Combined Layout New
Combined Layout New
Engineer:
Main contractor:
Sub-contractor:
Key Plan
CH
PROJECT
NORTH
TRUE
NORTH
QUIBLA
203
203 205 207 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227
227.a
228 229 230 231 232232.a233.a
233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266
378550
12000 12000 12000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6550 6000 6000
252 253 254 255 256 257 258 259 260 261 262 263 264 265 266
236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251
AD
AD
NF15 NF15
AD AD AD
5
EFSO
5
B.O.F.= +0.000
B.O.F.= +0.000
EL ROOM
EL ROOM
NF32 NF32
STAIR 07 STAIR 06
TO DWG NO.1503-2OF4
MATCH LINE
221 222 223 224 225 226 227 227.a 228 229 230 231 232 232.a 233 233.a234 235
MATCH LINE
B.O.F.= +0.000 B.O.F.= +0.000
5 5
NF16 NF16 NF7 NF7 NF7 NF7
5 5
STAIR 09 STAIR 08
EFSO
AE
TO DWG NO.1503-4OF4
TO DWG NO.1503-3OF4
MATCH LINE
MATCH LINE
FOR CONTINUATION REFER
TO DWG NO.1503-1OF4
MATCH LINE
CORRIDOR
GSE ROAD - REFER TO TR DWGS
205 207 209 210 211 212 213 214 215 216 217 218 219 220
20785
AE-1
FOR CONTINUATION REFER
COBUS 3000APX COBUS 3000APX COBUS 3000APX COBUS 3000APX COBUS 3000APX
TO DWG NO.1503-2OF4
NF34 NF34
MATCH LINE
NF29
FOOTPATH - REFER TO TR DWGS
NF2 NF2
NF29
NF25 NF2 NF2 NF25
NF29
NF23
AE-2
AE-2 AE-2 AE-2
1200 mm
THICK RAFT
AE-2 OFFICE 01 OFFICE 03
13 13
REFER SHEET 3502
Sewage well
AE-2
NOVEC
CLOSET
NOVEC
CLOSET
NOVEC
CLOSET
NOVEC
CLOSET
NOVEC
CLOSET
NOVEC
CLOSET
NOVEC
CLOSET Sewage well
-2.700
BOTTOM OF
AF
FOOTING
AF AF AF EL ROOM
4
FD ROOM AF AIRLOCK
LOBBY
AIRLOCK
LOBBY
AIRLOCK
LOBBY
AF
AIRLOCK
LOBBY
EXISTING UTILITY TUNNEL
1000mm S.1
OFFICE 02 5
Sewage well FD ROOM
6495
F&B
17205
BOTTOM OF ELEC-MH AF-2
MALE TOILET ELEC-CAB ELEC-MH AF-2
AF-2
ELEC-CAB ELEC-CAB ELEC-CAB ELEC-CAB
4 4 ELEC-CAB
AF3
FOOTING
AF-2 AF-2 Con
AF3 cret
e enc
AF3 MALE TOILET FEMALE ELEC-CAB ELEC-CAB ELEC-CAB ELEC-CAB
AF3 AF3 Water-MH aps
ETS ROOM CONTROL MECHANICAL ulat
ion Power
TOILET well ELEC-MH
ROOM JC
LEGEND:
ROOM Water pipe
BUS LOUNGE BUS LOUNGE
AF3
103925
Water line
MECHANICAL well
Water line
B.O.F.= -4.100 B.O.F.= -3.500 B.O.F.= -2.700 B.O.F.= -2.100
Water pipe
F1
FEMALE 900 mm
7
S.1 Water line B.O.F.= +0.000
PRM MALE Water line B.O.F.= +0.000
Water line
well
B.O.F.= -4.700 1200 mm 1200 mm
TOILET
THICK RAFT B.O.F.= +0.000
ME SHAFT TOILET ROOM
Water line
9095
STAIR 03
800 mm
STAIR
NF21
05
600 mm
PEDESTAL -5.400 PEDESTAL -5.400 PEDESTAL -5.000 PEDESTAL -4.600 PEDESTAL -3.600
C.L. THICK RAFT
STAIR 02 C.L. B.O.F.= +0.000
THICK RAFT
B.O.F.= +0.000
B.O.F.= +0.000 B.O.F.= +0.000 B.O.F.= +0.000 B.O.F.= +0.000 STAIR 04 THICK RAFT Water line B.O.F.= +0.000
THICK RAFT
B.O.F.= -7.150
1 EXISTING RETAINING WALL -0.400
ROOM PARTIALY DEMOLISHED +0.000
High pole lamp +0.000 B.O.F.= +0.000
High pole lamp +0.000
AF7
AF7 AF7 AF7 3502
C1 C1
1200mm
THICK RAFT
1200 mm
THICK RAFT
AF7
1000 mm
THICK RAFT
+0.100
1000 mm
THICK RAFT
+0.100
1000 mm
THICK RAFT
+0.100
C.
L.=
+0
.93
0
Co
nc
re
te
AF7 B.O.F. - BOTTOM OF FOOTING
en
AG
BOTTOM OF FOOTING
F1
AG
FOOTING 0
向上 pipe
AG AG 1200 mm
pipe
pipe AG AG
wellTHICK RAFT
1200 mm
well FOUNDATION FOUNDATION well
well
T.O.C. - TOP OF COLUMN
-4.700 THICK RAFT
TRANSITION TRANSITION FOUNDATION
5195
BOTTOM OF TRANSITION
FOOTING -4.100
BOTTOM OF FOUNDATION
FOOTING
7 TRANSITION
AG2
1
AG2
S.1
70
AG2 B.O.F.= -0.38 B.O.F.= -0.41 B.O.F.= -0.14 AG2 FOOTING FOOTING AG2 AG2
615.983
H1
AG-3
C.L.= +0.870 C.L.= +0.840 C.L.= +0.860 C.L.= +0.860 GB7A GB8 GB9 GB10
AG-3 39
Concrete encapsulation
C.L.= +1.320
Concrete encapsulation
LOCKER ROOM,
Concrete encapsulation
Concrete encapsulation
THICK RAFT
SLOPE 1200 mm -3.600
C.L. C.L.
1200 mm C.L.= +0.470 B.O.F.= -0.52
Concrete encapsulation
9 9 BELOW
2 DETAIL `A'
15590
OFFICE D1 D2 E1
GB4
GB17
(3501-4OF5)
GB
EXISTING ME
GB4
GB12
GB4
GB4
C.L.= +0.390
B.O.F.= -0.41 CONFERENCE
GB4
EXHAUST
AG7 3503
1200 mm
THICK RAFT
FROM DEP
Fire well ELEVATOR
Fire well Fire well
GB12A
GB12
GB12
GB12
GB13
C.L.= -0.419
BELOW STORE
Telecom
VAR. B.O.F.= -3.600
8A OFFICE
C.L. ABLUTION
Water pipe
AG7
RING WALL 2
B.O.F.= -3.600 B.O.F.= -3.600
ABOVE B.O.F.= -6.500 NF6 S.2 B.O.F.= -3.600 ZV CLOSET B.O.F.= -3.600
GB15
AG7 AG7
G1 1100 mm
Telecom
THICK RAFT
Fire water
NF25 -6.500
AH
BOTTOM OF 800 mm
AH
4545 650
AH
3
MV cable FOOTING THICK RAFT
Telecom Water pipe AH
-3.600
BOTTOM OF
2
S.1
CCH-EL-P-01 FOOTING
STAFF JC
S.1
NEW TRENCH
AH1
Telecom AH1
TOILET
300
900
G1
4000
AH1 51205
Reference:
900
AH2
800 mm 800 mm 800 mm 800 mm 800 mm 800 mm ELECTRICAL TRENCH 2 X 800 mm 800 mm 3500 NEW DUCT BANK-T3-T4 4000
THICK RAFT THICK RAFT THICK RAFT THICK RAFT
THICK RAFT THICK RAFT THICK RAFT THICK RAFT
1.6M INTERNAL (8Ø160mm uPVC SLEEVES FOR
AH2
-8.000 -8.000 -8.000 -8.000
AH2
-8.000 -8.000 -8.000 -8.000
C.L. C.L. C.L. C.L. C.L. C.L.
DIMENSIONS C.L. C.L.
1-T2 MV CABLES) NEW MANHOLE-3
BANK-T NEW MANHOLE-2
DUCT BOTTOM OF THE MANHOLES
-6.300
-6.300
-6.300
-6.300
C.L.
C.L.
C.L.
C.L.
600 mm
EXISTING BRIDGE FOUNDATION
THICK RAFT
PROPOSED ELECTRICAL MV NEW BOTTOM OF THE MANHOLES NEW DUCT BANK-T1-T2 SHALL BE -3.600 M
10395
-6.450
SCREENING TRENCH @ 1.2m BELOW (8Ø160mm uPVC SLEEVES FOR EX
C.L.
SHALL BE -3.600 M 4M X 4M X 3.3M (LXWXD) IS
BELOW GROUND LEVEL MV CABLES) TIN
3-T4 3.5M X 3.5M X 3.3M (LXWXD) MV MANHOLE
BANK-T G
DUCT MV MANHOLE DU
NEW C T
BA
NK
PROPOSED MV DUCT BANK @ -T
1-T
2000
AH7
HR
AH7 AH7
-8.000/-8.800
0.8m BELOW GROUND LEVEL
2x(8Ø160mm uPVC SLEEVES
3
3000
5195
FOR MV CABLES)
NEW MANHOLE-1
3M X 2M X 3.5M (LXWXD)
AJ
AJ 27030 7090 35075
MV MANHOLE
NEW
AREA NOT IN SCOPE
DU
CT
BA
NK
-T
1-
T2
205
203
AD
20785
12000
AG2
AG
AF7
AF3
AF
AE
AE-1
AE-2
AF-2
AG-3
20785
6495
9095
5195
103925
ME SHAFT
215
214
213
210
212
211
209
207
6000ROAD - REFER TO TR DWGS
12000
GSE
DNSHAFT
RAMP
CURB
DUTY
ME - REFER
FREE 1 TO TR DWGS
224
223
222
221
220
219
218
217
216
6000
18995
CIRCULATION
234
233
232
231
230
229
228
227
226
225
233.a
232.a
227.a
880
5120
1800
4200
515
5485
6000
EFSO ROAD - REFER TO TR DWGS
GSE
35985
3015
CURB
F & SHAFT
SEATING
MALE
TOILET
FEMALE
ARRIVAL
RETAIL
CCH-EL-P-04
SMOKING
BUFFER
WASTER
CCH-EL-P-03
ME
ABLUTION
LOBBY
JC
ROOM
FAMILY
NURSERY
LOUNGE
BOARDING
CIRCULATION
ARR.
CORRIDOR-01
REFER
B /DEP.
TOILET
02 TO TR DWGS
243
242
241
240
239
238
237
236
235
378550
6000
EFSO
LEAP-1B
44990
3010
23655
COBUS
BUS
STAIR
MALE
GOLF
PARKING
F
LOUNGE
BOARDING
ROOM
ELECTRICAL
CCH-EL-P-05
ME
ARR.
LOBBY
F&B STAGING
02 3000APX
CIRCULATION
& SHAFT
BSEATING
/DEP.
CART AREA
253
252
251
250
249
248
247
246
245
244
6000
EFSO ROAD - REFER TO TR DWGS
GSE 18.00
42.50
262
261
260
259
258
257
256
255
254
6000 265
264
263
266
6550
6000
EFSO
2x4Ø160mm (HORIZONTAL
36655
55480
6010
COBUS
STAIR
AREA 03 3000APX
QUEUEING
CCH-EL-P-06
SCREENING
SECONDARY
CCH-EL-P-08
TL
ME
ARR.
ARRIVAL
LOBBY
LOUNGE
BOARDING
F &CLOSET
SHAFT
B /DEP.
FOR 75045
COBUS
BUSB STAGING
MALE
TOILET
FEMALE
F
SEATING
LOUNGE
BOARDING
SECURED
STAIR
EL
ME 04 3000APX
&CLOSET
SHAFT
TOILET AREA
36655
6010
ARR.
STAIR
TL
CCH-EL-P-07
ME
EL
ARR./
CORRIDOR
ARRIVAL
LOBBY
CLOSET
SHAFT
/DEP.
DEP.
05
NE
15590
AJ
AH7
AH2
AH1
AH
AG7
AG-8
650
4545
10395
5195 DUTY
WALKTHROUGH
ME EXHAUST
FREE 2 DUTY FREE
STAIR
CCH-EL-P-02
CCH-EL-P-01
LOBBY
ARRIVAL
01 2 FD ROOM
EL
FEMALE
ROOM
PRAYER
CCH-EL-S-02
CCH-EL-S-01
ABLUTION
J.C
LOBBY
ROOM
MALE
CONFIGURATION) uPVC W
SLEEVES FOR MV CABLES.
CONTRACTOR TO SURVEY THE
DU
CT
BA
Project
LEVEL FOR THE EXISTING DUCT NK
BANK FOR T3 & T4, AS PER THE -T
SITE CONDITIONS AND BUILD 3-T
4
THE NEW DUCT BANK
ACCORDINGLY WITHOUT
IMPACTING THE T3 & T4 CABLES
EX
IS
TIN
G
00 21/02/2024 Initial Submission
D
UC
T
BA
NK
-T
REV. Date Description Auth.
3-T
4 EXISTING MANHOLE
Scale N.T.S.
CONCRETE COVER
WITH INSCEPTION
"EARTHING PIT"
EARTHING ROD
BACKFILL SOIL
CONTRACTOR TO SURVEY THE LEVEL FOR THE DUCT BANK, TRENCH AND MANHOLE AS PER THE SITE CONDITIONS
150 160 250 160 150 150 160 250 160 150
CONCRETE HOUSING
GRAVEL FILLING
250 160 250
1800
1800
150160
Designed
CONDUCTOR 95mm2
DUCT BANK CONFIGURATION BETWEEN
MANHOLE 1,2 & 3
1200
LIGHT
EL. -1.20
EXISTING MANHOLE
2000
T.O.C
2X450MM CABLE LADDER FOR
NEW MANHOLE-4
300
400
900 1800
FOR EARTHING CABLES
300
300
300
900
450 450
SPACE RESERVED FOR A
450 450
FUTURE USE
600
600
Approved
Shop Drawing Title:
S20014-200S-CACCI-SHD-SC-SSC-0298-00
Sub-Discpline
Project No.
Document
Sheet No.
Discpline
Revision
Form
Type