INTERNAL TEST REPORT
(FOR 160 KVA, 3 PHASE MANUAL D.G SET)
DATE OF TEST: 07.06.2023
Project Name: Supply of 160 KVA Liquid Cooled 3 Phase DG Set with Manual Control Panel.
2. ENGINE DETAILS:-
ENGINE MODEL ENGINE MAKE SR.NO. BHP RPM
6K1080TA G2 KIRLOSKAR 6H.8419/2320013 200 1500
3. ALTERNATOR DETAILS:-
ALTERNATOR M/C NO. RATED VOLTS RATED AMPS PHASE
160 KVA KG LCS3H23D18570 415 222.6 3
FREQUENCY P.F. AMB TEMP(deg C)
50 0.8 40
4. LOAD TEST (AT 0.8 pf)
Sl. %age CURENT In AMPS VOLTAGE HZ RPM WT(de LOP in Time
No. Load R Y B RY YB BR g C) Bar Interval
min
1 0 0 0 0 415 415 415 50 1500 51 6.1 10
2 25 56 56 57 414 415 415 50 1500 55 5.8 10
3 50 111 112 112 414 415 415 50 1500 56 5.4 20
4 75 166 166 167 415 414 414 50 1500 58 5.1 20
5 100 222 223 222 415 414 414 50 1500 59 4.8 30
6 110 244 244 244 414 414 414 50 1500 68 4.7 30
5. REGULATION TEST:-
5.1 Voltage Regulation VR = (VNL - VFL) / VFL = 0.24%
5.2 Speed Regulation % NR = (NNL - NFL) / NFL = 0%
5.3 Frequency Regulation: % FR = (FNL - FFL) / FFL = 0 %
5.4 Noise Level Test: (At full Load): 74 dBm
FOR ELMECH ENGINEERS . .
(Manufacturer)
Page 1 of 1
6. Checked the various functions of the DG set as per standard procedure
Sl. No. Requirements Observations
1. Checked the various functions of the DG Set. Observed & Found
satisfactory
2 Checked the Panel operation Observed & Found
satisfactory
3 Checked Visual annunciation for DG set shutdown Observed & Found
satisfactory
FOR ELMECH ENGINEERS . .
(Manufacturer)
Page 2 of 1