Project management
Teams are required to formulate a project management strategy, clearly delineating
responsibilities among team members. The particulars should be presented, preferably in a
tabular format as demonstrated here. Additionally, it should encompass schedule and budgetary
requirements (Note: The example below is provided for reference and does not need to be
followed in the same format).
Main Secondary
Deadline for Estimated
No. Task Responsibilit Responsibilit
Completion Cost
y y
Hardware HARSH Sensor
1 15-01-2024 90,000
Procurement VERMA Procurement
Research
RITU Finalize
2 Rover Design -
VERMA Rover Design
Options
Software SAMRIDDH Software
3 -
Augmentation PATHELA Integration
Research
KUMAR
Software Software
4 KARTIKEY -
Frameworks Architecture
PANDEY
and Libraries
Choose KUMAR Develop
5 Software KARTIKEY - Rover
Architecture PANDEY Software
Develop
Rover
6 -
Software
Design
Implement
7 Rover Control -
Algorithms
Implement
8 Sensor -
Integration
Debug and
PALAK
Optimize Sensor
9 SRIVASTAV -
Software Integration
A
Performance
Conduct
Software HITAISHI Rover Sensor
10 -
Integration SINGH Technologies
Testing
11 Test Rover ATIN -
Movement
and Basic SHARMA
Functions
Integrate
ATIN
12 Sensors and -
SHARMA
Actuators
Implement ATIN
13 15,000
Power System SHARMA
Finalize
Rover RITU
14 -
Hardware VERMA
Design
Research and
Select Rover HITAISHI
15 -
Sensor SINGH
Technologies
Design
PALAK
Sensor
16 SRIVASTAV -
Integration
A
with Rover
Procure
HARSH
17 Sensor 70,000
VERMA
Components
Integrate
Sensors with ATIN
18 -
Rover SHARMA
Electronics
Test Sensor
Functionality ATIN
19 -
and SHARMA
Calibration
Implement
KUMAR
Data
20 KARTIKEY -
Processing for
PANDEY
Sensor Data
Test Sensor
ATIN
21 Integration -
SHARMA
with Software
Implement PALAK
22 Sensor Fusion SRIVASTAV -
Algorithms A
Optimize
Sensor
HARSH
23 Placement -
VERMA
and
Configuration
Finalize
RITU
24 Rover Sensor -
VERMA
Design