
24.4 Whether the garbage record book & manifest are being YES/NO
maintained as per MARPOL?
245 Whether the Ol fitering equipment is available as per | YESINO
MARPOL?
246 Whether the Oil record book & manifest are being) YES/NO
maintained as per MARPOL?
24.7 Whether Approved Shipboard Oil Pollution veite
Emergency plan available as per MARPOL?
25.0 | TRAINING:
25.1 Whether the record of training particularly on sea survival] YES/N@r
Fire Fighting and First Aids properly maintained as pei
sTCw' 2010
25.2 Competency certificate of Captain & crew available? ae
25.3 Manning as per SMC / Manning Policy document available? ‘YES/NO
260 | MOORING WINCHES 7 ANCHOR WIRES 7 TOWING
SYSTEM:
26.1 Are all winches operational ? SESING)
| 26.2 Remote operation of winches from control room available? YESINO
26.3 Anchor wires lubricated & maintained properly? YESINO-Issue No. 2
Engineering Services Part-B
; Date: 20.10.2006
(Offshore Works Safety Audit of Vessel.
ISO 9001:2015 Physical Verification.
st ‘Availability
no REQUIREMENTS (Strike out which is | (For Auditor
not applicable) Only)
264 Latest Thorough examination! Inspection of winches & ¥ESINO
Wires available < 12 Months ?
26.5 Are all Load & Wire length indicators oeprational ? YESINO
26.6. Are all load cells calibrated? YESINO
26.7 Are MBL test reports (<5 Years ) of all anchor wires ‘YESINO
available?
268 FAT /SAT/ Break Holding Capacity test of all winch “¥ESINO
assemblies available (attach certificate)?
26.9 Are MBL test report of Main tow wire & emergency tow ‘YESINO
wire available?
26.10 Test certificate of all towing gears available? ¥ESINO
26.11 Barge Anchor Handling Manual / Procedure available? ‘YESINO
26.12 Barge Towing Manual / Procedure available? -¥ESINO
26.13 Barge Emergency Towing Manual / Procedure “¥ESINO
available?
26.14 Display of Emergency contact nos. list of contractor ¥ESINO
& ONGC persons? (Must be provided by contractor)
26.15 Register contai - and a a
5 Resite contalning Phone no. and addreees of marae mane
26.16 Is record of breakdown of equipment maintained?
-¥ES/NO
26.17 If yes, i 2
f yes, informed to Class (Copy of letter) Ean
26.18 AIS Working, Antenna and Display OK & Crew Fam
with AIS & Data Updates. ee
27.0_| OTHERS:
27.1 Safety plan (barge layout plan) updated, approved and YES/NO
posted in conspicuous area ?
27.2 Spark arrestors on exhaust pipes and other internal “YES / NO
‘engines installed?
27.3 Anchors Wire length is as per ONGC’s Anchor Handling YES/NO
Policy - 2011? minimum anchor wire length be 1000
meters for H/U Barges.; Issue No. 2
ering Services Part-B PTTeNOHeTS I
(Offshore Works Division) | Safety Audit of Vessel. | Pate! 20-10:
1SO 9001:2015 Physical Verification. e
Z Rey Date:20,09.2021
a Avallablly Girike | Remarks
= REQUIREMENTS. ‘out which is not (For Auditor
escta Only)
7A Ave anchor securing arrangements In good condions 7 YES/NO
| 27.5 Are Original HHP (High Holding Power) Delta Flipper Xs.) NO
snchors provided?
27.6 DMP/ RCP/ SOP/Safety Management System document ¥B8 / NO
for Vessel avalablity?
27:1 Safety, Environment policy displayed at prominent YES /NO-
places?
27.8 Drug & Alcohol poliey displayed at prominent places? YES | NO-
279 Posters on Fire / Safety / Environment displayed? YES | Nov
27.10 Approved project based HSE Manual? Available On YES / NO
Vessel?
Nate:- Following Critical valid documents ~ Must be submitted before Safety audit & without these documents,
vessel / barge will not be allowed to sail to the field:-
1. International Pollution prevention certificate (IOPP, IAPP & ISPP) 2. Shipboard Oil Pollution Emergency Plan
3. Special Purpose Ship (SPS) / MODU Certificate (which ever applicable) 4, Safety Equipment certificate ~
Statement of Fact (Form - E or Form - F which ever applicable) 5. Valid life raft /life boats service certificates 6.
Valid firefighting equipment service certificates 7. Recent Crane load test report & Annual thorough visual
inspection report 8, NDT report of crane boom (MPI & UT) 9. Annual Inspection / Test certificates of Load cells,
winches (Anchor / Mooring / Pipe) & Wire length certificate 10. Annual Inspection/Test certificates of Loose Gears
(Chain, Shackle, Sling, chain Pulley block, Wire Rope, Gangway etc.) 11. Personal Transfer Basket Service
Certificate.
SAGAR - 5
— PEs
MASTER
of Vessel/Barge Master Mariner (Pi
ONGC (Project-ES) ONGC (HISE-ES)
ONGC (Asset) Safety Officer (CA)_| ONGC (Marine Cell) Contractors Rep.Barge/ Vessel Safety Audit of ...
Engineering Services
(Offshore Works Division)
ISO 9001:2015
GARR.
Safety Audit of Vessel.
Physical Verification.
Issue No. 2
Part-B
Date: 20.10.2006
Rey.: 4
Date:
Rey Date:20.09.2021
1 12023
Primary Observations (Final observations will be issued for compliance report):-
SAGAR-S
MASTER
“Aptain/ Master
of Vessel/Barge
Master Mariner (IPI)
ONGC (Project-ES)
ONGC (HSE-ES)
ONGC (Asset)
Safety Officer (CA)
ONGC (Marine Cell)
Contractors Rep