0% found this document useful (0 votes)
150 views9 pages

Week 4 - Portal Building

Uploaded by

q0981423061
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
150 views9 pages

Week 4 - Portal Building

Uploaded by

q0981423061
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

CONSTRUCTION ISSUE

NEW WAREHOUSE - BRIDGESTONE STAGE 2


M20 BUSINESS PARK,
100 PLUNKET AVENUE, MANUKAU

STRUCTURAL DRAWINGS
STATUS CONSTRUCTION ISSUE

PROJECT No: 33649


COPYRIGHT
ALL RIGHTS RESERVED - NO PART OF THIS DOCUMENT
MAY BE REPRODUCED IN ANY FORM WITHOUT WRITTEN
APPROVAL FROM MSC CONSULTING GROUP LIMITED

DRAWING INDEX
S00 COVER SHEET
S000 DRAWING INDEX SHEET SCHEDULES AND 3D VIEWS
S001 STD. NOTES & DETAILS
S100 YARD SLAB PLAN
S101 FOUNDATION AND GROUND FLOOR PLAN
S102 ROOF PLAN
S103 FLOOR AND ROOF PLANS OF OFFICE
S110 ENABLING WORKS PILING PLAN
S201 ELEVATIONS ON GRID LINES 1, 2+5000 & 3
S202 ELEVATIONS ON GRID LINES 7, A+19000, 7A, A1 & B-6300
S203 ELEVATIONS ON GRID LINES A & B
S301 CONCRETE DETAILS SHEET 1
S302 CONCRETE DETAILS SHEET 2
S303 CONCRETE DETAILS SHEET 3
S401 STEEL DETAILS SHEET 1
S402 STEEL DETAILS SHEET 2
S403 STEEL DETAILS SHEET 3
S404 STEEL DETAILS SHEET 4
S410 CWB PORTAL OPTION STEEL DETAILS

1 15.05.13 CONSTRUCTION ISSUE


B 05.04.13 TENDER ISSUE
A 14.03.13 BUILDING CONSENT
REV DATE AMENDMENT

\\MSC-S05\MSC Projects\AAJOBS\33000\33649_Bridgestone Stg 2 - M20 Industrial Park\Drawings\Struct\33649_Bridgestone Stg 2 - M20 Industrial Park.rvt
MSC Consulting Group Ltd.
civil & structural engineers
12 - 14 Como Street, P O Box 33-426
Takapuna 0740, Auckland, New Zealand
P 09 486 2210 F 09 486 0225 www.msc.co.nz

CLIENT:

FOUNDATION SCHEDULE WALL SCHEDULE COLUMN SCHEDULE BEAM SCHEDULE


F1 600 x 200D STRIP FOOTING REFER DETAIL 2 / 301. W1 165 PRECAST PANEL REFER DETAIL 1 / S301. C1 PORTAL FRAME B1 PORTAL FRAME
F1A 600 x 200D STRIP FOOTING REFER DETAIL 1 / 301. W2 150 PRECAST PANEL REFER DETAIL 17 / S302. C2 250 PFC B2 CANOPY BEAM
F2 2400SQ x 300D FOUNDATION PAD REFER DETAIL 11 / S302. W3 150 PRECAST PANEL REFER DETAIL 37 / S303. C3 410 UB 54 B3 250 PFC
F3 3000 RETAINING FOOTING REFER DETAIL 1 / S301. W4 125PRECAST PANEL REFER DETAIL 2 / S301. C4 360 UB 45 B4 360 UB 45 CONSTRUCTION ISSUE
F4 600 RETANING FOOTING REFER DETAIL 2 / S301. C5 100x6 SHS B5 100x10 EA
F5 1000 x2000 x 300D FOUNDATION PAD REFER DETAIL 10 / S302. C6 200PFC B6 200 PFC NEW WAREHOUSE -
F6 400 x 300 STRIP FOOTING REFER DETAIL 39 / S303. C7 200 UC 52 B7 310 UB 40
BRIDGESTONE STAGE 2
F7 400 x 200D TIE BEAM REFER DETAIL 15 / S302. C8 610UB113 B8 300 PFC M20 BUSINESS PARK,
F8 1200SQ x 300D FOUNDATION PAD REFER DETAIL 12 / S302. 100 PLUNKET AVENUE, MANUKAU
F9 RSD FOOTING REFER DETAIL 16 / S302.
F10 800 x 300D STRIP FOOTING REFER DETAIL 37 / S303. DRAWING INDEX
F11 400 x 200 SLAB THICKNENING REFER DETAIL xx / S302. SHEET SCHEDULES
F12 1200 X 500D STRIP FOOTING REFER DETAIL 41 / S303.
F13 200 x 300 SLAB EDGE REFER DETAIL
AND 3D VIEWS
DESIGNED QH DATE FEB 2013
DRAWN BY CHECKED GIC

15/05/2013 1:59:11 p.m.


A1 SCALE A3 SCALE

JOB No. DWG No. REVISION

33649 S000 1
COPYRIGHT
ALL RIGHTS RESERVED - NO PART OF THIS DOCUMENT
GENERAL REINFORCEMENT 12d OR D16 TRM - TYP MAY BE REPRODUCED IN ANY FORM WITHOUT WRITTEN
APPROVAL FROM MSC CONSULTING GROUP LIMITED
LAP LENGTH 300 MIN

1 THE SPECIFICATION AND DRAWINGS SHALL TAKE PRECEDENCE OVER THESE 1 REINFORCEMENT SHALL BE NEW ZEALAND MANUFACTURED TO AS/NSZ 4671. CONTOUR FIT 20mm POLYSTYRENE SOME COMMON ABBREVIATIONS
NOTES AND DETAILS. ALL REINFORCEMENT TO BE HIGH DUCTILITY CLASS E. AROUND COLUMN AT FLOOR SLAB.
SC
WIRE MESH SHALL BE IN ACCORDANCE WITH NZS 3422, TO MIN GRADE 500MPa GLUE OR TAPE IN POSITION TO
ELIMINATE MOVEMENT DURING COS CHECK ON SITE
2 MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE NEW ZEALAND THE INTERNAL RADIUS OF BENDS SHALL BE AS LIMITED BY AS/NZS 3350.2.9
POUR. REMOVE AFTER SET AND FILL ES EQUALLY SPACED
BUILDING CODE, THE CURRENT EDITION OF THE RELEVANT NEW ZEALAND STANDARDS, WITH "SIKAFLEX 11FC" OR SIMILAR EXTG EXISTING
INCLUDING ASSOCIATED STANDARDS, AND LOCAL AUTHORITY REGULATIONS EXCEPT 2 TYPICAL BAR DESIGNATIONS ARE AS FOLLOWS:-
APPROVED FLEXIBLE SEALANT. FL FINISHED LEVEL
WHERE VARIED BY THE CONTRACT DOCUMENTS. 16 - HD20 - 300 EF GL GROUND LEVEL

GENERAL
DENOTES 16No PACIFIC GRADE 500E DEFORMED 20 DIA BARS AT 300 CENTRES IN EACH FACE
NOTE: LG LONG
3 THE DESIGN ADEQUACY INCORPORATED IN THESE DRAWINGS IS SUBJECT TO THE 9 - R10 TIES - 200 HAND TROWELLING OF CONCRETE NTS NOT TO SCALE
REQUIREMENTS INCLUDED IN THE SPECIFICATION FOR THE WORKS AND THE DESIGN AROUND COLUMN IS REQUIRED TO SED SMALL END DIAMETER
DENOTES 9No GRADE 300E PLAIN ROUND 10 DIA TIES AT 200 CENTRES PROVIDE SMOOTH WORKMANLIKE FINISH. SFL STRUCTURAL FINISHED LEVEL
ASSUMPTIONS INCORPORATED INTO THE CALCULATIONS AND REPORTS FOR THE PROJECT.
3 REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND NOT NECESSARILY IN TBA TO BE ADVISED
EXTERNAL COLUMN TBC TO BE CONFIRMED
4 THE DRAWINGS SHOW THE DESIGN INTENT. TRUE PROJECTION.
TYP TYPICAL
SHOP DETAILING IS THE RESPONSIBILITY OF THE CONTRACTOR. SINGLE LAYER REINFORCING DOUBLE LAYER REINFORCING UNO UNLESS NOTED OTHERWISE
4 SPLICES IN REINFORCEMENT SHALL BE MADE ONLY IN THE POSITION SHOWN ON THE

SC
5 THE STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL DRAWINGS OR AS OTHERWISE APPROVED BY THE ENGINEER. SPLICE LENGTHS SHALL PC PRECAST CONCRETE
ARCHITECTURAL AND OTHER CONSULTANTS DRAWINGS AND SPECIFICATIONS AND BE NOT LESS THAN THE FOLLOWING UNLESS SHOWN OTHERWISE FOUNDATION STEPS PCP
PS
PRECAST CONCRETE PANEL
PRESTRESSED CONCRETE
WITH SUCH OTHER INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE OF
WALL OFFSETS SIMILAR D16 TRM - TYP RC REINFORCED CONCRETE
THE CONTRACT. REFER TO THE ARCHITECTURAL DRAWINGS FOR ALL SETTING OUT, INSITU & PRECAST CONCRETE REO REINFORCEMENT
NIBS, REBATES, SETDOWNS AND THE LIKE.
ALL DISCREPANCIES SHALL BE REFERRED TO THE PRINCIPAL B BOTTOM
CONSULTANT OR THE ENGINEER BEFORE PROCEEDING WITH THE WORK. BAR SIZE D10 D12 D16 D20 D25 D28 D32

CONCRETE & REINFORCEMENT


C CENTRAL
12d OR SC SC CAR COVER ALL ROUND
6 ALL DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE WORK SHALL BE
GRADE 300E LAP LENGTH 300 MIN CJ CONSTRUCTION/CONTROL JOINT
400 550 700 900 1100 1250 1400
VERIFIED BY THE CONTRACTOR BEFORE CONSTRUCTION AND FABRICATION IS CVR COVER
COMMENCED. THE ENGINEERS DRAWINGS SHALL NOT BE SCALED. GRADE 500E EF EACH FACE
-- 900 1200 1500 1900 2100 2400 EW EACH WAY
FF FAR FACE
20mm POLYSTYRENE H HORIZONTAL
7 DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING THE STRUCTURE IN A STABLE CONDITION AND ENSURING NO PART BLOCKWORK AROUND COLUMN AT FLOOR NF NEAR FACE
SLAB. ALL AS ABOVE SC SAWCUT
SHALL BE OVERSTRESSED UNDER CONSTRUCTION ACTIVITIES. THIS INCLUDES T TOP
ALL EXISTING STRUCTURES FORMING PART OF, OR AFFECTED BY, THE WORKS. BAR SIZE D10 D12 D16 D20 D25

SC
V VERTICAL

300 MIN
12d OR
THE CONTRACTOR SHALL DESIGN AND PROVIDE PROPPING TO SUPPORT ALL
CAST INSITU AND PRECAST CONCRETE WORK UNTIL SUCH CONCRETE HAS REACHED ABR ALTERNATE BAR REVERSED
GRADE 300E INTERNAL COLUMN ABS ALTERNATE BAR STAGGERED
THE REQUIRED STRENGTH TO BE SELF SUPPORTING. -- 650 850 1050 1300
LAR LAP AT RANDOM
8 IF DURING CONSTRUCTION ANY PART OF THE WORKS SHOW SIGNS OF DISTRESS,
GRADE 500E NL NO LAP
550 1100 1450 1800 2250
EXCESSIVE DEFLECTION, CONFLICT OF COMPONENTS OR OTHER PROBLEMS, THE TYPICAL COLUMN ISOLATION STA
STR
STARTER(S)
STIRRUP
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER WHO SHALL INVESTIGATE 5 LAPPED AT RANDOM BARS:WHERE LAPS ARE NOT SPECIFICALLY SHOWN BARS TRM TRIMMER
AND ISSUE SUCH INSTRUCTIONS AS ARE CONSIDERED NECESSARY. STEEL & CONCRETE COLUMNS
MAY BE LAPPED AT RANDOM IN A STAGGERED PATTERN.
BARS SHALL BE 3.0m MINIMUM LENGTH BUT WHERE ACCURATE PLACING IS CRITICAL BARS
FOUNDATION JUNCTIONS TOS TOP OF STEEL
T/O TOP OF
LONGER THAN 3.0m MAY INCORPORATE ONE LAP COMPLYING WITH THE ABOVE TABLES.
U/S UNDERSIDE
6 SLAB REINFORCEMENT SHALL BE SUPPORTED ON STOOLS OR OTHER APPROVED METHODS. STANDARD SPLICE LENGTH CRS CENTRES
INSPECTION OR 600 MIN DIA DIAMETER

STEEL
STARTERS SHALL BE TIED IN PLACE.
PCD PITCH CIRCLE DIAMETER
12d OR R RADIUS
7 MINIMUM COVER TO BE IN ACCORDANCE WITH NZS 4210:2001 TABLE 2EI FOR DURABILITY. 300 MIN
1 ADEQUATE NOTICE IS REQUIRED BY THE ENGINEER FOR INSPECTION OF THE WORKS. 12d OR C/W COMPLETE WITH
300 MIN LEG HD HOLDING DOWN (BOLTS)
2 THE CONTRACTOR MUST BE SATISFIED THAT THE WORKS HAVE BEEN COMPLETED IN HD GALV HOT DIP GALVANISED
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS BEFORE CONFIRMING AN INSPECTION
FW FILLET WELD
BY THE ENGINEER. BLOCKWORK CFW CONTINUOUS FILLET WELD

WELDING
FWAR FILLET WELD ALL ROUND
SVBW SINGLE V BUTT WELD
1 MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH NZS 4210 DVBW DOUBLE V BUTT WELD
AND TO NZS 4230 MASONRY STANDARD GRADE B. SBBW SINGLE BEVEL BUTT WELD
CONCRETE DBBW DOUBLE BEVEL BUTT WELD
2 ALL BLOCKWORK SHALL BE DIRECTLY SUPERVISED BY A REGISTERED MASON WHO 12d OR

\\MSC-S05\MSC Projects\AAJOBS\33000\33649_Bridgestone Stg 2 - M20 Industrial Park\Drawings\Struct\33649_Bridgestone Stg 2 - M20 Industrial Park.rvt
SHALL PROVIDE CONTINUOUS INSPECTION. 300 MIN LEG
1 ALL WORKMANSHIP AND MATERIAL SHALL BE IN ACCORDANCE WITH NZS 3109
3 ALL MASONRY UNITS SHALL BE OPEN END REINFORCING UNITS, THE BOTTOM COURSE
2 UNLESS NOTED OTHERWISE MINIMUM COVER TO PRINCIPAL REINFORCEMENT SHALL BE:- TO BE PLACED UPSIDE DOWN. ALL CELLS ARE TO BE FILLED.

BEAMS & SLABS, WALLS 4 FOR HEIGHTS OVER 1.2m THE 'HIGH LIFT' METHOD OF GROUTING SHALL BE USED. WALL & SLAB PENETRATIONS
EXPOSURE FOUNDATIONS & RIBS PROVIDE CLEAN OUT PORTS AT EVERY VERTICAL BAR AND AT THE BOTTOM OF EVERY LIFT PENETRATIONS LESS THAN 300 GREATEST DIMENSION ARE
COLUMNS UNLESS SHOWN ON THE DRAWINGS.
DIA <24 / DIA = or >24 GENERALLY NOT SHOWN ON THE DRAWINGS

CAST AGAINST OR 5 CONTROL JOINTS ARE TO BE PROVIDED AT 6.0m MAXIMUM CENTRES UNLESS SHOWN TRIMMERS SHALL BE PROVIDED FOR ALL PENETRATIONS
75 75 75 OTHERWISE ON THE DRAWINGS. WITH ONE DIMENSION GREATER THAN 200 OR 200
EXPOSED TO EARTH
DIAMETER
EXPOSED 6 MINIMUM GROUT STRENGTH TO BE IN ACCORDANCE WITH NZS 4210:2001 CLAUSE 2.3.2.1
MSC Consulting Group Ltd.
INSITU 50 50 40/45
TO WEATHER TRIMMERS TO BE:- 1-D16 FOR THICKNESS UP TO 150
PRECAST 40 40 30/40 FOR THE APPROPRIATE DURABILITY ZONE. LAP LENGTH 2-D16 FOR THICKNESS 155 - 300 civil & structural engineers
NOT EXPOSED INSITU -- 40 25/30 12 - 14 Como Street, P O Box 33-426
TO WEATHER PRECAST -- 35 20/25 LAP LENGTH
Takapuna 0740, Auckland, New Zealand
TYPICAL 12d OR P 09 486 2210 F 09 486 0225 www.msc.co.nz
STEELWORK 300 MIN LEG
SIKAFLEX CONSTRUCTION
3 NO HOLES , CHASES OR EMBEDMENT OF PIPES OTHER THAN THOSE SHOWN ON SEALANT TO (COLOUR MATCH)
16 GAP
THE STRUCTURAL DRAWINGS SHALL BE MADE IN CONCRETE MEMBERS WITHOUT THE
APPROVAL OF THE ENGINEER.
1 MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH NZS 3404 15 CHAMFERS - TYP ON BACKING ROD TO OUTSIDE FACE
CLIENT:

300 MIN
12d OR
WELDING SHALL COMPLY WITH AS 1554.1 IN CONJUNCTION WITH NZS 3404 APPENDIX D
OUTSIDE FACE
4 ALLOW FOR ALL CAST-IN CLEATS, HOLDING DOWN BOLTS AND THE LIKE.
2 ALL CONNECTONS SPLICES AND BASEPLATES SHALL BE TO HERA REPORT R4-100 AS SHOWN
5 TYPICALLY ON THE DRAWINGS UNLESS SPECIFICALLY NOTED OR DETAILED.
INSITU AND PRECAST SUSPENDED SLABS AND BEAMS SHALL BE GIVEN A POSITIVE
UPWARD CAMBER OF 2mm PER 1000mm OF SPAN.
ALLOWANCES SHALL BE MADE FOR CAMBER WHEN SETTING OUT LEVELS. 3 BOLTS SHALL GENERALLY BE SNUG FIT HIGH STRENGTH BOLTS TO AS 1252. INSIDE FACE
BOLTS DESIGNATED Mxx/8.8 SHALL BE HIGH STRENGTH BOLTS TO AS 1252 SEE ARCHITECTURAL FOR SEALING
6 PROVIDE D12 TRIMMER BARS TO ALL SLAB EDGES. FULLY TENSIONED IN ACCORDANCE WITH NZS 3404. AND AREAS REQUIRING FIREPRO
LAP LENGTH 1200 WHERE POSSIBLE M707 FIRE RATED MASTIC TO
4 INTERNAL FACE. M707 MASTIC MAY
7 CONSTRUCTION JOINTS SHALL BE PROPERLY FORMED AS DETAILED AND WHERE SHOWN WELDS TO BE CONTINUOUS SINGLE BEVEL BUTT OR 5mm CONTINUOUS FILLET
BE REQUIRED FOR BOTH FACES.
ON THE DRAWINGS, OR AS SPECIFICALLY APPROVED BY THE ENGINEER. WELDS (6mm FOR MANUAL WELDS) AS APPROPRIATE UNLESS NOTED OTHERWISE.

8 SLABS ON GROUND SHALL BE SAWCUT 1/4 SLAB THICKNESS TO THE LAYOUT ON THE 5 HOLDING DOWN BOLTS AND CAST-IN ITEMS SHALL BE SET ACCURATELY BY
DRAWINGS OR 5000 x 5000 MAXIMUM GRID BETWEEN 24 & 48 HOURS AFTER POURING. TEMPLATE FOR POSITION, PLUMB AND LEVEL BEFORE CONCRETING. VERTICAL PC PANEL JOINT
NO LAPS SHALL OCCUR AT JOINTS. POURS IN SLABS OR STRIPS MAY SUPERSEDE
THESE DETAILS WITH THE APPROVAL OF THE ENGINEER. 6 BASEPLATES SHALL BEAR DIRECTLY ON 25 NOMINAL THICKNESS DRY PACK MORTAR UNLESS NOTED. R20 x600 - 1 PER BOND BEAM.
TO BE POSITIONED TRULY
7 HORIZONTAL AND PARALLEL TO 300
9 MINIMUM CONCRETE STRENGTH SHALL BE IN ACCORDANCE WITH NZS 3101:1995 WASHERS, TAPERED WHERE NECESSARY, ARE TO BE USED UNDER BOLT HEADS AND NUTS
THE LONGITUDINAL WALL CENTRELINE DENSO TAPE WRAPPING
CHAPTER 5 FOR DURABILITY. OR SIMILAR BOND BREAK
8 HOLLOW SECTION MEMBERS SHALL BE CAPPED AND ALL JOINTS SEALED
WALL BAR
NEW WAREHOUSE -
9 FOR HOT DIP GALVANISED ITEMS ALLOW FOR TOLERANCES, VENT HOLES ETC.
WALL JUNCTIONS AND TERMINATIONS BRIDGESTONE STAGE 2
VENT HOLES SHALL BE SEALED AFTER GALVANISING
TIMBER THESE DETAILS APPLY UNLESS DETAILED OTHERWISE
LAPS TO BE STANDARD UNLESS DETAILED OTHERWISE
10 UNLESS OTHERWISE SPECIFIED ALL STEELWORK SHALL BE PAINTED WITH ONE COAT
OF AN APPROVED ZINC PHOSPHATE PRIMER IN ACCORDANCE WITH THE
1 ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH NZS 3602 & NZS 3603 MANUFACTURERS RECOMMENDATIONS. PREPARATION OF THE STEEL SURFACE FOR
PAINTING SHALL BE IN ACCORDANCE WITH BS 7079, PART A1, CONDITION St2
2 LIGHT TIMBER FRAMED CONSTRUCTION SHALL BE IN ACCORDANCE WITH NZS 3604 UNLESS NOTED OTHERWISE IN THE MANUFACTURER'S RECOMMENDATIONS. STOP BOND BEAM BARS SIKAFLEX CONSTRUCTION SEALANT (COLOUR
DO NOT PAINT STEELWORK TO BE ENCASED IN CONCRETE OR SURFACES FORMING 70 EACH SIDE OF JOINT MATCH) ON BACKING ROD TO OUTSIDE FACE
PART OF A TENSIONED BOLTED CONNECTION. STANDARD NOTES &
BLOCKWALL CONTROL JOINT
DETAILS
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REFER ARCHITECTURAL DRAWINGS FOR ALL SETTING OUT,

15/05/2013 1:59:11 p.m.


LOCATE & EXPOSE PIPELINES & SERVICES PRIOR TO LEVELS, SETDOWNS, NIBS, REBATES, DUCTS THRU FLOORS REFER TO MSC DURABILITY
COMMENCING EXCAVATING WORKS, DRILLING PILE THE STRUCTURAL DRAWINGS MUST BE READ IN & WALLS ETC. AND ALL OTHER SETTING OUT UNLESS SHOWN. SPECIFICATION. TO BE READ IN
HOLES OR DRIVING PILES ON SITE TO ENSURE THE CONJUNCTION WITH THE ARCHITECTURAL ANY DISCREPENCIES SHALL BE REFERRED TO THE CONJUNCTION WITH THE JOB No. DWG No. EDITION

REQUIRED CLEARANCES TO SERVICES ARE ACHIEVED. DRAWINGS AND OTHER CONSULTANTS' DRAWINGS ARCHITECT FOR CLARIFICATION. DO NOT SCALE. ARCHITECTURAL SPECIFICATION. 33649 S001 02.11
1 2 3 4 5 6 7

F4
10617 10617 10617 10617 10617 10617

SIM
10 1 17
17 21 S302
S302 S301 S302
S302
F5 C1 C1 C1 C1 C4
C1 F5 C1 F5 F5 F5 F5
W2 F1 W1 F1A W1 F1A W1 F1A W1 F1A W1 F1A W1 F1A W2 F1
A

1000

1000
W1 F5

F6
W1 39
F1A F3
F1A F3 22 S303
F13

S302

C7
SLAB
7943

F3

W1 F1
170 SLAB + SE82 MESH, F6
40 TOP COVER ON DPM SLAB
ON 5 NOM. SAND BLINDING
20 ON 300 MIN COMPACTED GAP 40
150 SLAB + SE82 MESH,
40 TOP COVER ON DPM
S302
ON 5 NOM. SAND BLINDING
ON 300 MIN COMPACTED GAP 40

20 F13

C3
S302 F7 F7 18
S302
F8 F8

C7
C3

F4
S.E.M.J
7A
SFL 18400
7758

LESA TYPE G45 STEEL EDGED


WAREHOUSE SLAB MOVEMENT JOINT WITH COVER
PLATES WITH DIAMOND DOWELS
F1

-165 PT SLAB BY CONSLAB ON 2


LAYERS POLYTHENE DPM ON AT 500 CRS 7200
10 AP7 BLINDING ON 450mm

C7
COMPACTED GAP 65 FLOOR DESIGN LOAD
F4

15
W4

-S.E.M.J AS NOTED

F7
F7

F7

F7

F7
S302 -APPLY CONSLAB DIAMOND MAX. UNIFORMLY DISTRIBUTED

C3
F8 F7 SLAB SEALER LOADS OF 30KPa OR 7 TONNE F7
-BURNISH FINISH (70Kn) RACK LEG LOADS ON GRID
31400

12 OF 2700x850mm WITH MIN. 300mm


CLEARANCE BETWEEN RACKS.
S302 16 TONNE AXLE FORKLIFTS F8
C3

( UNLIMITED REPETITIONS )
A1
3 NOTES
S301 15
S302 - PROVIDE COLUMN
C6

C7

C7

C7
ISOLATIONS
7758

SEMJ CAST IN HALF

- PROVIDE 6mm STEEL PLATE


59
TO ALLOW FUTURE

TO COVER VOID AROUND


S404
67A COLUMN ISOLATIONS
S404
EXPANSION

- PROVIDE LIGHT GAUGE


ALUMINIUM ANGLE AROUND
THE PERIMETER OF THE
WAREHOUSE TO COVER

C3
F8 F7 SHRINKAGE GAPS TO PRECAST F7
PANELS

14500
- MIN CBR=3% AT SUBGRADE
F8
C3

W3 F10
7943

TIMBER STAIR
REFER ARCHITECT

F4 F9 F4 F9 F4
C2 C2
C2

C2
B SEMJ HD GALV SEMJ HD GALV
B
W4 F1 W4 F1 W4 F1 W4 F1
W4

C8
F2 F2 F2 F2 F2 F2 F2
C1
C1

C1

C1

C1

C1
2 11
S301 16 F1 13
S302
S302 S302

OFFICE REFER S103

FOUNDATION SCHEDULE COLUMN SCHEDULE WAREHOUSE FOUNDATION AND GROUDN FLOOR PLAN EXISTING SERVICES
F1 600 x 200D STRIP FOOTING REFER DETAIL 2 / 301. C1 PORTAL FRAME 1 : 100 IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE &
F1A 600 x 200D STRIP FOOTING REFER DETAIL 1 / 301. C2 250 PFC EXPOSE PIPELINES & SERVICES PRIOR TO COMMENCING EXCAVATING
F2 2400SQ x 300D FOUNDATION PAD REFER DETAIL 11 / S302. C3 410 UB 54 WORKS, DRILLING PILE HOLES OR DRIVING PILES ON SITE TO
SYMBOL DESCRIPTION ENSURE THE REQUIRED CLEARANCES TO SERVICES ARE ACHIEVED.
F3 3000 RETAINING FOOTING REFER DETAIL 1 / S301. C4 360 UB 45 WALL SCHEDULE
F4 600 RETANING FOOTING REFER DETAIL 2 / S301. C5 100x6 SHS W1 165 PRECAST PANEL REFER DETAIL 1 / S301. SC 30x5 SAWCUTS CUT WITHIN 24 HRS OF POURING
F5 1000 x2000 x 300D FOUNDATION PAD REFER DETAIL 10 / S302. C6 200PFC W2 150 PRECAST PANEL REFER DETAIL 17 / S302. SLAB. MESH TO BE SUPPORTED ON STOOLS WITH
F6 400 x 300 STRIP FOOTING REFER DETAIL 39 / S303. C7 200 UC 52 W3 150 PRECAST PANEL REFER DETAIL 37 / S303. 40mm TOP COVER
MINIMUM SPECIFIED 28 DAY CONCRETE STRENGTH
F7 400 x 200D TIE BEAM REFER DETAIL 15 / S302. C8 610UB113 W4 125PRECAST PANEL REFER DETAIL 2 / S301.
FOUNDATIONS 25MPa
F8 1200SQ x 300D FOUNDATION PAD REFER DETAIL 12 / S302. CJ CONTROL JOINT SPEED DOWELS AT 600 CRS.
F9 RSD FOOTING REFER DETAIL 16 / S302. FLOOR SLAB ON GRADE (OFFICE) 30MPa MIN TENSILE STRENGTH 2.5MPa
F10 800 x 300D STRIP FOOTING REFER DETAIL 37 / S303. SUSPENDED SLABS 30MPa
STEP FLOOR LEVEL STEP AS SHOWN
F11 400 x 200 SLAB THICKNENING REFER DETAIL xx / S302. FLOOR SLAB ON GRADE (WAREHOUSE) 35MPa
F12 1200 X 500D STRIP FOOTING REFER DETAIL 41 / S303. PRECAST CONCRETE 40MPa UNO
2 D12 x 1200 AT 200 CRS
F13 200 x 300 SLAB EDGE REFER DETAIL BLOCKWORK INFILL 20MPa
\\MSC-S05\MSC Projects\AAJOBS\33000\33649_Bridgestone Stg 2 - M20 Industrial Park\Drawings\Struct\33649_Bridgestone Stg 2 - M20 Industrial Park.rvt 15/05/2013 1:59:12 p.m.
REV DATE AMENDMENT CLIENT: ARCHITECT: JOB No
1 15.05.13 CONSTRUCTION ISSUE MSC Consulting Group Ltd. NEW WAREHOUSE - 33649
C 05.04.13 TENDER ISSUE
B 18.03.13 BUILDING CONSENT civil & structural engineers BRIDGESTONE STAGE 2 DWG No
A 14.03.13 BUILDING CONSENT
12 - 14 Como Street, P O Box 33-426
FOUNDATION AND GROUND FLOOR PLAN M20 BUSINESS PARK,
REVISION

COPYRIGHT
ALL RIGHTS RESERVED - NO PART OF THIS DOCUMENT MAY BE
REPRODUCED IN ANY FORM WITHOUT WRITTEN APPROVAL FROM MSC CONSTRUCTION ISSUE
Takapuna 0740, Auckland, New Zealand
P 09 486 2210 F 09 486 0225 www.msc.co.nz
DESIGNED QH DATE FEB 2013 A1 SCALE A3 SCALE 100 PLUNKET AVENUE, S101 1
CONSULTING GROUP LIMITED DRAWN BY CHECKED 1 : 100 MANUKAU
1 2 3 4 5 6 7
10617 10617 10617 10617 10617 10617

DHS 250 / 18 PURLIN SET OUT REFER


DHS 250 / 18 PURLIN SET OUT REFER 1700 1700 ELEVATION ON GRID LINE 3 / S201. 1700
37 ELEVATION ON GRID LINE 1/ S201. RB20 ROOF BRACE 3 ROWS OF FAST BRACE PER BAY. RB20 ROOF BRACE

SPLICE

SPLICE

SPLICE
S402 3 ROWS OF FAST BRACE PER BAY. GRID 2 - GRID 6
GRID 1 - GRID 2 & GRID 6 - GRID 7

A
B5 B8 TOES UP B8 TOES UP B8 TOES UP B8 TOES UP B8 TOES UP B8 TOES UP
F.B F.B F.B F.B F.B F.B

F.B
F.B F.B F.B F.B F.B F.B
F.B

TIMBER ROOF
REFER ARCHITECTS.
F.B F.B F.B F.B F.B F.B
F.B

TOES DOWN
F.B F.B F.B F.B F.B F.B
F.B

B5

B3
DHS TRIM

DHS 250 / 15 PURLIN

DHS TRIM
AT 1200CRS. MAX.

B4
2 ROWS OF FAST BEACE DOUBLE PURLIN DOUBLE PURLIN

44
S403
7A
B1

B1

B1

B1

B1
F.B F.B F.B F.B F.B F.B
F.B
B1

4° FALL
24
S402
7200
31400

TOES DOWN
RIDGE
A1

4° FALL
B3

B3 TOES UP B3 TOES UP

23
F.B F.B
B1

B1

B1

B1

B1
F.B F.B F.B S402 F.B F.B
B1

DHS TRIM
B4
DOUBLE PURLIN DOUBLE PURLIN
DHS TRIM

14500
F.B
F.B F.B F.B F.B F.B F.B
21 20 22
S402 S402 F.B S402
F.B F.B F.B F.B F.B F.B

F.B
F.B F.B F.B F.B F.B F.B

F.B F.B F.B F.B F.B F.B F.B


B3
B B3 B3 B3 B3 B3
B

F.B F.B F.B F.B F.B F.B F.B

OFFICE REFER S103

B2
B2

B2

B2

B2

B2

B2
10000

25
S402
BEAM SCHEDULE
4° FALL

F.B F.B F.B F.B F.B F.B F.B B1 PORTAL FRAME


B2 CANOPY BEAM
B3 250 PFC
B4 360 UB 45
B5 100x10 EA
B3 B3 B3 B3 B3
B6 200 PFC
C B3 B7 310 UB 40
B8 300 PFC
DHS 250 / 18 PURLIN SET OUT REFER RB16 ROOF BRACE DHS 250 / 18 PURLIN SET OUT REFER CANOPY RB16 ROOF BRACE NOTE:
ELEVATION ON GRID LINE 1 / S201. ELEVATION ON GRID LINE 3 / S201. DHS 250 / 18 PURLIN SET OUT REFER ALL CANOPY PURLINS TO BE
3 ROWS OF FAST BRACE PER BAY. 3 ROWS OF FAST BRACE PER BAY. ELEVATION ON GRID LINE 3 / S201. SPECIAL GRADE Z450.
GRID 1 - GRID 2 & GRID 6 - GRID 7 GRID 2 - GRID 6 3 ROWS OF FAST BRACE PER BAY.
GRID 1 - GRID 7

WAREHOUSE ROOF PLAN


1 : 100
\\MSC-S05\MSC Projects\AAJOBS\33000\33649_Bridgestone Stg 2 - M20 Industrial Park\Drawings\Struct\33649_Bridgestone Stg 2 - M20 Industrial Park.rvt 15/05/2013 1:59:14 p.m.
REV DATE AMENDMENT CLIENT: ARCHITECT: JOB No
1 15.05.13 CONSTRUCTION ISSUE MSC Consulting Group Ltd. NEW WAREHOUSE - 33649
C 05.04.13 TENDER ISSUE
B 18.03.13 BUILDING CONSENT civil & structural engineers BRIDGESTONE STAGE 2 DWG No
A 14.03.13 BUILDING CONSENT
12 - 14 Como Street, P O Box 33-426
ROOF PLAN M20 BUSINESS PARK,
REVISION

COPYRIGHT
ALL RIGHTS RESERVED - NO PART OF THIS DOCUMENT MAY BE
REPRODUCED IN ANY FORM WITHOUT WRITTEN APPROVAL FROM MSC CONSTRUCTION ISSUE
Takapuna 0740, Auckland, New Zealand
P 09 486 2210 F 09 486 0225 www.msc.co.nz
DESIGNED QH DATE FEB 2013 A1 SCALE A3 SCALE 100 PLUNKET AVENUE, S102 1
CONSULTING GROUP LIMITED DRAWN BY CHECKED 1 : 100 MANUKAU
C B A
10000 31400
200 200 FOUNDATION SCHEDULE

4.00°
4.00°
00 1200 1000
1200 12 1200
1200 1200 1200 1200 1200 1200 1200 1200 1200
F1 600 x 200D STRIP FOOTING REFER DETAIL 2 / 301.
1500 1200 1500 1500
1200 1500 1200
84 1200 1200 F1A 600 x 200D STRIP FOOTING REFER DETAIL 1 / 301.

B3
DHS TRIM 690
DHS TRIM F2 2400SQ x 300D FOUNDATION PAD REFER DETAIL 11 / S302.

B3
F.B
F3 3000 RETAINING FOOTING REFER DETAIL 1 / S301.

B8
B1 B1 F.B
F.B F.B F.B
F.B KNEE F4 600 RETANING FOOTING REFER DETAIL 2 / S301.
F.B F.B F.B
F.B F5 1000 x2000 x 300D FOUNDATION PAD REFER DETAIL 10 / S302.
WP2
F.B F.B
F6 400 x 300 STRIP FOOTING REFER DETAIL 39 / S303.
F.B
B3 F7 400 x 200D TIE BEAM REFER DETAIL 15 / S302.

C1

C1
C6

C3
C3

C3

W1
F.B F8 1200SQ x 300D FOUNDATION PAD REFER DETAIL 12 / S302.
F.B F9 RSD FOOTING REFER DETAIL 16 / S302.
B2 F.B
SIM F10 800 x 300D STRIP FOOTING REFER DETAIL 37 / S303.
45 B3 TOES UP 38
S403 F11 400 x 200 SLAB THICKNENING REFER DETAIL xx / S302.
PORTAL FRAME PRESET S402

B3
REFER ELEVATION ON
F.B
F.B F.B F.B F12 1200 X 500D STRIP FOOTING REFER DETAIL 41 / S303.
GRID LINE 3
8 F13 200 x 300 SLAB EDGE REFER DETAIL
F.B S401

W4
W4 W4 W4 W4 W4 W4 W4 W4 W4

W1 FINISH GL.
FINISH GL.
GROUND
WALL SCHEDULE
W1 165 PRECAST PANEL REFER DETAIL 1 / S301.
F2 F8 F4 F1 F8 F8 W2 150 PRECAST PANEL REFER DETAIL 17 / S302.
F5
W3 150 PRECAST PANEL REFER DETAIL 37 / S303.
DHS300 / 18 GIRT AT 1800CRS. MAX.
W4 125PRECAST PANEL REFER DETAIL 2 / S301.
ELEVATION ON GRID LINE 1 2 ROWS OF FAST BRACE PER BAY
C B 1 : 100 A
10000 31400
65
S404

B3
B3

64 B3 B3
S404 KNEE

B8
COLUMN SCHEDULE
SPEED
SPEED SPEED C1 PORTAL FRAME
WALL
WALL WALL C2 250 PFC
B6 C3 410 UB 54
C4 360 UB 45
C7

C7

C7
B3

C5 100x6 SHS

B8
C7
C6 200PFC

W1
C7 200 UC 52
C8 610UB113
W4

67
S404
FINISH GL.
GROUND
BEAM SCHEDULE
F4 F3 FINISH GL. B1 PORTAL FRAME
F1 ELEVATION ON GRID LINE 2+5000 F1A B2 CANOPY BEAM
1 : 100 B3 250 PFC
C B A B4 360 UB 45
10000 31400
B5 100x10 EA
B6 200 PFC

4.00°
KNEE B PRESET KNEE A PRESET
4.00°

1200 1200 2400


2400 2400 2400
1500 2400 2400 1500 1500 690
B7 310 UB 40
84 1200 1500 1200 1200
1200 1200
B8 300 PFC
B3

FL4 FL3
FL2
FL5 WB4 WB3
3 B1 WB2

B8
FL4
B3

WB5 F.B B1 F.B FL3


515

515

F.B F.B S401 F.B F.B FL2 KNEE


CANOPY PRESET FL5
F.B F.B
830

F.B F.B

830
830 2 830
"L" APEX PRESET
F.B S401 "L"
1500 1500 FL6 FL1 WB1 FL1
2250 2250 WB6
870 FL6
B3

1 STELTECH SIZES PRESET TABLE


300

B3

FL7
S401 WIDTH GAUGE F.B
WB7 APEX PRESET 55mm
600

F.B FL1,FL6 245 14 KNEE A PRESET 15mm


B2 FL7

W1
5 F.B
4 FL2,FL3,FL4 245 10 KNEE B PRESET 15mm
6
3

S401 FL5 245 12 B8 C1


B3 B

S401 CANOPY PRESET 50mm

9500
S401 FL7 210 12
F.B WB1,WB6 8
WB2,WB5 6
C1

WB3,WB4,WB7 5
W4

F.B
"L" = 7950

7
S401
FINISH GL.
GROUND

F3 FINISH GL.
F4 F2
ELEVATION ON GRID LINE 3 ( GRID LINE 2, 4, 5 & 6 SIM) F5
\\MSC-S05\MSC Projects\AAJOBS\33000\33649_Bridgestone Stg 2 - M20 Industrial Park\Drawings\Struct\33649_Bridgestone Stg 2 - M20 Industrial Park.rvt 1 : 100 15/05/2013 1:59:17 p.m.
REV DATE AMENDMENT CLIENT: ARCHITECT: JOB No
1 15.05.13 CONSTRUCTION ISSUE MSC Consulting Group Ltd. NEW WAREHOUSE - 33649
B 05.04.13 TENDER ISSUE
A 14.03.13 BUILDING CONSENT civil & structural engineers BRIDGESTONE STAGE 2 DWG No

12 - 14 Como Street, P O Box 33-426


ELEVATIONS ON GRID LINES 1, 2+5000 & 3 M20 BUSINESS PARK,
REVISION

COPYRIGHT
ALL RIGHTS RESERVED - NO PART OF THIS DOCUMENT MAY BE
REPRODUCED IN ANY FORM WITHOUT WRITTEN APPROVAL FROM MSC CONSTRUCTION ISSUE
Takapuna 0740, Auckland, New Zealand
P 09 486 2210 F 09 486 0225 www.msc.co.nz
DESIGNED QH DATE FEB 2013 A1 SCALE A3 SCALE 100 PLUNKET AVENUE, S201 1
CONSULTING GROUP LIMITED DRAWN BY CHECKED 1 : 100 MANUKAU
1 2 3 4 5 6 7
10617 10617 10617 10617 10617 10617

3479 3479 3479 3539 3539 3539 3539 3539 3539 3539 3539 3539 3539 3539 3539 3479 3479 3479

B3
KNEE
B8 TOES UP B8 TOES UP B8 TOES UP B8 TOES UP B8 TOES UP B8 TOES UP

9 10
S401 S401

F.B

W1
F.B F.B F.B F.B F.B F.B
W1

W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1

B8 B8
C1

C1

C1

C1

C1

C1

C4
BELOW BELOW

1200 1200
4B F.B
F.B S401 F.B F.B F.B F.B F.B

B5
W2 21 W2
S302
GROUND

F1
F5 F1A F3 F5 F1A F3 F5 F1A F3 F5 F1A F3 F5 F1A F3 F5 F1A F3 F1
FINISH GL. F5
FINISH GL.

ELEVATION ON GRID LINE A


FOUNDATION SCHEDULE WALL SCHEDULE 1 : 100
F1 600 x 200D STRIP FOOTING REFER DETAIL 2 / 301. W1 165 PRECAST PANEL REFER DETAIL 1 / S301.
F1A 600 x 200D STRIP FOOTING REFER DETAIL 1 / 301. W2 150 PRECAST PANEL REFER DETAIL 17 / S302.
F2 2400SQ x 300D FOUNDATION PAD REFER DETAIL 11 / S302. W3 150 PRECAST PANEL REFER DETAIL 37 / S303.
F3 3000 RETAINING FOOTING REFER DETAIL 1 / S301. W4 125PRECAST PANEL REFER DETAIL 2 / S301.
COLUMN SCHEDULE BEAM SCHEDULE
F4 600 RETANING FOOTING REFER DETAIL 2 / S301. C1 PORTAL FRAME B1 PORTAL FRAME
F5 1000 x2000 x 300D FOUNDATION PAD REFER DETAIL 10 / S302. C2 250 PFC B2 CANOPY BEAM
F6 400 x 300 STRIP FOOTING REFER DETAIL 39 / S303. C3 410 UB 54 B3 250 PFC
F7 400 x 200D TIE BEAM REFER DETAIL 15 / S302. C4 360 UB 45 B4 360 UB 45
F8 1200SQ x 300D FOUNDATION PAD REFER DETAIL 12 / S302. C5 100x6 SHS B5 100x10 EA
F9 RSD FOOTING REFER DETAIL 16 / S302. C6 200PFC B6 200 PFC
F10 800 x 300D STRIP FOOTING REFER DETAIL 37 / S303. C7 200 UC 52 B7 310 UB 40
F11 400 x 200 SLAB THICKNENING REFER DETAIL xx / S302. C8 610UB113 B8 300 PFC
F12 1200 X 500D STRIP FOOTING REFER DETAIL 41 / S303.
F13 200 x 300 SLAB EDGE REFER DETAIL

1 2 3 4 5 6 7 7A
10617 10617 10617 10617 10617 10617

DHS300 / 18 DOOR TRIM


BOLTED FAST BRACES
B3 B3 B3 B3 B3 B3 ALIGN WITH LADDER
FIXING POINTS.
KNEE

43
F.B F.B F.B F.B F.B S403
C1

C1

C1

C1

C1

C1

C8

B3
B3

B3
B3 B2 B3
40
B2

B2

B2

B2

B2

B2
B3 B3 S403 45 B3 B3 B3 TOES DOWN

C6

C6
TOES UP TOES UP TOES UP TOES UP
B3 TOES UP
S403
R12 HANGER
F.B F.B F.B 42 F.B F.B F.B F.B
S403
56
S404
58 FIRST FLOOR

B5
C2

C2

C2

C2
S404
W4

OPENING W4 OPENING
W4 W4 W4 WP1 W4 W4 W4 W4 W4 W4 W4 OPENING W4 W4 W4 W4 W4 W4 W4
OPENING

OPENING
41

W3
57 W3
FINISH GL. S403 B8 S404
GROUND

FINISH GL.

F2 F2 F2 F9 F1 F2 F9 F1 F2 F2 55 F2
F1 F4 F1 F4 F1 F4 F1 F4 F1 F4 F10 F12
S404 PANEL NOT TO HAVE VERTICAL JOINT.
RB20 WALL BRACE CONTRACTOR TO ADVISE ON SIZE
DHS300 / 18 GIRT AT 1800CRS. MAX. LIMITATIONS.
RB20 WALL BRACE 3 ROWS OF FAST BRACE PER BAY

ELEVATION ON GRID LINE B


1 : 100 15/05/2013 1:59:20 p.m.
\\MSC-S05\MSC Projects\AAJOBS\33000\33649_Bridgestone Stg 2 - M20 Industrial Park\Drawings\Struct\33649_Bridgestone Stg 2 - M20 Industrial Park.rvt
REV DATE AMENDMENT CLIENT: ARCHITECT: JOB No
1 15.05.13 CONSTRUCTION ISSUE MSC Consulting Group Ltd. NEW WAREHOUSE - 33649
C 05.04.13 TENDER ISSUE
B 18.03.13 BUILDING CONSENT civil & structural engineers BRIDGESTONE STAGE 2 DWG No
A 14.03.13 BUILDING CONSENT
12 - 14 Como Street, P O Box 33-426
ELEVATIONS ON GRID LINES A & B M20 BUSINESS PARK,
REVISION

COPYRIGHT
ALL RIGHTS RESERVED - NO PART OF THIS DOCUMENT MAY BE
REPRODUCED IN ANY FORM WITHOUT WRITTEN APPROVAL FROM MSC CONSTRUCTION ISSUE
Takapuna 0740, Auckland, New Zealand
P 09 486 2210 F 09 486 0225 www.msc.co.nz
DESIGNED QH DATE FEB 2013 A1 SCALE A3 SCALE 100 PLUNKET AVENUE, S203 1
CONSULTING GROUP LIMITED DRAWN BY CHECKED 1 : 100 MANUKAU