This flow chart provides guidance for determining when to report a near miss involving excavation activities near underground pipelines or other buried facilities. It outlines 7 key questions to consider, such as whether there was contact with the pipeline, non-compliance with damage prevention procedures, or mechanized digging within 25 feet of the pipeline centerline. Depending on the answers, the incident may be considered a non-critical near miss, critical near miss, or not a near miss.

Uploaded by

judsonlob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
378 views1 page

API Near Miss Flow Chart FINAL

This flow chart provides guidance for determining when to report a near miss involving excavation activities near underground pipelines or other buried facilities. It outlines 7 key questions to consider, such as whether there was contact with the pipeline, non-compliance with damage prevention procedures, or mechanized digging within 25 feet of the pipeline centerline. Depending on the answers, the incident may be considered a non-critical near miss, critical near miss, or not a near miss.

Uploaded by

judsonlob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

When to Report a Near Miss Flow Chart

For detailed instructions refer to: Excavation Near Miss Reporting Guidelines

Contact w/pipe
Unauthorized Action or facility, including
Occurs
Yes
coating damage?
Yes Hit
Node 1 Task A

No

Was there
non-compliance with a
Damage Prevention
Procedure?
Node
Node 22

No

Unauthorized
Was the
excavation w/in 50' of
action hand digging? Yes No
centerline (CL)? Yes
Node 5
Node 5
Node
Node33

Was this
No a significant non-
Yes excavation event?
Node
Node 44
Did
mechanized
digging occur on Yes
ROW or w/in 25' CL? No
Node 6
Node 6
No
Yes

Is there Not a Near Miss


a barrier between Task D
Yes
Non-Critical activity & pipeline?
Node 77
Near Miss Node
Task C

No Critical Near Miss


Task B