33 kV & 6.6 kV Switchboard Specs

The document provides a scope matrix for the technical specification of engineering and supply of 33 kV and 6.6 kV switchboards. It lists various items including electrical equipment, civil works, manuals, training and documentation. It specifies the responsibilities of AMNS and the bidder for each item and phase from basic information to commissioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views1 page

33 kV & 6.6 kV Switchboard Specs

The document provides a scope matrix for the technical specification of engineering and supply of 33 kV and 6.6 kV switchboards. It lists various items including electrical equipment, civil works, manuals, training and documentation. It specifies the responsibilities of AMNS and the bidder for each item and phase from basic information to commissioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ArcelorMittal Nippon Steel India

Technical Specification for Engineering and Supply of 33 kV, 6.6 kV Switchboard

Annex - 1 : Scope Matrix as per AMDEC-123005-05-17-ELC-SPC-0002


BI - Basic Information
BE - Basic Engineering
DE - Detailed Engineering
AMNS - ArcelorMittal/Nippon Steel (BUYER) SUP - Supply
B - Bidder ER - Erection/Construction
SUP ER - Supervision over Erection
COM - Commissioning

SUP
No ITEM Quantity BI BE DE SUP ER COM REMARKS
ER
All drawings & documents will be
Engineering drawings & documents including 3D model of 33 kV and 6.6 kV
1 B B B - - - - reviewed by
Switchboard
AMNS/representatives

2 Civil & Structural works


Bidder to provide complete load
2.1 Civil & Structural works (equipment foundations etc.) B B AMNS AMNS AMNS AMNS - data and assignment for further
engineering.
3 Electrical equipment & facilities

3.1 33 KV Switchboard Panel One No. B B B B AMNS B B

3.2 6.6 KV Switchboard (One in ECR-1 and One in ECR-2) Two Nos B B B B AMNS B B

3.3 6.6 KV Breaker Change Over Panel One No. B B B B AMNS B B

3.4 Base Frame as required for all the above Panels One Set B B B B AMNS B B

3.5 Ethernet Switches (Managed Type L2 and L3) One Set B B B B AMNS B B

3.6 Copper Ethernet Cable B B B B AMNS B B


-

3.7 Modbus/Profibus Cable B B B B AMNS B B

4 Others
4.1 User Manuals in English - B B
4.2 Lockout / Tagout system - B/AMNS B B B AMNS B B
4.3 Spare parts for commissioning and wear parts - B B
4.4 List of Spare parts for 24 months after start-up - B B
4.5 Training - B
4.6 As-Built documentation - B B

4.7 Other.. - To be specified by Bidder, if any