0% found this document useful (0 votes)
57 views1 page

Estimation For Massra Warehouse

Uploaded by

kevin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

Estimation For Massra Warehouse

Uploaded by

kevin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Massra Warehouse

[Link] Description Qty Units Actual Rate 10% Profit Amount


1 Supply and Fixing of 40 W Tube light 2 Nos 10.00 11.00 22.00
Supply and Fixing of Drain Heater For
2 1 Nos 165.00 181.50 181.50
the cold room
Applying Spray paint inside tube light
3 1 Nos 5.00 5.50 5.50
frame
4 Labour Charge 1 L/s 200.00 220.00 220.00
Total Price 429.00
Add: Vat @ 5% 21.45
Total Price Inclusive of Vat 450.45

You might also like