Finishing Process:
Procurement of
Electric Wires
Fan Rods & Electric Wiring Finalizing Designs for
Chandelier chains False / Gypsum
Ceilings
Fixing
Start Market Survey Making of False / Purchase wood for
for Tiles/ Marble & Gypsum Ceiling Doors / Wooden
Other Finishing Chokaths if required
Items
Prepare for
washroom Tiles ,
Install any
Concealed Fixtures
if Required
Material Washroom Tiles Start woodwork with
Procurement for Installation Door & Chokaths
Plastering of floors
Procurement of Floor Plaster Floors For Install Chokaths , Press
Tile thew Door on Site
Tile / Marble
Finalize Selections for Installation
Start Paint Work by wall
Marble / Granites for Scrubbings followed by
Staircase and slab primer base coats
(First Floor Wall)
Floor Tile Apply Paint Fillings,
Material Procurement for
Wardrobes, Kitchen& Installation / Elevation Finalize colour scheme &
Other Woodworks work if any Apply Single Coat, Start
Polishing of doors
Final Stage of Termite Proofing,
Marble/ Granite
Making and Fixing wardrobes, Order Aluminum / UPVC
Installation
Kitchen cabinets , Medial Walls Windows, Procure Ceiling
Complete
etc. Start exterior paint works Lights, Doors Hardware
by scrubbing & base coad
Install Ceiling Lights, Installation of
Procure washroom steel & Fix All Doors & Aluminum Windows,
Ceramic Fixtures Complete Reaming Order railing where
Woodwork required
Procurement of electric Install Complete Installation of
lights & other appliances steel & Ceramic Aluminum windows,
Fixtures Order staircase &
other railings, order
Glass / Mirror
Installation Of Electric Start Finalizing paint Fix Glass/ Mirror
Lights & Other Appliances works & polish
works Select & Order Wallpapers
if any.
Install wooden floor
Horticulture & Landscape Apply Exterior final Installation of
work if required coat / Rockwall / wallpapers
Texture
Start Janitorial works Interior Paint &
Polish Final Coats
Finishing Complete