Gas Cutting Machine Safety Checklist

This document is a gas cutting machine safety checklist from Sonargaon Printing and Packaging Industries Ltd. It contains instructions for monthly safety inspections of gas cutting machines. The checklist includes items like cylinder valves, pressure gauges, regulators, hoses, flash back arrestors, cutting torches, and ensuring cylinders are secured and protected from direct sunlight with no flammable materials nearby. Signatures are required from operators, maintenance engineers, and HSE&S supervisors to verify the inspections were completed.

Uploaded by

md-rabiul.hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

Gas Cutting Machine Safety Checklist

This document is a gas cutting machine safety checklist from Sonargaon Printing and Packaging Industries Ltd. It contains instructions for monthly safety inspections of gas cutting machines. The checklist includes items like cylinder valves, pressure gauges, regulators, hoses, flash back arrestors, cutting torches, and ensuring cylinders are secured and protected from direct sunlight with no flammable materials nearby. Signatures are required from operators, maintenance engineers, and HSE&S supervisors to verify the inspections were completed.

Uploaded by

md-rabiul.hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Factory Sonargaon Printing and Packaging Industries Ltd.

Procedure No HSE&S-OHSF-
4
Locatio Date of Origin 20-01-2023
MIEZ, Tripordi, Sonargaon,Narayanganj
n
Type Checklist [Link] 00
Title Gas Cutting Machine Safety Check list Page No 01

Gas Cutting Machine Safety Check list


Frequency of Checking: Monthly

Date of Inspection: Name of the Month: December

Location: Date:
Remarks

provided at both end

protected from direct

materials around the


DA hose colour red

Gas leakage testing


done by soap water
Pressure gauge and
regulator condition

Flash back arrestor


Cylinder valve cap

gas cutting location


colour black/blue
and oxygen hose

Trolley condition
Hose condition

Cylinders are

No flammable
Cutting torch

Cylinders set
available

secured .
ID Mark

condition

sunlight
[Link]

01

02

03

04

Signature of Operator (Mechanical): Date: