0% found this document useful (0 votes)
11 views31 pages

PVP

Uploaded by

kiranran99
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views31 pages

PVP

Uploaded by

kiranran99
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NAME OF THE WORK :- PROPOSED MEDICAL COLLEGE & HOSPITAL AT PARVATHIPURAM, ANDHRA PRADESH

1 A MAIN HOSPITAL BLOCK (G+6) 8 H UNDER GROUND TANK 15 O UG GIRLS HOSTEL (G+7)

2 B IPD BLOCK (Sixth Floor ) 9 I BOUNDARY WALL

3 C CONNECTING CORRIDOR (G+6) 10 J ENTRANCE GATE 3 NOS

4 D HOSPITAL KITCHEN 11 K C.C. ROAD

5 E AC PLANT ROOM 12 L PARKING

6 F GAS MANIFOLD 13 M MEDICAL COLLAGE (G+4)

7 G E.S.S. 14 N UG BOYS HOSTEL (G+4)


ABSTRACT ESTIMATE FOR CIVIL WORKS
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all
1 operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20
B(APSS 308)
A B C D E F G H I J K L M N O
12205.68 0.00 183.75 766.64 850.50 180.00 862.41 849.61 1922.80 84.96 117.21 6599.55 1598.40 1864.80 28086.31 CUM 1 ONE CUM 130.00 3651220.30
P Q R S T U V W X Y Z AA AB AC AD

AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS

Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and 3m to 6m depth including all
2
operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20
B(APSS 308) A B C D E F G H I J K L M N O
1373.67 377.62 0.00 0.00 0.00 1751.29 CUM 1 ONE CUM 148.00 259190.92
P Q R S T U V W X Y Z AA AB AC AD

AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS

Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming
3
including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS
NO.309&310) A B C D E F G H I J K L M N O
3971.57 0.00 183.75 766.64 850.50 180.00 837.47 389.00 6599.55 1598.40 1864.80 17241.68 CUM 1 ONE CUM 40.00 689667.20
P Q R S T U V W X Y Z AA AB AC AD

AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS

4 Conveyance of un-useful excavated earth to a distance of 5 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.
A B C D E F G H I J K L M N O
9607.78 838.23 0.00 0.00 0.00 10446.01 CUM 1 ONE CUM 113.00 1180399.13
P Q R S T U V W X Y Z AA AB AC AD

AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

Filling with carted coarse sand Under Floor with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour
1 charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)
A B C D E F G H I J K L M N O
0.00 12.06 78.15 101.99 21.76 29.51 1023.96 77.34 91.68 1436.45 CUM 1 ONE CUM 1041.00 1495344.45
P Q R S T U V W X Y Z AA AB AC AD

AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS

Supply and placing of Vibrated Plain Cement Concrete M 10 grade for foundations using 40mm, 20mm and 10mm size machine crushed hard granite metal (coarse aggregate) in (2:2:1) ratio from
1 approved quarry using batching and mixing plant of 15 cum - 20 cum per hour capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all
operational, incidental and labour charges, transporting concrete in transit mixer, vibrating, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402)
A B C D E F G H I J K L M N O
382.89 0.00 4.41 22.14 30.31 5.14 47.20 23.05 58.49 2.26 175.81 116.34 130.02 46.52 54.05 1098.63 CUM 1 ONE CUM 4197.00 4610950.11

Supply and placing of Plain Cement Concrete M 7.5 grade for foundations using coarse aggregate 40mm size hard, machine crushed granite from approved quarry using batching and mixing plant of
15 cum - 20 cum per hour capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all operational, incidental and labour charges, transporting
2
concrete in transit mixer, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402)

A B C D E F G H I J K L M N O
27.57 0.00 8.04 55.07 68.70 15.42 19.68 685.93 54.80 64.35 999.56 CUM 1 ONE CUM 3624.00 3622405.44

Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using batching and mixing plant of 15 cum - 20 cum
per hour capacity with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of
3 all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including
all operational, incidental and labour charges, transporting concrete in transit mixer, lifting concrete mechanically, laying concrete using concrete pump, curing etc., and overheads & contractors profit complete
but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)
A B C D E F G H I J K L M N O
Footings / Pile Caps 1180.81 0.00 18.00 67.76 94.50 11.93 46.61 50.47 91.58 6.75 959.25 221.76 258.72 3008.14 CUM 1 ONE CUM 7853.00 23622923.42

A B C D E F G H I J K L M N O
Plinth & Tie Beams 0.00 9.26 32.99 34.17 11.62 15.24 114.82 2.43 330.97 49.39 56.02 656.91 CUM 1 ONE CUM 8524.00 5599500.84

A B C D E F G H I J K L M N O
Base slab for Sump, STP & ETP 218.27 0.00 25.80 570.00 56.82 67.50 938.39 CUM 1 ONE CUM 7166.00 6724466.91

Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed
hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc.,
4 to site, centering using casurina ballies, bamboos, wooden reapers, runners, wood posts, wall plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of
concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

Columns
un supported height up to 3.66 m
A B C D E F G H I J K L M N O
UP TO PL/Basement Floor 162.81 0.00 2.90 14.49 7.56 2.77 4.32 18.55 1.09 522.33 22.68 26.46 785.96 CUM 1 ONE CUM 11673.00 9174549.19

A B C D E F G H I J K L M N O
Ground Floor : 13.23 4.73 7.56 1.70 46.87 2.92 45.36 52.92 175.29 CUM 1 ONE CUM 11673.00 2046160.17

A B C D E F G H I J K L M N O
First Floor : 2.88 37.80 44.10 84.78 CUM 1 ONE CUM 11928.00 1011255.84
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
A B C D E F G H I J K L M N O
Second Floor : 37.80 44.10 81.90 CUM 1 ONE CUM 12183.00 997787.70

A B C D E F G H I J K L M N O
Third Floor : 37.80 44.10 81.90 CUM 1 ONE CUM 12438.00 1018672.20

A B C D E F G H I J K L M N O
Fourth Floor : 37.80 44.10 81.90 CUM 1 ONE CUM 12693.00 1039556.70

A B C D E F G H I J K L M N O
Fifth Floor : 24.41 44.10 68.51 CUM 1 ONE CUM 12950.00 887236.88

A B C D E F G H I J K L M N O
Sixth Floor : 44.10 44.10 CUM 1 ONE CUM 13205.00 582340.50

A B C D E F G H I J K L M N O
Seventh Floor : 44.10 44.10 CUM 1 ONE CUM 13460.00 593586.00

A B C D E F G H I J K L M N O
Eighth Floor : 26.67 26.67 CUM 1 ONE CUM 13714.00 365752.38

Roof Beams
un supported height up to 3.66 m
A B C D E F G H I J K L M N O
Basement Floor 319.55 319.55 SQM 1 ONE SQM 10951.00 3499392.05

A B C D E F G H I J K L M N O
Ground Floor : 45.56 11.62 15.24 29.34 55.90 65.60 223.26 CUM 1 ONE CUM 10951.00 2444920.26

A B C D E F G H I J K L M N O
First Floor : 3.69 53.97 66.13 123.79 CUM 1 ONE CUM 11417.00 1413310.43

A B C D E F G H I J K L M N O
Second Floor : 53.97 66.13 120.10 CUM 1 ONE CUM 11883.00 1427148.30

A B C D E F G H I J K L M N O
Third Floor : 53.97 66.13 120.10 CUM 1 ONE CUM 12349.00 1483114.90

A B C D E F G H I J K L M N O
Fourth Floor : 53.97 66.13 120.10 CUM 1 ONE CUM 12815.00 1539081.50

A B C D E F G H I J K L M N O
Fifth Floor : 14.60 66.13 80.73 CUM 1 ONE CUM 13281.00 1072175.13

A B C D E F G H I J K L M N O
Sixth Floor : 66.13 66.13 CUM 1 ONE CUM 13746.00 909022.98

A B C D E F G H I J K L M N O
Seventh Floor : 66.13 66.13 CUM 1 ONE CUM 14212.00 939839.56

A B C D E F G H I J K L M N O
Eighth Floor : 14.60 14.60 CUM 1 ONE CUM 14678.00 214298.80
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Roof Slab 150mm thick
un supported height up to 3.66 m
A B C D E F G H I J K L M N O
Basement Floor 2706.26 2706.26 SQM 1 ONE SQM 1514.00 4097277.64

A B C D E F G H I J K L M N O
Ground Floor : 378.56 679.93 157.05 196.76 50.46 490.75 591.48 2544.99 SQM 1 ONE SQM 1514.00 3853114.86

A B C D E F G H I J K L M N O
First Floor : 57.76 443.11 534.64 1035.51 SQM 1 ONE SQM 1578.00 1634034.78

A B C D E F G H I J K L M N O
Second Floor : 443.11 534.64 977.75 SQM 1 ONE SQM 1640.00 1603510.00

A B C D E F G H I J K L M N O
Third Floor : 443.11 534.64 977.75 SQM 1 ONE SQM 1704.00 1666086.00

A B C D E F G H I J K L M N O
Fourth Floor : 443.11 534.64 977.75 SQM 1 ONE SQM 1766.00 1726706.50

A B C D E F G H I J K L M N O
Fifth Floor : 93.39 534.64 628.03 SQM 1 ONE SQM 1830.00 1149294.90

A B C D E F G H I J K L M N O
Sixth Floor : 534.64 534.64 SQM 1 ONE SQM 1894.00 1012608.16

A B C D E F G H I J K L M N O
Seventh Floor : 534.64 534.64 SQM 1 ONE SQM 1956.00 1045755.84

A B C D E F G H I J K L M N O
Eighth Floor : 93.39 93.39 SQM 1 ONE SQM 2019.00 188554.41

Roof Slab 200mm thick


un supported height up to 3.66 m
A B C D E F G H I J K L M N O
Basement Floor 362.82 362.82 SQM 1 ONE SQM 1887.00 684641.34

A B C D E F G H I J K L M N O
Ground Floor : 104.84 104.84 209.68 SQM 1 ONE SQM 1887.00 395666.16

A B C D E F G H I J K L M N O
First Floor : 104.84 94.58 199.42 SQM 1 ONE SQM 1964.00 391660.88

A B C D E F G H I J K L M N O
Second Floor : 104.84 94.58 199.42 SQM 1 ONE SQM 2041.00 407016.22

A B C D E F G H I J K L M N O
Third Floor : 104.84 94.58 199.42 SQM 1 ONE SQM 2118.00 422371.56

A B C D E F G H I J K L M N O
Fourth Floor : 78.38 94.58 172.96 SQM 1 ONE SQM 2194.00 379474.24

A B C D E F G H I J K L M N O
Fifth Floor : 0.00 94.58 94.58 SQM 1 ONE SQM 2272.00 214885.76
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

A B C D E F G H I J K L M N O
Sixth Floor : 94.58 94.58 SQM 1 ONE SQM 2348.00 222073.84

A B C D E F G H I J K L M N O
Seventh Floor : 94.58 94.58 SQM 1 ONE SQM 2424.00 229261.92

A B C D E F G H I J K L M N O
Eighth Floor : 0.00 SQM 1 ONE SQM 2501.00 0.00

Lintels
A B C D E F G H I J K L M N O
Basement Floor 1.03 1.03 CUM 1 ONE CUM 11594.00 11941.82

A B C D E F G H I J K L M N O
Ground Floor : 2.96 0.69 0.53 1.76 0.06 25.09 2.93 3.68 37.70 CUM 1 ONE CUM 11594.00 437093.80

A B C D E F G H I J K L M N O
First Floor : 25.33 2.91 3.92 32.16 CUM 1 ONE CUM 11776.00 378716.16

A B C D E F G H I J K L M N O
Second Floor : 26.26 2.91 3.92 33.09 CUM 1 ONE CUM 11957.00 395657.13

A B C D E F G H I J K L M N O
Third Floor : 17.91 2.91 3.92 24.74 CUM 1 ONE CUM 12140.00 300343.60

A B C D E F G H I J K L M N O
Fourth Floor : 6.98 2.91 3.92 13.81 CUM 1 ONE CUM 12321.00 170153.01

A B C D E F G H I J K L M N O
Fifth Floor : 3.59 0.49 3.92 8.00 CUM 1 ONE CUM 12502.00 100016.00

A B C D E F G H I J K L M N O
Sixth Floor : 3.92 3.92 CUM 1 ONE CUM 12684.00 49721.28

A B C D E F G H I J K L M N O
Seventh Floor : 3.92 3.92 CUM 1 ONE CUM 12865.00 50430.80

A B C D E F G H I J K L M N O
Eighth Floor : 0.38 0.38 CUM 1 ONE CUM 13046.00 4957.48

Wall 200 mm thick


A B C D E F G H I J K L M N O
UP to PL/Basement Floor : 671.43 0.00 0.00 0.00 0.00 671.43 SQM 1 ONE SQM 3000.00 2014296.00

A B C D E F G H I J K L M N O
Ground Floor : 15.44 0.00 0.78 16.22 SQM 1 ONE SQM 3000.00 48660.00

A B C D E F G H I J K L M N O
First Floor : 15.97 0.00 0.78 54.19 70.94 SQM 1 ONE SQM 3069.00 217714.86

A B C D E F G H I J K L M N O
Second Floor : 14.56 0.00 0.78 15.34 SQM 1 ONE SQM 3139.00 48152.26
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
A B C D E F G H I J K L M N O
Third Floor : 16.55 0.00 0.78 17.33 SQM 1 ONE SQM 3208.00 55594.64

A B C D E F G H I J K L M N O
Fourth Floor : 15.98 0.00 0.78 16.76 SQM 1 ONE SQM 3278.00 54939.28

A B C D E F G H I J K L M N O
Fifth Floor : 14.09 0.00 0.78 140.44 46.12 201.43 SQM 1 ONE SQM 3347.00 674186.21

A B C D E F G H I J K L M N O
Sixth Floor : 9.36 11.34 0.78 21.48 SQM 1 ONE SQM 3417.00 73397.16

A B C D E F G H I J K L M N O
Seventh Floor : 0.58 0.49 46.12 47.19 SQM 1 ONE SQM 3486.00 164504.34

Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using batching and mixing plant of 15 cum - 20 cum per hour capacity with
20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges,
5
transporting concrete in transit mixer, lifting concrete mechanically, laying concrete using concrete pump, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)

Columns
un supported height up to 4.27 m
A B C D E F G H I J K L M N O
Ground Floor : 193.02 0.00 5.67 26.46 773.22 998.37 CUM 1 ONE CUM 13173.00 13151470.31

A B C D E F G H I J K L M N O
First Floor : 187.35 0.00 5.67 773.22 966.24 CUM 1 ONE CUM 13558.00 13100222.54

A B C D E F G H I J K L M N O
Second Floor 178.42 0.00 5.40 396.42 580.24 CUM 1 ONE CUM 13941.00 8089187.18

A B C D E F G H I J K L M N O
Third Floor : 178.42 0.00 5.40 336.88 520.70 CUM 1 ONE CUM 14326.00 7459553.93

A B C D E F G H I J K L M N O
Fourth Floor : 187.35 0.00 5.40 302.57 495.31 CUM 1 ONE CUM 14709.00 7285568.04

A B C D E F G H I J K L M N O
Fifth Floor : 187.35 0.00 5.67 77.82 270.84 CUM 1 ONE CUM 15094.00 4088038.13

A B C D E F G H I J K L M N O
Sixth Floor : 168.48 233.75 5.40 407.63 CUM 1 ONE CUM 15478.00 6309322.21

A B C D E F G H I J K L M N O
Seventh Floor : 67.53 60.48 128.01 CUM 1 ONE CUM 15862.00 2030454.17

Roof Beams
un supported height up to 4.27 m
A B C D E F G H I J K L M N O
Ground Floor 284.08 0.00 12.34 32.99 11.92 417.92 759.25 CUM 1 ONE CUM 11698.00 8881706.50

A B C D E F G H I J K L M N O
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
First Floor 284.08 0.00 12.34 439.40 735.82 CUM 1 ONE CUM 12021.00 8845292.22

A B C D E F G H I J K L M N O
Second Floor 284.08 0.00 12.34 427.44 723.86 CUM 1 ONE CUM 12342.00 8933880.12

A B C D E F G H I J K L M N O
Third Floor : 284.08 0.00 12.34 307.94 604.36 CUM 1 ONE CUM 12665.00 7654219.40

A B C D E F G H I J K L M N O
Fourth Floor: 284.08 0.00 12.34 9.81 306.23 CUM 1 ONE CUM 12988.00 3977315.24

A B C D E F G H I J K L M N O
Fifth Floor : 284.08 0.00 12.34 69.74 366.16 CUM 1 ONE CUM 13311.00 4873955.76

A B C D E F G H I J K L M N O
Sixth Floor : 188.36 263.00 12.34 463.70 CUM 1 ONE CUM 13632.00 6321158.40

A B C D E F G H I J K L M N O
Seventh Floor : 51.97 42.32 94.29 CUM 1 ONE CUM 13955.00 1315816.95

Roof Slab 150mm thick


un supported height up to 4.27 m
A B C D E F G H I J K L M N O
Ground Floor 2380.15 0.00 80.37 378.56 6412.58 9251.66 SQM 1 ONE SQM 1549.00 14330821.34

A B C D E F G H I J K L M N O
First Floor 2221.06 0.00 80.37 3751.37 6052.80 SQM 1 ONE SQM 1587.00 9605793.60

A B C D E F G H I J K L M N O
Second Floor 2200.62 0.00 80.37 4208.72 6489.71 SQM 1 ONE SQM 1625.00 10545778.75

A B C D E F G H I J K L M N O
Third Floor : 2190.07 0.00 80.37 2566.24 4836.68 SQM 1 ONE SQM 1663.00 8043398.84

A B C D E F G H I J K L M N O
Fourth Floor: 2201.78 0.00 80.37 1478.08 3760.23 SQM 1 ONE SQM 1701.00 6396151.23

A B C D E F G H I J K L M N O
Fifth Floor : 2344.05 0.00 80.37 582.98 3007.40 SQM 1 ONE SQM 1741.00 5235883.40

A B C D E F G H I J K L M N O
Sixth Floor : 1569.09 2204.51 80.37 3853.97 SQM 1 ONE SQM 1779.00 6856212.63

A B C D E F G H I J K L M N O
Seventh Floor : 322.24 310.22 632.46 SQM 1 ONE SQM 1817.00 1149179.82

Roof Slab 200mm thick


un supported height up to 4.27 m
A B C D E F G H I J K L M N O
Ground Floor 285.68 0.00 194.66 184.00 664.34 SQM 1 ONE SQM 1828.00 1214413.52

A B C D E F G H I J K L M N O
First Floor 285.68 0.00 184.00 469.68 SQM 1 ONE SQM 1866.00 876422.88
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
A B C D E F G H I J K L M N O
Second Floor 285.68 0.00 184.00 469.68 SQM 1 ONE SQM 1904.00 894270.72

A B C D E F G H I J K L M N O
Third Floor : 285.68 0.00 115.83 401.51 SQM 1 ONE SQM 1942.00 779732.42

A B C D E F G H I J K L M N O
Fourth Floor: 285.68 0.00 69.93 355.61 SQM 1 ONE SQM 1981.00 704463.41

A B C D E F G H I J K L M N O
Fifth Floor : 285.68 0.00 285.68 SQM 1 ONE SQM 2020.00 577073.60

A B C D E F G H I J K L M N O
Sixth Floor : 138.40 150.78 289.18 SQM 1 ONE SQM 2059.00 595421.62

Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using using batching and mixing plant of 15 cum - 20 cum per hour capacity
with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand), coarse aggregate, water etc., to site, centering using casurina ballies , bamboos , wooden reapers , runners , wood posts , wall plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at
6
free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically laying concrete, curing, overheads & contractors
profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903)

A B C D E F G H I J K L M N O
Ground Floor 146.40 0.00 15.00 42.20 112.00 10.65 22.50 270.14 34.51 59.10 712.50 RM 1 ONE RM 484.00 344850.00

A B C D E F G H I J K L M N O
First Floor 152.20 0.00 15.00 279.04 34.51 59.10 539.85 RM 1 ONE RM 501.00 270464.85

A B C D E F G H I J K L M N O
Second Floor 155.00 0.00 15.00 288.32 34.51 59.10 551.93 RM 1 ONE RM 518.00 285899.74

A B C D E F G H I J K L M N O
Third Floor : 152.50 0.00 15.00 214.77 34.51 59.10 475.88 RM 1 ONE RM 534.00 254119.92

A B C D E F G H I J K L M N O
Fourth Floor: 158.00 0.00 15.00 86.10 34.51 59.10 352.71 RM 1 ONE RM 551.00 194343.21

A B C D E F G H I J K L M N O
Fifth Floor : 158.00 0.00 15.00 74.70 0.00 59.10 306.80 RM 1 ONE RM 568.00 174262.40

A B C D E F G H I J K L M N O
Sixth Floor : 122.40 129.20 15.00 59.10 325.70 RM 1 ONE RM 584.00 190208.80

A B C D E F G H I J K L M N O
Seventh Floor : 59.10 59.10 RM 1 ONE RM 601.00 35519.10

Masonry work in CM(1:6) prop (Cement : Sand) in substructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm.
7 including cost and conveyance of all materials like cement, sand, fly ash cement / lime solid blocks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing,
overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).
A B C D E F G H I J K L M N O
147.03 0.00 9.04 28.65 17.94 13.50 92.31 125.61 36.28 41.62 511.98 CUM 1 ONE CUM 6766.00 3464056.68
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Masonry work in CM(1:6) prop (Cement : Sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of
8 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges,
curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).
A B C D E F G H I J K L M N O
Ground Floor 769.34 0.00 37.83 127.56 97.01 55.60 64.40 12.85 430.57 919.30 118.54 137.84 2770.84 CUM 1 ONE CUM 7333.00 20318565.50

A B C D E F G H I J K L M N O
First Floor 746.76 0.00 37.83 23.52 874.53 104.42 134.93 1921.99 CUM 1 ONE CUM 7767.00 14928120.99

A B C D E F G H I J K L M N O
Second Floor 724.84 0.00 35.42 878.87 104.42 134.93 1878.48 CUM 1 ONE CUM 8200.00 15403532.11

A B C D E F G H I J K L M N O
Third Floor : 705.68 0.00 35.42 694.55 104.42 134.93 1675.00 CUM 1 ONE CUM 8634.00 14461959.93

A B C D E F G H I J K L M N O
Fourth Floor: 712.36 0.00 35.42 461.01 104.42 134.93 1448.14 CUM 1 ONE CUM 9068.00 13131718.78

A B C D E F G H I J K L M N O
Fifth Floor : 756.97 0.00 37.83 177.57 66.11 134.93 1173.41 CUM 1 ONE CUM 9502.00 11149729.94

A B C D E F G H I J K L M N O
Sixth Floor : 526.40 578.35 35.42 134.93 1275.10 CUM 1 ONE CUM 9936.00 12669393.60

A B C D E F G H I J K L M N O
Seventh Floor : 245.96 164.11 12.06 134.93 557.06 CUM 1 ONE CUM 10370.00 5776712.20

A B C D E F G H I J K L M N O
Eighth Floor : 73.25 73.25 CUM 1 ONE CUM 10804.00 791393.00

Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size
23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar
9 joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, all operational, incidental charges such as labour charges for mixing
cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work.
(APSS No. of 501 & 509)
A B C D E F G H I J K L M N O
Ground Floor 1532.30 0.00 216.65 26.82 21.55 0.00 2438.43 388.95 503.08 5127.78 SQM 1 ONE SQM 1035.00 5307252.30

A B C D E F G H I J K L M N O
First Floor 1631.19 0.00 3382.62 346.29 380.51 5740.61 SQM 1 ONE SQM 1116.00 6406520.76

A B C D E F G H I J K L M N O
Second Floor 1189.99 0.00 2985.93 346.29 380.51 4902.72 SQM 1 ONE SQM 1198.00 5873458.56

A B C D E F G H I J K L M N O
Third Floor : 1559.76 0.00 2197.93 346.29 380.51 4484.49 SQM 1 ONE SQM 1279.00 5735662.71

A B C D E F G H I J K L M N O
Fourth Floor: 1171.27 0.00 566.35 346.29 380.51 2464.42 SQM 1 ONE SQM 1360.00 3351611.20

A B C D E F G H I J K L M N O
Fifth Floor : 1689.01 0.00 338.92 80.19 380.51 2488.63 CUM 1 ONE CUM 1441.00 3586115.83
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
A B C D E F G H I J K L M N O
Sixth Floor : 983.81 1520.65 380.51 2884.97 CUM 1 ONE CUM 1523.00 4393809.31

A B C D E F G H I J K L M N O
Seventh Floor : 225.38 224.07 380.51 829.96 CUM 1 ONE CUM 1604.00 1331255.84

A B C D E F G H I J K L M N O
Eighth Floor : 80.19 80.19 CUM 1 ONE CUM 1685.00 135120.15
Supply and placing of Plain Cement Concrete M 10 grade mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8)
10 from approved quarry using batching and mixing plant of 15 cum to 20 cum per hour capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all
operational, incidental and labour charges, transporting concrete in transit mixer, curing etc., and overheads & contractors profit complete for finished item of work for bed blocks and hold fasts (APSS No.
402)
A B C D E F G H I J K L M N O
Basement Floor 1.05 1.05 CUM 1 ONE CUM 4413.00 4633.65

A B C D E F G H I J K L M N O
Ground Floor 14.33 0.00 0.30 2.83 0.72 0.86 1.03 0.08 24.80 6.75 10.76 62.46 CUM 1 ONE CUM 4413.00 275635.98

A B C D E F G H I J K L M N O
First Floor 15.07 0.00 0.30 26.27 8.29 12.34 62.27 CUM 1 ONE CUM 4463.00 277911.01

A B C D E F G H I J K L M N O
Second Floor 12.33 0.00 0.30 27.40 8.29 12.34 60.66 CUM 1 ONE CUM 4512.00 273697.92

A B C D E F G H I J K L M N O
Third Floor : 15.47 0.00 0.30 19.17 8.29 12.34 55.57 CUM 1 ONE CUM 4562.00 253510.34

A B C D E F G H I J K L M N O
Fourth Floor: 13.33 0.00 0.30 6.87 8.29 12.34 41.13 CUM 1 ONE CUM 4611.00 189650.43

A B C D E F G H I J K L M N O
Fifth Floor : 13.12 0.00 0.30 3.02 0.96 12.34 29.74 CUM 1 ONE CUM 4661.00 138618.14

A B C D E F G H I J K L M N O
Sixth Floor : 7.81 13.56 0.30 12.34 34.01 CUM 1 ONE CUM 4710.00 160187.10

A B C D E F G H I J K L M N O
Seventh Floor : 0.57 0.32 12.34 13.23 CUM 1 ONE CUM 4760.00 62974.80

A B C D E F G H I J K L M N O
Eighth Floor : 1.02 1.02 CUM 1 ONE CUM 4809.00 4905.18

Supply and placing of Plain Cement Concrete M 20 grade using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry using
11 batching and mixing plant of 15 cum - 20 cum per hour capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, hire and labour charges for centering and scaffolding
including all operational, incidental and labour charges, transporting concrete in transit mixer, curing etc., and overheads & contractors profit complete for steps (APSS No. 402)

A B C D E F G H I J K L M N O
Basement Floor 4.14 4.14 CUM 1 ONE CUM 6210.00 25709.40

A B C D E F G H I J K L M N O
Ground Floor 4.68 0.00 0.78 48.47 4.33 4.33 62.59 CUM 1 ONE CUM 6210.00 388683.90

A B C D E F G H I J K L M N O
First Floor 4.68 0.00 31.73 2.33 2.33 41.07 CUM 1 ONE CUM 6259.00 257057.13
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
A B C D E F G H I J K L M N O
Second Floor 4.68 0.00 30.24 2.33 2.33 39.58 CUM 1 ONE CUM 6309.00 249710.22

A B C D E F G H I J K L M N O
Third Floor : 4.68 0.00 18.90 2.33 2.33 28.24 CUM 1 ONE CUM 6358.00 179549.92

A B C D E F G H I J K L M N O
Fourth Floor: 4.68 0.00 11.34 2.33 2.33 20.68 CUM 1 ONE CUM 6408.00 132517.44

A B C D E F G H I J K L M N O
Fifth Floor : 4.68 0.00 0.00 2.33 7.01 CUM 1 ONE CUM 6457.00 45263.57

A B C D E F G H I J K L M N O
Sixth Floor : 4.68 4.68 2.33 11.69 CUM 1 ONE CUM 6507.00 76066.83

A B C D E F G H I J K L M N O
Seventh Floor : 2.33 2.33 CUM 1 ONE CUM 6556.00 15275.48

Supply and placing of Reinforced Cement Concrete M 20 grade mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8)
from approved quarry using batching and mixing plant of 15 cum to 20 cum per hour capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, hire and
12 labour charges for centering and scaffolding including all operational, incidental and labour charges, transporting concrete in transit mixer, curing etc., and overheads & contractors profit complete but
excluding cost of steel and its fabrication charges for platforms, lofts and shelves. (APSS No. 402 & 403)
100mm thick platforms / lofts:
A B C D E F G H I J K L M N O
Ground Floor 14.12 0.00 33.70 9.05 21.30 21.30 99.47 SQM 1 ONE SQM 897.00 89224.59

A B C D E F G H I J K L M N O
First Floor 7.06 0.00 9.05 11.23 13.25 40.59 SQM 1 ONE SQM 931.00 37789.29

A B C D E F G H I J K L M N O
Second Floor 24.47 0.00 9.07 11.23 13.25 58.02 SQM 1 ONE SQM 964.00 55931.28

A B C D E F G H I J K L M N O
Third Floor : 11.81 0.00 5.90 11.23 13.25 42.19 SQM 1 ONE SQM 998.00 42105.62

A B C D E F G H I J K L M N O
Fourth Floor: 26.32 0.00 3.02 11.23 13.25 53.82 SQM 1 ONE SQM 1031.00 55488.42

A B C D E F G H I J K L M N O
Fifth Floor : 24.15 0.00 0.00 13.25 37.40 SQM 1 ONE SQM 1065.00 39831.00

A B C D E F G H I J K L M N O
Sixth Floor : 2.42 47.71 13.25 63.38 SQM 1 ONE SQM 1098.00 69591.24

A B C D E F G H I J K L M N O
Seventh Floor : 13.25 13.25 SQM 1 ONE SQM 1132.00 14999.00

Providing Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works including labour charges for straightening, cutting, bending to required
sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs
13 and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all
incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work.( APSS No.126)
A B C D E F G H I J K L M N O
UP TO PL/Basement 3784.48 0.00 36.64 158.09 396.81 93.08 149.85 224.79 452.28 18.56 4038.10 532.61 619.83 10505.12 QUI 1 ONE QUI 9434.00 99105302.08
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

A B C D E F G H I J K L M N O
Ground Floor 1525.21 0.00 51.00 190.38 4007.69 319.00 373.18 6466.46 QUI 1 ONE QUI 9434.00 61004583.64

A B C D E F G H I J K L M N O
First Floor 1486.59 0.00 51.00 34.71 3645.78 286.46 339.48 5844.02 QUI 1 ONE QUI 9603.00 56120124.06

A B C D E F G H I J K L M N O
Second Floor 1458.94 0.00 50.26 2654.80 286.46 339.48 4789.94 QUI 1 ONE QUI 9773.00 46812083.62

A B C D E F G H I J K L M N O
Third Floor : 1458.61 0.00 50.26 1978.54 286.46 339.48 4113.35 QUI 1 ONE QUI 9942.00 40894925.70

A B C D E F G H I J K L M N O
Fourth Floor: 1460.94 0.00 50.26 1103.92 282.31 339.48 3236.91 QUI 1 ONE QUI 10111.00 32728397.01

A B C D E F G H I J K L M N O
Fifth Floor : 1504.15 0.00 51.00 444.82 117.96 339.48 2457.41 QUI 1 ONE QUI 10280.00 25262174.80

A B C D E F G H I J K L M N O
Sixth Floor : 1112.28 1469.49 50.26 339.48 2971.51 QUI 1 ONE QUI 10449.00 31049307.99

A B C D E F G H I J K L M N O
Seventh Floor : 360.95 311.56 339.48 1011.99 QUI 1 ONE QUI 10619.00 10746321.81

A B C D E F G H I J K L M N O
Eighth Floor : 124.09 124.09 QUI 1 ONE QUI 10788.00 1338682.92

Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with
14 cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges
such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work.( APSS No.126)
A B C D E F G H I J K L M N O
Ground Floor 45.97 0.00 6.50 0.80 0.65 0.00 73.15 11.67 15.09 153.83 QUI 1 ONE QUI 9076.00 1396161.08

A B C D E F G H I J K L M N O
First Floor 48.94 0.00 101.48 10.39 11.42 172.23 QUI 1 ONE QUI 9246.00 1592438.58

A B C D E F G H I J K L M N O
Second Floor 35.70 0.00 89.58 10.39 11.42 147.09 QUI 1 ONE QUI 9415.00 1384852.35

A B C D E F G H I J K L M N O
Third Floor : 46.79 0.00 65.94 10.39 11.42 134.54 QUI 1 ONE QUI 9584.00 1289431.36

A B C D E F G H I J K L M N O
Fourth Floor: 35.14 0.00 16.99 10.39 11.42 73.94 QUI 1 ONE QUI 9753.00 721136.82

A B C D E F G H I J K L M N O
Fifth Floor : 50.67 0.00 2.41 11.42 64.50 QUI 1 ONE QUI 9922.00 639969.00

A B C D E F G H I J K L M N O
Sixth Floor : 29.51 45.62 11.42 86.55 QUI 1 ONE QUI 10092.00 873462.60

A B C D E F G H I J K L M N O
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Seventh Floor : 6.76 6.72 11.42 24.90 QUI 1 ONE QUI 10261.00 255498.90

A B C D E F G H I J K L M N O
Eighth Floor : 2.41 2.41 QUI 1 ONE QUI 10430.00 25136.30

Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental
15
charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of
work.(SS 901,903 & 904) A B C D E F G H I J K L M N O
Basement Floor 3047.99 3047.99 SQM 1 ONE SQM 411.00 1252723.89

A B C D E F G H I J K L M N O
Ground Floor 2657.95 0.00 80.37 520.99 679.93 157.05 196.76 50.46 6780.63 524.82 620.37 12269.33 SQM 1 ONE SQM 411.00 5042693.62

A B C D E F G H I J K L M N O
First Floor 2486.82 0.00 80.37 4115.53 463.82 550.17 7696.71 SQM 1 ONE SQM 455.00 3502003.05

A B C D E F G H I J K L M N O
Second Floor 2466.38 0.00 80.37 4673.53 463.82 550.17 8234.27 SQM 1 ONE SQM 499.00 4108900.36

A B C D E F G H I J K L M N O
Third Floor : 2455.83 0.00 80.37 2799.66 463.82 550.17 6349.85 SQM 1 ONE SQM 543.00 3447970.71

A B C D E F G H I J K L M N O
Fourth Floor: 2467.54 0.00 80.37 1538.12 463.82 550.17 5100.02 SQM 1 ONE SQM 587.00 2993710.39

A B C D E F G H I J K L M N O
Fifth Floor : 2609.81 0.00 80.37 582.98 51.99 550.17 3875.32 SQM 1 ONE SQM 630.00 2441451.60

A B C D E F G H I J K L M N O
Sixth Floor : 1689.09 2365.79 80.37 550.17 4685.42 SQM 1 ONE SQM 674.00 3157973.08

A B C D E F G H I J K L M N O
Seventh Floor : 161.12 190.22 550.17 901.51 SQM 1 ONE SQM 718.00 647284.18

A B C D E F G H I J K L M N O
Eighth Floor : 51.99 51.99 SQM 1 ONE SQM 762.00 39616.38

Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of
16 all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing,
including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work for internal walls. (SS 901,903 & 904)
A B C D E F G H I J K L M N O
Basement Floor 2370.20 2370.20 SQM 1 ONE SQM 533.00 1263316.60

A B C D E F G H I J K L M N O
Ground Floor 6377.42 0.00 124.25 914.05 458.61 319.52 338.58 67.74 9274.15 1089.37 1591.99 20555.68 SQM 1 ONE SQM 533.00 10956178.24

A B C D E F G H I J K L M N O
First Floor 6380.49 0.00 124.25 10953.40 610.84 703.57 18772.55 SQM 1 ONE SQM 586.00 11000716.64

A B C D E F G H I J K L M N O
Second Floor 5728.40 0.00 113.53 10147.14 610.84 703.57 17303.48 SQM 1 ONE SQM 639.00 11056925.00

A B C D E F G H I J K L M N O
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Third Floor : 5952.37 0.00 113.53 7201.75 610.84 703.57 14582.06 SQM 1 ONE SQM 691.00 10076206.57

A B C D E F G H I J K L M N O
Fourth Floor: 5686.52 0.00 113.53 3000.79 610.84 703.57 10115.25 SQM 1 ONE SQM 744.00 7525742.28

A B C D E F G H I J K L M N O
Fifth Floor : 6612.92 0.00 124.25 802.23 191.29 703.57 8434.25 SQM 1 ONE SQM 797.00 6722097.25

A B C D E F G H I J K L M N O
Sixth Floor : 3729.95 5843.11 113.53 703.57 10390.16 SQM 1 ONE SQM 849.00 8821245.84

A B C D E F G H I J K L M N O
Seventh Floor : 583.02 377.33 703.57 1663.92 SQM 1 ONE SQM 902.00 1500855.84

A B C D E F G H I J K L M N O
Eighth Floor : 187.53 187.53 SQM 1 ONE SQM 954.00 178903.62

Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of
17 all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing,
including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work for exterior walls. (SS 901,903 & 904)
A B C D E F G H I J K L M N O
Ground Floor 2713.58 0.00 212.66 363.77 587.18 267.24 338.86 71.21 4401.36 25.92 4013.48 614.77 654.24 14264.27 SQM 1 ONE SQM 533.00 7602856.71

A B C D E F G H I J K L M N O
First Floor 2217.22 0.00 212.66 209.06 3513.18 495.32 558.09 7205.53 SQM 1 ONE SQM 586.00 4222442.92

A B C D E F G H I J K L M N O
Second Floor 2103.18 0.00 201.94 3517.46 495.32 558.09 6875.99 SQM 1 ONE SQM 639.00 4393758.89

A B C D E F G H I J K L M N O
Third Floor : 2105.35 0.00 201.94 3073.45 495.32 558.09 6434.15 SQM 1 ONE SQM 691.00 4446000.76

A B C D E F G H I J K L M N O
Fourth Floor: 2103.18 0.00 201.94 2283.71 495.32 558.09 5642.24 SQM 1 ONE SQM 744.00 4197822.84

A B C D E F G H I J K L M N O
Fifth Floor : 2212.44 0.00 212.66 1669.58 587.70 558.09 5240.46 SQM 1 ONE SQM 797.00 4176646.62

A B C D E F G H I J K L M N O
Sixth Floor : 2570.60 2032.94 201.94 558.09 5363.57 SQM 1 ONE SQM 849.00 4553670.93

A B C D E F G H I J K L M N O
Seventh Floor : 1784.82 1473.49 53.58 558.09 3869.98 SQM 1 ONE SQM 902.00 3490721.96

A B C D E F G H I J K L M N O
Eighth Floor : 633.48 633.48 SQM 1 ONE SQM 954.00 604339.92

Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing
admixture confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 100ml per one bag of cement, laid over roof slab when it is green, finished smooth with a
18
floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, operational,
incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit
complete for finished item of work. (APSS
A No. 901 B& 903). C D E F G H I J K L M N O
First Floor 567.57 709.03 162.34 217.71 50.46 1707.11 SQM 1 ONE SQM 602.00 1027680.22
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

A B C D E F G H I J K L M N O
over Third floor slab: 2306.56 2306.56 SQM 1 ONE SQM 696.00 1605365.76

A B C D E F G H I J K L M N O
over Fourth floor slab: 1533.48 1533.48 SQM 1 ONE SQM 743.00 1139375.64

A B C D E F G H I J K L M N O
over Fifth floor slab: 845.55 1671.43 527.32 3044.30 SQM 1 ONE SQM 790.00 2404997.00

A B C D E F G H I J K L M N O
over Sixth floor slab: 1868.80 2660.60 80.37 4609.77 SQM 1 ONE SQM 837.00 3858377.49

A B C D E F G H I J K L M N O
over Seventh floor slab: 629.82 629.82 SQM 1 ONE SQM 884.00 556760.88

Specialised high performance acrylic polymer modified elastomeric cementitious water proofing system coating to the wet area / tiolet / bath room:
a ) First Layer - Supply and Apply penetrative cum bonding primer as base primer cum sealer coat using MIXPRIME AC100 or equivalent modified with water and cement at the ratio 2:1:3 (MIXPRIME AC 100
: water : cement) by volume with a slow speed mixer machine. This compound shall be applied with sufficient thickness to cover the holes/pores/cracks @ 1.000 Liter / SQM (0.350 Lt of MIXPRIME AC100 /
SQM) and the raw primer should be complain with ASTM 4541 and the Solid content 49% +2% b ) Second Layer – Supply and apply of 2 x 2 mm welded with alkaline resistant coated / non-woven 40 Gsm
19 verging fiber mesh MIXMAT GFM 50 or equivalent for a minimum over lap of 100 mm embedded in the primer coat c ) Third Layer - Supply and apply of first coat of two component (Powder + Liquid) system
of high performance acrylic polymer modified elastomeric cementitious waterproofing system MIXGUARD AC or equivalent @ 1.000 Kg / SQM ( mix the powder and liquid with the help of a slow speed mixer
for a period of 2 to 3 minutes up to get a homogeneous mix- dilution or modification not recommended) should be complain with BS 1881 Part 5 1983 (ISAT 476 Part 6), DIN 1048 Part 5 1991, BSEN 12390-8
2000, ASTM D 412-92 d ) Fourth Layer –Supply and apply of second coat of two component (Powder + Liquid) system of high performance acrylic polymer modified elastomeric cementitious waterproofing
system MIXGUARD AC or equivalent @ 1.000 Kg / SQM ( mix the powder and liquid with the help of a slow speed mixer for a period of 2 to 3 minutes up to get a homogeneous mix- dilution or modification not
recommended) should be complain with BS 1881 Part 5 1983 (ISAT 476 Part 6), DIN 1048 Part 5 1991, BSEN 12390-8 2000, ASTM D 412-92.
Note: - 1 ) No dilution or modification recommended for item Nos.b,c,d and e 2 ) All materials should be procured as per the consumption with respect of the work order. 3 ) The application should be carried
out by an approved agency. 4 ) The contractor should provide 5 years material warrantee from the Manufacturer and 5 year warrantee from the applicator or combined
A B C D E F G H I J K L M N O
1081.91 274.23 1313.65 511.99 1046.27 4228.05 SQM 1 ONE SQM 593.00 2507230.69

Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall,sump bottom slab,in side of septic tank , in sunken slabs, Under Ground Tank etc. to required slopes
with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing admixture confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-
20 charge at 100ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary
including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering
smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).
A B C D E F G H I J K L M N O
671.43 718.72 0.00 1390.15 SQM 1 ONE SQM 403.00 560230.45

Flooring with non-skid red or white full body Ceramic floor tiles of size 300 mm x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any
colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab,
21 including neat cement slurry of honey like consistency spread @ 3.3 Kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like
cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)
A B C D E F G H I J K L M N O
Ground Floor 158.57 0.00 396.32 3.60 3.00 3.00 108.87 169.87 120.14 71.07 1034.44 SQM 1 ONE SQM 1056.00 1092371.33

A B C D E F G H I J K L M N O
First Floor 154.85 0.00 210.30 59.81 82.88 507.84 SQM 1 ONE SQM 1109.00 563194.56

A B C D E F G H I J K L M N O
Second Floor 81.85 0.00 179.13 59.81 82.88 403.67 SQM 1 ONE SQM 1161.00 468663.83

A B C D E F G H I J K L M N O
Third Floor : 221.47 0.00 170.58 59.81 82.88 534.74 SQM 1 ONE SQM 1214.00 649169.38
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

A B C D E F G H I J K L M N O
Fourth Floor: 79.12 0.00 61.93 59.81 82.88 283.74 SQM 1 ONE SQM 1266.00 359208.76

A B C D E F G H I J K L M N O
Fifth Floor : 131.97 0.00 0.00 82.88 214.85 SQM 1 ONE SQM 1319.00 283387.15

A B C D E F G H I J K L M N O
Sixth Floor : 70.95 210.67 82.88 364.50 SQM 1 ONE SQM 1371.00 499729.50

A B C D E F G H I J K L M N O
Seventh Floor : 82.88 82.88 SQM 1 ONE SQM 1424.00 118021.12

Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of Size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to
IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles
using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy
22 spread @ 3.3 kgs per sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles,
white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-
charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

A B C D E F G H I J K L M N O
Basement Floor 471.61 471.61 SQM 1 ONE SQM 1346.00 634787.06

A B C D E F G H I J K L M N O
Ground Floor 946.16 0.00 33.34 50.33 24.09 24.34 3349.99 328.67 492.23 5249.15 SQM 1 ONE SQM 1346.00 7065355.93

A B C D E F G H I J K L M N O
First Floor 1016.29 0.00 2441.91 383.30 462.11 4303.61 SQM 1 ONE SQM 1399.00 6020750.39

A B C D E F G H I J K L M N O
Second Floor 1120.89 0.00 3054.18 383.30 462.11 5020.48 SQM 1 ONE SQM 1451.00 7284722.28

A B C D E F G H I J K L M N O
Third Floor : 1241.48 0.00 1612.77 383.30 462.11 3699.66 SQM 1 ONE SQM 1503.00 5560585.34

A B C D E F G H I J K L M N O
Fourth Floor: 1319.54 0.00 961.07 383.30 462.11 3126.02 SQM 1 ONE SQM 1556.00 4864080.90

A B C D E F G H I J K L M N O
Fifth Floor : 904.47 0.00 522.93 31.29 462.11 1920.80 SQM 1 ONE SQM 1608.00 3088646.40

A B C D E F G H I J K L M N O
Sixth Floor : 843.36 1358.75 462.11 2664.22 SQM 1 ONE SQM 1661.00 4425269.42

A B C D E F G H I J K L M N O
Seventh Floor : 41.12 37.74 462.11 540.97 SQM 1 ONE SQM 1713.00 926681.61

A B C D E F G H I J K L M N O
Eigth Floor : 31.29 31.29 SQM 1 ONE SQM 1766.00 55258.14
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Flooring with 16 mm to 18 mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with
borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already
23 laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth
including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges, cost of base coat and overheads
& contractors profit complete for finished item of work (S.S.701 & special)

A B C D E F G H I J K L M N O
Basement Floor 179.51 179.51 SQM 1 ONE SQM 4070.00 730605.70

A B C D E F G H I J K L M N O
Ground Floor 850.13 0.00 80.37 28.50 3533.75 17.60 59.54 4569.89 SQM 1 ONE SQM 4070.00 18599439.07

A B C D E F G H I J K L M N O
First Floor 813.02 0.00 80.37 1082.42 1975.81 SQM 1 ONE SQM 4167.00 8233200.27

A B C D E F G H I J K L M N O
Second Floor 996.45 0.00 80.37 968.83 2045.65 SQM 1 ONE SQM 4263.00 8720605.95

A B C D E F G H I J K L M N O
Third Floor : 725.68 0.00 80.37 644.96 1451.01 SQM 1 ONE SQM 4360.00 6326394.88

A B C D E F G H I J K L M N O
Fourth Floor: 801.69 0.00 80.37 272.79 1154.85 SQM 1 ONE SQM 4457.00 5147184.28

A B C D E F G H I J K L M N O
Fifth Floor : 734.68 0.00 80.37 815.05 SQM 1 ONE SQM 4554.00 3711737.70

A B C D E F G H I J K L M N O
Sixth Floor : 486.66 506.14 80.37 1073.17 SQM 1 ONE SQM 4650.00 4990240.50

Flooring with 16 mm to 18 mm thick high polished granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) ,
20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste
24
mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges,
half rounding the edge , polishing charges, cost of base coat and overheads & contractors profit complete for finished item of work for platforms (S.S.701 & special)
A B C D E F G H I J K L M N O
Ground Floor 14.12 0.00 33.70 9.05 21.30 21.30 99.47 SQM 1 ONE SQM 4427.00 440353.69

A B C D E F G H I J K L M N O
First Floor 7.06 0.00 9.05 11.23 13.25 40.59 SQM 1 ONE SQM 4524.00 183629.16

A B C D E F G H I J K L M N O
Second Floor 24.47 0.00 9.07 11.23 13.25 58.02 SQM 1 ONE SQM 4620.00 268052.40

A B C D E F G H I J K L M N O
Third Floor : 11.81 0.00 5.90 11.23 13.25 42.19 SQM 1 ONE SQM 4717.00 199010.23

A B C D E F G H I J K L M N O
Fourth Floor: 26.32 0.00 3.02 11.23 13.25 53.82 SQM 1 ONE SQM 4814.00 259089.48

A B C D E F G H I J K L M N O
Fifth Floor : 24.15 0.00 0.00 13.25 37.40 SQM 1 ONE SQM 4910.00 183634.00

A B C D E F G H I J K L M N O
Sixth Floor : 2.42 47.71 50.13 SQM 1 ONE SQM 5007.00 251000.91
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

A B C D E F G H I J K L M N O
Seventh Floor : 13.25 13.25 SQM 1 ONE SQM 5104.00 67628.00

Providing window sills with 16 mm to 18 mm thick high polished granite stone slabs black colour as approved by the Engineer-in-Charge set over base coat of cement mortar (1:8) , 20mm thick using
screened sand over CC bed already laid including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching
25 shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge ,
polishing charges, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)
A B C D E F G H I J K L M N O
Ground Floor 46.84 0.00 44.90 5.55 7.30 104.59 SQM 1 ONE SQM 5776.00 604111.84

A B C D E F G H I J K L M N O
First Floor 48.91 0.00 44.88 4.39 4.33 102.51 SQM 1 ONE SQM 5872.00 601938.72

A B C D E F G H I J K L M N O
Second Floor 44.45 0.00 46.52 4.39 4.33 99.69 SQM 1 ONE SQM 5969.00 595049.61

A B C D E F G H I J K L M N O
Third Floor : 50.75 0.00 27.47 4.39 4.33 86.94 SQM 1 ONE SQM 6066.00 527378.04

A B C D E F G H I J K L M N O
Fourth Floor: 52.43 0.00 12.09 4.39 4.33 73.24 SQM 1 ONE SQM 6163.00 451378.12

A B C D E F G H I J K L M N O
Fifth Floor : 41.19 0.00 10.87 0.00 4.33 56.39 SQM 1 ONE SQM 6259.00 352945.01

A B C D E F G H I J K L M N O
Sixth Floor : 36.57 23.40 4.33 64.30 SQM 1 ONE SQM 6356.00 408690.80

A B C D E F G H I J K L M N O
Seventh Floor : 4.33 4.33 SQM 1 ONE SQM 6453.00 27941.49

Flooring with chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300mm x 300 mm and thickness 25 mm of any shades as approved by
Engineer - In - Charge set over base coat of cement mortar (1:6), 12 mm thick using screened sand over CC bed alredy laid or RCC roof slab including neat cement slurry of honey like consistency spread @
26 3.3 kgs per sqm and jointed with neat white cement to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water and tiles etc.,and overheads &
contractors profit complete for finished item of work.
A B C D E F G H I J K L M N O
Ground Floor 378.16 0.00 22.97 85.47 19.44 19.44 525.48 SQM 1 ONE SQM 1016.00 533887.68

A B C D E F G H I J K L M N O
First Floor 147.28 0.00 147.28 SQM 1 ONE SQM 1068.00 157295.04

A B C D E F G H I J K L M N O
Second Floor 147.28 0.00 147.28 SQM 1 ONE SQM 1120.00 164953.60

A B C D E F G H I J K L M N O
Third Floor : 147.28 0.00 147.28 SQM 1 ONE SQM 1173.00 172759.44

A B C D E F G H I J K L M N O
Fourth Floor: 147.28 0.00 147.28 SQM 1 ONE SQM 1225.00 180418.00

A B C D E F G H I J K L M N O
Fifth Floor : 147.28 0.00 147.28 SQM 1 ONE SQM 1278.00 188223.84
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

Vaccum dewatering cement concrete flooring 50mm thick using M 30 grade design mix corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete and required quantity of Chemical
Admixtures per 1 cum of concrete using batching and mixing plant of 15 cum - 20 cum per hour capacity with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970
27 and IS 2386 Part 1 to Part 8) from approved quarry in panels as per drawing / design, laid to proper level and slope including consolidating with power driven mechanical vibrators (both needle & screed
vibrators), dewatering by vacuum process "Tremix" method, floated with neat cement and power troweled to achieve smooth finishing, including MS Shuttering, finishing, rounding of the edges, curing
including cost and conveyance of all materials like cement, coarse aggregate, sand etc., to site, centering, shuttering, machine mixing, laying concrete, vibrating, curing, hire charges of all tools and plants, all
other incidental and operational charges, labour charges etc., complete for finished item of work.
A B C D E F G H I J K L M N O
2396.87 0.00 2396.87 SQM 1 ONE SQM 477.00 1143306.99

Providing 16 mm to 18 mm thick high polished leather finish granite stone slabs (steel grey or pearl black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not
less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread
28 @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to
work site and all operational, incidental labour & lift charges, full rounding the edges of treads , providing 3 grooves for the full length of treads , polishing charges, cost of base coat and overheads &
contractors profit complete for finished item of work for treads and risers (S.S.701 & special)
a) Treads of 0.30m wide :
A B C D E F G H I J K L M N O
Basement Floor 131.20 131.20 SQM 1 ONE SQM 6207.00 814358.40

A B C D E F G H I J K L M N O
Ground Floor 138.40 0.00 417.01 17.60 17.60 590.61 SQM 1 ONE SQM 6207.00 3665916.27

A B C D E F G H I J K L M N O
First Floor 138.40 0.00 353.89 15.53 15.53 523.35 SQM 1 ONE SQM 6304.00 3299198.40

A B C D E F G H I J K L M N O
Second Floor 138.40 0.00 308.80 15.53 15.53 478.26 SQM 1 ONE SQM 6400.00 3060864.00

A B C D E F G H I J K L M N O
Third Floor : 138.40 0.00 232.83 15.53 15.53 402.29 SQM 1 ONE SQM 6497.00 2613678.13

A B C D E F G H I J K L M N O
Fourth Floor: 138.40 0.00 140.13 15.53 15.53 309.59 SQM 1 ONE SQM 6594.00 2041436.46

A B C D E F G H I J K L M N O
Fifth Floor : 138.40 0.00 23.40 0.00 15.53 177.33 SQM 1 ONE SQM 6690.00 1186337.70

A B C D E F G H I J K L M N O
Sixth Floor : 138.40 137.60 15.53 291.53 SQM 1 ONE SQM 6787.00 1978614.11

A B C D E F G H I J K L M N O
Seventh Floor : 15.53 15.53 SQM 1 ONE SQM 6884.00 106908.52

b) Risers of 0.15m Height :


A B C D E F G H I J K L M N O
Basement Floor 30.00 30.00 SQM 1 ONE SQM 4471.00 134130.00

A B C D E F G H I J K L M N O
Ground Floor 33.60 0.00 70.50 6.73 6.73 117.56 SQM 1 ONE SQM 4471.00 525610.76

A B C D E F G H I J K L M N O
First Floor 33.60 0.00 84.02 5.69 5.69 129.00 SQM 1 ONE SQM 4591.00 592239.00

A B C D E F G H I J K L M N O
Second Floor 33.60 0.00 67.20 5.69 5.69 112.18 SQM 1 ONE SQM 4712.00 528592.16
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

A B C D E F G H I J K L M N O
Third Floor : 33.60 0.00 42.00 5.69 5.69 86.98 SQM 1 ONE SQM 4833.00 420374.34

A B C D E F G H I J K L M N O
Fourth Floor: 33.60 0.00 25.20 5.69 5.69 70.18 SQM 1 ONE SQM 4953.00 347601.54

A B C D E F G H I J K L M N O
Fifth Floor : 33.60 0.00 8.40 0.00 5.69 47.69 SQM 1 ONE SQM 5074.00 241979.06

A B C D E F G H I J K L M N O
Sixth Floor : 33.60 34.80 5.69 74.09 SQM 1 ONE SQM 5195.00 384897.55

A B C D E F G H I J K L M N O
Seventh Floor : 5.69 5.69 SQM 1 ONE SQM 5315.00 30242.35

Providing skirting 10 cm height with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of Size 600 x 600 mm and thickness between 8-10 mm of
29 any colour and finish in all shades and designs, length equal to flooring tiles, flushed to wall surface to set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water
etc.,and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)
A B C D E F G H I J K L M N O
Basement Floor 169.99 169.99 RM 1 ONE RM 134.00 22778.66

A B C D E F G H I J K L M N O
Ground Floor 760.01 0.00 51.62 28.26 56.25 31.40 335.00 265.35 344.82 1872.71 RM 1 ONE RM 134.00 250943.14

A B C D E F G H I J K L M N O
First Floor 787.73 0.00 244.19 390.61 469.70 1892.23 RM 1 ONE RM 139.00 263019.97

A B C D E F G H I J K L M N O
Second Floor 930.72 0.00 305.42 390.61 469.70 2096.45 RM 1 ONE RM 144.00 301888.80

A B C D E F G H I J K L M N O
Third Floor : 1038.03 0.00 161.28 390.61 469.70 2059.62 RM 1 ONE RM 150.00 308943.00

A B C D E F G H I J K L M N O
Fourth Floor: 965.40 0.00 96.11 390.61 469.70 1921.82 RM 1 ONE RM 155.00 297882.10

A B C D E F G H I J K L M N O
Fifth Floor : 686.51 0.00 52.29 38.12 469.70 1246.62 RM 1 ONE RM 160.00 199459.20

A B C D E F G H I J K L M N O
Sixth Floor : 439.76 966.40 469.70 1875.86 RM 1 ONE RM 165.00 309516.90

A B C D E F G H I J K L M N O
Seventh Floor : 44.88 42.10 469.70 556.68 RM 1 ONE RM 171.00 95192.28

A B C D E F G H I J K L M N O
Eighth Floor : 38.12 38.12 RM 1 ONE RM 176.00 6709.12

Providing cladding to walls with High Polished Granite 16 mm to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:3) 12
30 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth,
including cost of all materials like granite tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.
A B C D E F G H I J K L M N O
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Basement Floor 33.23 33.23 SQM 1 ONE SQM 4308.00 143154.84

A B C D E F G H I J K L M N O
Ground Floor 34.67 0.00 52.05 15.67 15.67 118.06 SQM 1 ONE SQM 4308.00 508602.48

A B C D E F G H I J K L M N O
First Floor 34.67 0.00 52.05 15.67 15.67 118.06 SQM 1 ONE SQM 4429.00 522887.74

A B C D E F G H I J K L M N O
Second Floor 32.74 0.00 52.05 15.67 15.67 116.13 SQM 1 ONE SQM 4550.00 528391.50

A B C D E F G H I J K L M N O
Third Floor : 32.74 0.00 52.05 15.67 15.67 116.13 SQM 1 ONE SQM 4670.00 542327.10

A B C D E F G H I J K L M N O
Fourth Floor: 32.74 0.00 52.05 15.67 15.67 116.13 SQM 1 ONE SQM 4791.00 556378.83

A B C D E F G H I J K L M N O
Fifth Floor : 34.67 0.00 0.00 15.67 50.34 SQM 1 ONE SQM 4912.00 247270.08

A B C D E F G H I J K L M N O
Sixth Floor : 32.74 21.34 15.67 69.75 SQM 1 ONE SQM 5032.00 350982.00

A B C D E F G H I J K L M N O
Seventh Floor : 15.67 15.67 SQM 1 ONE SQM 5153.00 80747.51

Providing dadooing with glazed red or white full body ceramic wall tiles of size 300mm x 450 mm / 320mm x 400mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts
31 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge flushed to wall surface set over base coat of CM(1:5) 12 mm thick using screened sand with
cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., and overheads & contractors profit complete for finished item of work.
A B C D E F G H I J K L M N O
Ground Floor 519.60 0.00 550.06 15.96 29.40 14.70 63.96 701.45 238.04 232.68 2365.85 SQM 1 ONE SQM 716.00 1693948.60

A B C D E F G H I J K L M N O
First Floor 529.42 0.00 800.77 172.83 279.73 1782.75 SQM 1 ONE SQM 729.00 1299624.75

A B C D E F G H I J K L M N O
Second Floor 245.77 0.00 828.72 172.83 279.73 1527.05 SQM 1 ONE SQM 742.00 1133071.10

A B C D E F G H I J K L M N O
Third Floor : 746.39 0.00 830.40 172.83 279.73 2029.35 SQM 1 ONE SQM 755.00 1532159.25

A B C D E F G H I J K L M N O
Fourth Floor: 233.59 0.00 245.16 172.83 279.73 931.31 SQM 1 ONE SQM 768.00 715246.08

A B C D E F G H I J K L M N O
Fifth Floor : 446.24 0.00 0.00 279.73 725.97 SQM 1 ONE SQM 768.00 557544.96

A B C D E F G H I J K L M N O
Sixth Floor : 197.05 702.72 279.73 1179.50 SQM 1 ONE SQM 781.00 921189.50

A B C D E F G H I J K L M N O
Seventh Floor : 279.73 279.73 SQM 1 ONE SQM 795.00 222385.35
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Providing dadooing with glazed full body porcelain wall tiles of size 300mm x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain
free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders and design as per the approved
32
pattern as approved by Engineer-in-Charge flushed to wall surface set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30
kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit
complete for finished item of work. A B C D E F G H I J K L M N O
Ground Floor 538.91 0.00 80.37 794.99 1414.27 SQM 1 ONE SQM 1304.00 1844208.08

A B C D E F G H I J K L M N O
First Floor 527.15 0.00 80.37 624.78 1232.30 SQM 1 ONE SQM 1357.00 1672231.10

A B C D E F G H I J K L M N O
Second Floor 537.14 0.00 80.37 624.78 1242.29 SQM 1 ONE SQM 1409.00 1750386.61

A B C D E F G H I J K L M N O
Third Floor : 482.98 0.00 80.37 624.78 1188.13 SQM 1 ONE SQM 1462.00 1737046.06

A B C D E F G H I J K L M N O
Fourth Floor: 492.69 0.00 80.37 420.84 993.90 SQM 1 ONE SQM 1514.00 1504764.60

A B C D E F G H I J K L M N O
Fifth Floor : 483.99 0.00 80.37 564.36 SQM 1 ONE SQM 1567.00 884352.12

A B C D E F G H I J K L M N O
Sixth Floor : 225.07 335.57 80.37 641.01 SQM 1 ONE SQM 1619.00 1037795.19

Supply and application of epoxy flooring of light green or light blue colour seamless joint free finish with 3mm thickness and anti slip & water washable chemical resistance durable and non particle
33
shedding with attractive finishing including cost and conveyance of all materials and all labour charges, overheads and contractor profit etc., complete for finished item of work.
A B C D E F G H I J K L M N O
Ground Floor 192.98 0.00 192.98 SQM 1 ONE SQM 1341.00 258786.18

A B C D E F G H I J K L M N O
First Floor 235.47 0.00 235.47 SQM 1 ONE SQM 1341.00 315765.27

A B C D E F G H I J K L M N O
Second Floor 0.00 SQM 1 ONE SQM 1341.00 0.00

A B C D E F G H I J K L M N O
Third Floor 0.00 SQM 1 ONE SQM 1341.00 0.00

A B C D E F G H I J K L M N O
Fifth Floor : 571.50 0.00 571.50 SQM 1 ONE SQM 1341.00 766381.50

Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels
34 of size not exceeding 1.50 m x 1.50 m, using glass strips and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand and water and
overheads & contractors profit complete for finished item of work. (APSS No.701 & 710)
A B C D E F G H I J K L M N O
Ground Floor 192.98 49.42 626.00 117.96 169.42 0.00 1155.78 SQM 1 ONE SQM 45.38 52449.27

A B C D E F G H I J K L M N O
First Floor 235.47 0.00 235.47 SQM 1 ONE SQM 489.00 115144.83

A B C D E F G H I J K L M N O
Second Floor 0.00 SQM 1 ONE SQM 523.00 0.00
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
A B C D E F G H I J K L M N O
Third Floor 0.00 SQM 1 ONE SQM 558.00 0.00

A B C D E F G H I J K L M N O
Fourth Floor 0.00 SQM 1 ONE SQM 593.00 0.00

A B C D E F G H I J K L M N O
Fifth Floor : 571.50 0.00 571.50 SQM 1 ONE SQM 628.00 358902.00

Providing plinth protection using plain Cement Concrete general purpose tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shade
for a width of 1200mm set over base coat of cement mortar (1:6), 12 mm thick using screened sand over M 5 mix bed 100mm thick along with drain constructed with 225 mm thick walls using fly ash cement /
35 lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. and plastering 2mm thick two coats with base coat of 8mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) for brick masonry drain, laying of tiles in between basement of the building and brick wall and as directed by the Engineer - in - charge including cost and conveyance of all
materials to site, all labour charges like mixing of cement concrete, laying, curing, overheads & contractor profit etc., complete for finished item of work.
A B C D E F G H I J K L M N O
409.64 0.00 109.20 100.80 45.94 61.96 551.31 100.94 114.46 1494.25 SQM 1 ONE SQM 3411.00 5096886.75

36 Filling with well burnt cinder aggregate as per IS:2686-1977 in sunken slabs including cost and conveyance of cinder, labour charges for filling, ramming, overheads and contractor profit etc.,
A B C D E F G H I J K L M N O
Ground Floor 32.48 53.57 86.05 CUM 1 ONE CUM 852.00 73314.60

A B C D E F G H I J K L M N O
First Floor 32.09 0.00 61.89 17.95 24.87 136.80 CUM 1 ONE CUM 856.00 117100.80

A B C D E F G H I J K L M N O
Second Floor 24.99 0.00 55.05 17.95 24.87 122.86 CUM 1 ONE CUM 860.00 105659.60

A B C D E F G H I J K L M N O
Third Floor : 61.72 0.00 49.90 17.95 24.87 154.44 CUM 1 ONE CUM 864.00 133436.16

A B C D E F G H I J K L M N O
Fourth Floor: 24.17 0.00 18.59 17.95 24.87 85.58 CUM 1 ONE CUM 868.00 74283.44

A B C D E F G H I J K L M N O
Fifth Floor : 28.77 0.00 0.00 24.87 53.64 CUM 1 ONE CUM 872.00 46774.08

A B C D E F G H I J K L M N O
Sixth Floor : 21.73 50.38 24.87 96.98 CUM 1 ONE CUM 875.00 84857.50

A B C D E F G H I J K L M N O
Seventh Floor : 24.87 24.87 CUM 1 ONE CUM 879.00 21860.73

Supplying and fixing of stainless steel (grade 304) hand railing as per approved drawing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick
37 medium class 1 No for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 25mm dia holes with pneumatic compressor for fixing railing, buffing,
polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour
charges , overheads & contractors profit etc., complete for finished item of work.
A B C D E F G H I J K L M N O
488.71 38.80 36.21 7.88 1083.42 64.02 106.08 1825.12 SQM 1 ONE SQM 3874.00 7070514.88

Supplying and fixing of stainless steel (grade 304) railing for ramp as per approved drawing with top rail of 50mm dia pipe and 2mm thick medium class fixed in to wall with 25mm dia pipe of 0.30m length
38 @ 1m centre to centre and welding, buffing, polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding
charges, cost of all consumables, labour charges , overheads & contractors profit etc., complete for finished item of work.
A B C D E F G H I J K L M N O
636.00 0.00 45.24 21.60 21.60 724.44 RM 1 ONE RM 1853.00 1342387.32
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Supplying and fixing of stainless steel (grade 304) grip bars 200mm length bars in toilets as per approved drawing with 25mm dia pipe with base plates 2 Nos., buffing, polishing thouroughly , lacquer
39 finishing to present seamless finish including cost and conveyance of all materials, labour charges , overheads & contractors profit etc., complete for finished item of work.
A B C D E F G H I J K L M N O
100.00 39.00 201.00 34.00 97.00 471.00 NOS. 1 ONE NO. 353.00 166263.00
Supply and fixing jallies ( cement concrete ) of 50mm thick as per the design approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc., overheads &
40
contractors profit complete for finished item of work.
A B C D E F G H I J K L M N O
Ground Floor 0.00 0.00 5.40 5.40 10.80 SQM 1 ONE SQM 883.00 9536.40

A B C D E F G H I J K L M N O
First Floor 0.00 0.00 9.00 9.00 18.00 SQM 1 ONE SQM 964.00 17352.00

A B C D E F G H I J K L M N O
Second Floor 0.00 9.00 9.00 18.00 SQM 1 ONE SQM 1045.00 18810.00

A B C D E F G H I J K L M N O
Third Floor : 0.00 9.00 9.00 18.00 SQM 1 ONE SQM 1095.00 19710.00

A B C D E F G H I J K L M N O
Fourth Floor: 0.00 9.00 9.00 18.00 SQM 1 ONE SQM 1145.00 20610.00

A B C D E F G H I J K L M N O
Fifth Floor : 0.00 0.00 9.00 9.00 SQM 1 ONE SQM 1195.00 10755.00

A B C D E F G H I J K L M N O
Sixth Floor : 0.00 9.00 9.00 SQM 1 ONE SQM 1182.00 10638.00

A B C D E F G H I J K L M N O
Seventh Floor : 367.20 9.00 376.20 SQM 1 ONE SQM 1263.00 475140.60

Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm with fixed /split type fan light of 500mm at the top fixed with 4mm thick pin headed glass
41 using 12mm x 12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross
bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides,
fixing 1mm thick mat finish laminated sheet to full width and height of the flush shutter both sides
including cost and conveyance to site of teak wood frame, flush shutter, laminate sheet including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked
Aluminium fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos.
door stoppers and 2 Nos. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the
shutter to the frame, fixing glass in fan light portion etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 in all floors (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (2000mm x 2600mm)
A B C D E F G H I J K L M N O
46.80 5.20 5.20 0.00 57.20 SQM 1 ONE SQM 6214.00 355440.80
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using 12mm x
42 12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross bands and face
veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, fixing 1mm
thick mat finish laminated sheet to full width and height of the flush shutter both sides
including cost and conveyance to site of teak wood frame, flush shutter, laminate sheet including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked
Alumimium fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos.
door stoppers and 2 Nos. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the
shutter to the frame, fixing glass in fan light portion etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in
flooring for a depth of not less than 10 mm) (1800mm x 2600mm)
A B C D E F G H I J K L M N O
415.80 90.72 506.52 SQM 1 ONE SQM 6516.00 3300484.32
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using
12mm x 12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross bands and
face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, fixing
43
1mm thick mat finish laminated sheet to full width and height of the flush shutter both sides

including cost and conveyance to site of teak wood frame, flush shutter, laminate sheet including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked
Alumimium fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos.
door stoppers and 2 Nos. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the
shutter to the frame, fixing glass in fan light portion etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in
flooring for a depth of not less than 10 mm) (1500mm x 2600mm)
A B C D E F G H I J K L M N O
358.80 110.55 3.15 472.50 SQM 1 ONE SQM 5117.00 2417782.50
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using
12mm x 12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross bands and
44
face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, fixing
1mm thick mat finish laminated sheet to full width and height of the flush shutter both sides
including cost and conveyance to site of teak wood frame, flush shutter, laminate sheet including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked
Aluminium fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos.
door stoppers and 2 Nos. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the
shutter to the frame, fixing glass in fan light portion etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 in all floors (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (1200mm x 2600mm)
A B C D E F G H I J K L M N O
489.84 24.96 3.12 76.55 12.60 10.08 617.15 SQM 1 ONE SQM 5548.00 3423948.20
Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using
45 12mm x 12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross bands and
face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, fixing
1mm thick mat finish laminated sheet to full width and height of the flush shutter both sides
including cost and conveyance to site of teak wood frame, flush shutter, laminate sheet including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked
Aluminium fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos.
door stoppers and 2 Nos. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the
shutter to the frame, fixing glass in fan light portion etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 in all floors (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (1000mm x 2600mm)
A B C D E F G H I J K L M N O
36.40 41.60 13.00 5.20 2.60 291.90 96.20 182.00 668.90 SQM 1 ONE SQM 5526.00 3696341.40

Supply and fixing of doors as per approved drawings with medium teak wood frame of section 100mm x 65 mm with split type fan light of 500mm at the top fixed with 4mm thick pin headed glass using
46 12mm x 12mm Teak Wood beading and 2 Nos. of 10mm MS Square bars and ISI marked flush door shutter of 30mm thick double shutters with bond wood solid block board type core having cross bands and
face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides, fixing
1mm thick mat finish laminated sheet to full width and height of the flush shutter both sides
including cost and conveyance to site of teak wood frame, flush shutter, laminate sheet including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked
Aluminium fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150mm long handles (IS:208), 2 Nos.
door stoppers and 2 Nos. Rubber / Nylon door stop bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the
shutter to the frame, fixing glass in fan light portion etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 in all floors (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (900mm x 2600mm)
A B C D E F G H I J K L M N O
217.62 51.48 9.36 4.68 23.40 91.26 159.12 556.92 SQM 1 ONE SQM 5766.00 3211200.72

Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type
47 Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal
lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked
Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long,
1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. Rubber / Nylon door stop bushes including PVC door cladding 1.50mm thick to the flush doors shutters pasted
with Fevicol complete as per direction of Engineer –in – charge, manufacturers specification and drawing to full height of the shutter inside including labour charges for fixing the frame in position, fixing the
shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less
than 10mm) (800mm x 2100mm) A B C D E F G H I J K L M N O
15.12 0.00 0.00 15.12 SQM 1 ONE SQM 5646.00 85367.52
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)

Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type
Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal
48
lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked
Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long,
1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. Rubber / Nylon door stop bushes including PVC door cladding 1.50mm thick to the flush doors shutters pasted
with Fevicol complete as per direction of Engineer –in – charge, manufacturers specification and drawing to full height of the shutter inside including labour charges for fixing the frame in position, fixing the
shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less
than 10mm) (600mm x 1800mm) A B C D E F G H I J K L M N O
4.32 0.00 0.00 4.32 SQM 1 ONE SQM 6977.00 30140.64

Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type
49 Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal
lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked
Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long,
1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. Rubber / Nylon door stop bushes including PVC door cladding 1.50mm thick to the flush doors shutters pasted
with Fevicol complete as per direction of Engineer –in – charge, manufacturers specification and drawing to full height of the shutter inside including labour charges for fixing the frame in position, fixing the
shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less
than 10mm) (450mm x 1800mm)
A B C D E F G H I J K L M N O
4.05 7.29 0.00 11.34 SQM 1 ONE SQM 8281.00 93906.54

Supplying and fixing single side prelam solid panel PVC door frame (Choukhat): Providing and fixing factory made Pac single side Prelam door frame of the size 50x7 mm with a wall thickness of 5mm,
made out of extruded 5mm rigid Pac single side prelam sheet, meter cut at two corners and joined with 2 Nos. of 150mm long brackets of 15 x 15mm MS Square tube. The two vertical door profiles are to be
50 reinforced with 19 x 19mm MS. square tube of 19 guage. The door frame shall be fixed to the wall using 65/100mm long MS. Screws through the frame by using Pac fasteners. a minimum of 4 Nos. of screws
to be provided for each vertical member and minimum 2nos. for horizontal member etc. complete as per manufacture specification and direction of Engineer-incharge including conveyance of all materials,
labour charges for fixing, overheads & contractors profit complete for finished item of work for door of size 800mm x 2100mm.
A B C D E F G H I J K L M N O
500.00 150.00 40.60 5.70 5.80 5.70 1005.00 145.00 465.00 2322.80 RM 1 ONE RM 500.00 1161400.00

Providing and fixing 30mm thick factory made moulded door shutter- wood free consisting of frame made out of MS. tubes 19gauge thickness and size of 25mmX25mm for styles, top and bottom rails.
MS. Frame shall have a coat of steel primers. The inner panel shall consist of 25mm thick high density EPS conforming to IS 4671-1984 bounded with 2mm thick termite proof, water proof and fire resistant
moulded Pac sheet with 2,4,6 raised panel design in different plain and / or pre-lam colours after routing to the moulded design on one side and 2mm plain and / or pre-lam Pac sheet on other side of the EPS.
51 The edge of panel to be sealed with lipping of 10mm wide PVC sheet bottom (made by sticking 2 rigid foam sheet of 5mm thickness using Pac solvent cement) and stiles sides 25mm(5mmX5) thick and 30mm
width Pac sheet fitted along MS tube for lock provision for lock height 5mm thick Pac sheet of size 150mmX100mm fixed with upper and lower face of inner side of EPS panel etc., complete as per direction of
Engineer – in-Charge, manufacture specification and drawing including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204)
of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. Rubber / Nylon door stop bushes including labour charges for fixing the shutter to frame etc., including overheads & contractors profit
A B C D E F G H I J K L M N O
168.00 50.40 11.76 1.58 1.68 1.58 337.68 48.72 156.24 777.64 SQM 1 ONE SQM 3746.00 2913039.44

Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing with fixed fan light of 500mm height at top door using aluminium sections of 101.60 mmm x 44.45mm ,
3.18 mm thick for frame and door shutter made of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick and bottom rail of 114.30mm x 44.45 mm , 3.18mm thick,powder coating of alluminium
52 sections 25mm microns thick, 5 mm thick plain float glass fitted with suitable aluminium glazing clips and rubber beading in fan light portion, double shutters fitted with 5mm thick frosted / ground glass in the
top half and MDF Board: interior-Both Side Laminated -12 mm thick in the bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double action hydraulic floor spring of
approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors including cost of cutting floors as required , embedding in floors
and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete (Weight Capacity up to 130 Kgs) as approved by Engineer-in-Charge including supply and fixing ISI
marked powder coated aluminium fixtures of 3 Nos. of butt hinges (IS:205) of 150mm long(for each shutter), 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium handles (IS:208) 150mm
dia and 2 Nos. aldrops (IS:2681) 300mm long including labour charges for manufacturing door , fixing the door with required No. of screws etc., including overheads & contractors profit complete for finished
item of work. (The Aluminium section used shall be standard make confirming to IS 1948 – 1961) and as approved by the Engineer) (2000mm x 2600mm)
A B C D E F G H I J K L M N O
26.00 9.60 0.00 0.00 35.60 SQM 1 ONE SQM 8069.00 287256.40

Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing with fixed fan light of 500mm height at top door using aluminium sections of 101.60 mmm x 44.45mm ,
3.18 mm thick for frame and door shutter made of styles , top and middle rail of 47.62mm x 44.45mm , 3.18 mm thick and bottom rail of 114.30mm x 44.45 mm , 3.18mm thick,powder coating of alluminium
53 sections 25mm microns thick, 5 mm thick plain float glass fitted with suitable aluminium glazing clips and rubber beading in fan light portion, double shutters fitted with 5mm thick frosted / ground glass in
the top half and MDF Board: interior-Both Side Laminated -12 mm thick in the bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double action hydraulic
floor spring of approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors including cost of cutting floors as required , embedding in floors
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete (Weight Capacity up to 130 Kgs) as approved by Engineer-in-Charge including supply and fixing ISI
marked powder coated aluminium fixtures of 3 Nos. of butt hinges (IS:205) of 150mm long(for each shutter), 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long , 4 Nos.alluminium handles (IS:208) 150mm
dia and 2 Nos. aldrops (IS:2681) 300mm long including labour charges for manufacturing door , fixing the door with required No. of screws etc., including overheads & contractors profit complete for finished
item of work in all floors. (The Aluminium section used shall be standard make confirming to IS 1948 – 1961) and as approved by the Engineer) (1500mm x 2600mm)

A B C D E F G H I J K L M N O
163.80 3.90 167.70 SQM 1 ONE SQM 9566.00 1604218.20

Supply and fixing powder coated alimunium sliding window with fixed fan light at top as per approved drawings with all required accessories such as stoppers,bolts,weather stripping etc. for all sizes and
sections in accordance with approved drawings and as per IS 1948-1961 with top section of window of size 62mm x 32mm ,1.47mm thick, window side frames of size 61.85mm x 31.75mm,1.50mm thick and
bottom frame size 61.85mm x 31.75mm,1.50mm thick sloping outwards for drainage and fixed and sliding shutters with bottom,sides and top with section of 40mm x 18mm ,1.70mm thick,inter locking section
54
40mm x 28mm x 18mm,1.60mm thick inter locked for weather scaling and mounted on nylon rollers of lift type and fan light top &side sections of size 63.50mmx38.10mm,1.53mm thick, powder coating of all
alluminium sections 25mm microns thick and fixing 5mm thick plain glass in fan light and 5mm thick ground glass for shutters fitted with alluminium glazing clips and rubber beading, powder coating of all
alluminium sections 25mm microns thick including cost and conveyance to site of powder coated aluminium sections, glass,
rubber beading , fixtures etc., including labour charges for manufacturing window, fixing in position using wooden blocks and sheet metal screws, overheads & contractors profit etc., complete for finished item
of work. (The aluminium sections used shall be standard make confirming to IS 1948-1961 and as approved by the Engineer and fixtures shall be of ISI marked)
A B C D E F G H I J K L M N O
100.16 63.48 163.64 SQM 1 ONE SQM 3955.00 647196.20

Providing & Fixing of Scientific Doors with metal door frames and door shutters made of galvanize steel (base steel as per IS 513 of 0.58 mm thick D quality, galvanized as per IS 277 with Zinc of 120
GSM)coated with Zinc Phosphate Primer to receive any paint on site or finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy
polyester powder for powder coating paint thickness 50-60 microns (Dry film thickness) outer frame section of 100 x 58 mm x 1.2 mm thick, shutter section of 0.80 mm thick galvanized steel sheet pressed (roll
55
formed) for 46mm thick fully flush, double skin door shell seam joints at stile edges, in-fill of honeycomb Kraft paper used to give the required rigidity and effective acoustic insulation with 6” Tower bolt – 1 No.,
6” D handles – 2 Nos., 10” Aldrops – 1 No., Butt Hinges – 3 Nos, Mortise Lock of approved quality – 1 No, frames fixed to the concrete/masonry wall by means of self expanding screws including overheads
and contractor profit etc.,complete for finished item of work for Single leaf Door
A B C D E F G H I J K L M N O
42.90 83.16 126.06 SQM 1 ONE SQM 11964.00 1508181.84

Supply & Fixing of Lead Lined Stainless steel Clean room door frames and shutters made of Stainless steel grade of 304 hairline finish, frame with 1.60mm (16SWG) thick hairline finish Stainless steel
grade of 304 formed to Single/double rebate profile of size 100 mm x 58mm/ 143 x 58 mm, door frames with a single / multi Layer of Lead sheet varying thickness from 3mm /1mm to 2mm depends on
56 radiation level, the shutter with 1.2 mm thick hairline finish Stainless steel grade of 304 formed to provide a 46mm thick fully flush, double skin door shell with Lock Seam joints at stile edges with a single /
multi Layer of Lead sheet varying thickness from 3mm /1mm to 2mm depends on radiation level. The lead sheets extend the full width and height of the door. Lead thickness is to be equal to the shielding in
the adjacent wall. Hardware can be provided with Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed flush to the frame and shutter etc., including overheads and contractor profit etc., complete for
finished item of work in all floors
A B C D E F G H I J K L M N O
39.78 98.80 138.58 SQM 1 ONE SQM 27495.00 3810257.10
Providing and fixing factory made uPVC white colour sliding glazed door comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2
mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVC extruded glazing beads, uPVC extruded
interlock and uPVC extruded Inline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi
57 point locking having transmission gear with keeps, zinc alloy (white powder coated) cresent lock (if required), stainless steel (SS 304 grade) body with adjustable double nylon rollers (weight bearing capacity
to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including
drilling of holes for fixing hardware and drainageof water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backer rod of required
size and of approved quality, all complete as per approved drawing & direction of Engineerin-Charge inclusive of cost of Single / double glass panes,wire mesh and silicon sealent, all materials, labour
charges for fixing, overheads and contractor profit etc., complete for finished item of work. Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile
Two track two panels sliding door made of (big series) frame 67 x 50 mm & sash 46 x 82 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate
A B C D E F G H I J K L M N O
63.00 13.14 91.49 8.82 15.44 191.89 SQM 1 ONE SQM 6987.00 1340735.43

Providing and fixing factory made uPVC white colour sliding glazed window upto 1.50 m in height dimension comprising of uPVC multi-chambered frame with in-built roller track and sash extruded
profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC
extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be
58 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of
holes for fixing hardware and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod of required size and of
approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent . Note: For uPVC frame and sash
extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall
Two track two panels sliding window made of frame 67 x 50 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension
A B C D E F G H I J K L M N O
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
475.20 6.48 479.22 0.00 0.00 960.90 SQM 1 ONE SQM 7310.00 7024179.00

Providing and fixing factory made uPVC white colour sliding glazed window comprising of uPVC multi-chambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2
mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded
interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing
59 frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware and drainage ofwater
etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality, all complete as per approved
drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent . Note: For uPVC frame and sash extruded profiles minus 5% tolerance in dimension
i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made.
Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels) made of frame 92 x 44 mm & sash 32 x 60 mmboth having wall thickness of 1.9 ± 0.2
A B C D E F G H I J K L M N O
1703.85 182.40 24.75 1226.49 216.24 405.57 3759.30 SQM 1 ONE SQM 9925.00 37311052.50

Providing and fixing 3 Track 3 Shutter Pre painted Steel sliding Window fabricated from roll formed sections made of Galvanized steel colour coated /powder coated (Base Steel as per IS 513 „D‟ quality
galvanized as per IS 277 with Zinc of 120 Gms./ Sq.mtr) with total coated thickness of 0.58mm. Primer Coat with epoxy primer of 5-7 microns thick, finished paint with a polyester paint of 12-16 microns thick
and back coated with Alkyd backer of 5-7 microns or powder coated with pure polyester powder up to 50-60 microns thick. The External Section for Three Track Three Sliding Shutter should be of 44 x
107mm with a provision for bottom track insert profile of 10x9 mm made of aluminium. Section for Window glass shutter should be of 35x49mm , Section for Window Euro groove should be of 25x24mm made
60
of plastic to accommodate standard accessories, and section for window lap strip should be of 21x4mm made of plastic. Section for Mesh Shutter should be of 35x49mm. The Window to be panelled with 4mm
thick pin headed glass. The gaskets are to be made of Ethyl Propylene Diamine Manomer [EPDM]. Corner Brackets for internal and external frame to be made of glass filled nylon. Touch lock to be provided
for Window Shutter. Sections are to be cut to length, joined and assembled by means of corner brackets. The above frame to be fixed to Brick/Concrete masonry by using Nylon self expanding caps and
driving MS electroplated 80mm screws into the caps through frames. The Grill for safety for windows to be made of 10mm thick square rod bars with 152mm pitch including cost and conveyance of all
A B C D E F G H I J K L M N O
36.86 4.73 6.54 23.46 71.59 SQM 1 ONE SQM 9077.00 649822.43

Supplying and fixing of MS doors, grill to windows, ventilators using MS angles, flat, square bars including cost and conveyance of all materials, cutting, bending, welding, all operational charges, labour
61 charges, overheads and contractor profit etc., complete for finished item of work.
A B C D E F G H I J K L M N O
32685.75 2833.20 371.25 552.90 70.88 98.10 351.90 5410.60 1620.00 25585.65 3348.60 6230.55 79159.38 KGS 1 ONE KG 122.00 9657444.36

Supply & Fixing of Powder Coated Fire Rated doors, frames & shutters made of Skin pass galvanized Iron sheet conforming to Base Steel as per IS 513 “D” Quality, Galvanized as per IS 277 with Hot
Zinc Coating of 120 grams / Sq.Mtr with powder coating of thickness 60-65 Microns, frame with 1.2mm thick Skin pass Galvanized Iron sheet formed to double rebate profile of ize 143 mm X 58 mm with
maximum bending radius of 1.4 mm and filled with in-fill Polyurethane foam, the Door Shutters are with 0.80 mm thick Skin pass Galvanized Iron Sheet formed to provide a 46 mm thick fully flush, double skin
62 door shell with Lock Seam joints at stile edges, fitted with in-fill of Honeycomb Kraft Paper and coated with polyester powders of Pure polyester/ epoxy polyester or polyurethane powder for powder coating of
thickness 60 – 65 microns and are coated with Zinc Phosphate Primer to receive any paint on site or finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch
resistance and durability, the Shutter provided with 6 MM clear float vision glass in Circular, Square or Rectangular shapes, Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed flush to the frame and
shutter (Profile 102x76x3mm thick).Mortise Sash Lock with Lever Handles, Mortise Dead Bolt, etc for 60 minutes Fire Rated door conforming to IS:3614 (Part2) 1992
A B C D E F G H I J K L M N O
187.20 37.80 268.81 27.72 41.58 563.11 SQM 1 ONE SQM 23746.00 13371610.06

Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially
63 designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations
including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc., overheads & contractors profit complete for finished item of work as
per special spn: 1108
A B C D E F G H I J K L M N O
9.00 8.10 25.92 43.02 SQM 1 ONE SQM 4901.00 210841.02

Supplying and fixing of two shutter cupboards as per drawing with medium teak wood frames of size 75mm x 40mm and MDF Board Interior grade both sides laminated 18mm thick for shutters with
64 18mm x 12mm teak wood beading alround and supplying and fixing powder coated MS fixtures 3 Nos. butt hinges of size 100mm long(for each shutter), tower bolt 2 Nos. of 100mm x 10mm, 2 Nos of
handles 100mm long and standard locking arrangements for shutters including cost and conveyance of all materials to site, labour charges, over heads and contractor profit etc., complete for finished item of
work.
A B C D E F G H I J K L M N O
28.08 0.00 28.08 SQM 1 ONE SQM 3258.00 91484.64

White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all
65
materials , labour charges and incidental such as scaffolding , lift charges etc., and overheads & contractors profit complete for finished item of work in all floors.
A B C D E F G H I J K L M N O
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
8407.72 922.99 0.00 520.99 679.93 157.05 196.76 50.46 2161.51 2151.42 3898.21 19147.04 SQM 1 ONE SQM 51.00 976498.96

Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air
66
dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and
contractors profit etc., complete for finished item of work in all floors for internal walls
A B C D E F G H I J K L M N O
43421.29 6220.44 826.87 914.05 458.61 319.52 338.58 67.74 41379.46 3724.02 6704.51 104375.09 SQM 1 ONE SQM 231.00 24110645.10

Providing and applying water proof wall putty of white cement or polymer or cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife /
67 muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation, applying one coat of cement primer of interior grade-1 and two coats of poy-urethane paint of light
green or light blue colour with 1mm thickness with anti fungal and anti bacterial chemical resistance durable and non particle shedding including cost and conveyance of all materials to work site and all
operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for internal walls and ceiling of Operation Theatre and labour rooms.
A B C D E F G H I J K L M N O
1487.64 0.00 1487.64 SQM 1 ONE SQM 502.00 746795.28

Supply & application of one coat water based cement primer of interior grade I and two coats of synthetic polymer luxury plastic emulsion paint of superior grade having VOC (Volatile Organic
68 Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit
complete for finished item of work in all floors.
A B C D E F G H I J K L M N O
51829.01 7143.43 826.87 1435.04 1138.54 476.57 535.34 118.20 43540.97 5875.44 10602.72 123522.13 SQM 1 ONE SQM 235.00 29027699.49

Supply & application of one coat water based cement primer of exterior grade II and two coats of synthetic polymer luxury plastic emulsion paint of superior grade having VOC (Volatile Organic
69 Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit
complete for finished item of work in all floors.
A B C D E F G H I J K L M N O
17810.37 3506.43 1499.32 572.83 587.18 267.24 338.86 71.21 4401.36 25.92 18070.86 3183.75 5194.35 55529.68 SQM 1 ONE SQM 309.00 17158670.19

Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less
70 than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat
finish and overheads & contractors profit complete in all floors (APSS No.1200, 1207 & 1211).
A B C D E F G H I J K L M N O
1106.56 141.53 22.36 10.40 9.88 2.60 2.60 918.20 207.35 445.07 2866.55 SQM 1 ONE SQM 239.00 685105.45

Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and
71
conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).
A B C D E F G H I J K L M N O
2179.05 188.88 24.75 59.12 4.73 6.54 23.46 541.06 54.00 1705.71 226.74 420.27 5434.31 SQM 1 ONE SQM 209.00 1135769.75

Providing and fixing in true horizontal level 15 mm - Mineral Fiber Ceiling tile of 595 x 595 (Square edge Fissura fine model) using hot dipped Galvanized Steel section exposed surface with pre-coated
capping, main Tee of size 24 x 32 mm at every 1200 mm c/c maximum and rotary stitched cross tee of size 24 x 27 mm at every 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 1200 mm c/c and
72 wall angle of size 19 x 19 mm fixed to periphery of the wall and the above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wire including cost and
conveyance of all materials and labour charges such as cutting , fixing of standing of frame work exposing roof making, overheads & contractor profit etc., complete for finished item of work in all floor in all
floors. A B C D E F G H I J K L M N O
5817.41 816.51 9164.47 140.34 312.67 16251.39 SQM 1 ONE SQM 1228.00 19956706.90

Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1993 fixing to Gyp steel GI perimeter channels of
size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x
73 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled
web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230
mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall top coat including overheads
and contractor profit etc., complete for finished item of work
A B C D E F G H I J K L M N O
5817.41 816.51 562.59 9164.47 140.34 312.67 16813.98 SQM 1 ONE SQM 1221.00 20529869.56
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Providing and Fixing Structural Glazing fabricated from Roll formed sections made of Pre-painted Steel / Powder coated (Base steel as per IS 513 of ‘D’ quality, galvanized as per IS 277 with Zinc of
120 Gm/sqm) with total coated thickness of 0.72mm. The glass holding section made of 304 grade stainless steel of 0.6mm thick as per the design requirement & calculations as given in IS: 875. Primer coat
with epoxy primer of 5 – 7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with Alkyd backer of 5-7 microns or powder coated with pure polyester powder up to 50-60
microns thick. The vertical section should be of 50mm x100mm x 0.72mm, 33mm x 58mm x 0.72mm for frame horizontal section, stiffener section should be 48mm x 98mm x 1mm, cover profiles sections
74
should be of 20mm x 58mm x 0.58mm, Glass holding section should be of 37mm x 37mm & 37mm x 18mm. Including 5mm thick Ocean Blue reflective glass. Brackets made of CRCA powder
coated/Electroplated should be used to connect vertical to horizontal, vertical to slab, to fix verticals at top & bottom as per site requirement. Gasket made of Ethyl Propylene Diamine Monomer. Natural cure,
with Good U.V. Resistance Silicon to be used. Wall fixing of sections to concrete/masonry wall should be with self-expanding cap & screws. The rate is inclusive of cost and conveyance of all materials to site,
all labour charges, incidental charges, cost of all consumables etc. and scaffolding charges, form work , overheads & contractors profit etc., complete for finished item of work in all floors.
A B C D E F G H I J K L M N O
100.00 100.00 575.32 30.24 60.48 866.04 SQM 1 ONE SQM 8529.00 7386455.16

Suplying and fabricating, erecting and fixing in position tabular trusses of approved design with M.S tube conforming to I.S specifications including roof frame work consisting of rafters,ties struts and
75 purlins including cost of foundations bolts, cleats, bearings plates,etc.,complete as per the approved drawing including cost and conveyance of all materials, labour charges for fabrication and fixing, hire
charges of all tools and plants, all incidental charges, overheads and contractor profit etc., complete for finished item of work in all floors as directed by the Engineer-in-Charge
A B C D E F G H I J K L M N O
1707.33 1707.33 KGs 1 ONE KGs 144.00 245855.52

Roofing with UV resistant multi - wall Polycarbonate sheets of any colour 10mm thick fixed with Aluminium Universal glazing set 40mm wide and as per drawing etc., complete including cost and
76 conveyance of all materials, labour charges, overheads and contractors profit etc., but excluding the cost of purlins, rafters, trusses, aluminium universal glazing set complete for finished item of work.
A B C D E F G H I J K L M N O
324.80 324.80 SQM 1 ONE SQM 1819.00 590811.20

Providing specialized polysulphide sealant treatment to the expansion joints on terrace (Size : 25mm x 12mm): Application of one coat of-High performance specially designed SBR latex polymer
based bonding agent– ROOFBOND SBR (Armstrong) / POWER n BOND SBR (EBT) / NITOBOND SBR (Fosroc) ZORIBOND SBR (PMCC)/ SIKA LATEX (Sika) WATERSHIELD BOND SBRASTM - C 920 -
95 /DIN 18549 TT -S-00227E or equivalent mixing with cement as per manufacturers c] Providing and application of Acrylic Polymer modified reinstatement concrete/mortar admixture with - OOFCRETE AR
(Armstrong ) / ZORIGROUT CMG (PMCC) / POWER n GUARD ARM (EBT) / WATERSHIELD AR / Fosroc to finish the damaged edges of joint and making the groove. d]. Providing and fixing of masking
77 tape on top of the joint both sides. e]. Providing and fixing of Back up support material of Polyethelene foam to leave the depth of 12mm on the joint. f]. Providing and application of one coat of polysulphide
primer with – Polysulphide primer on inner edge on joints. g]. Providing and application of Two part Polysulphide sealant to a width of 25mm and 12mm depth with - ROOFSEAL PS (Armstrong ) / POWER n
SEAL PS (EBT) /NITOSEAL PS 200 (Fosroc)/ ZORISEAL PS (PMCC) / SIKA POLYSULPHIDE (Sika) / WATERSHIELD PSComplies with BS 4254 - 83 or equavalent with putty knife and neat finish. h].
Removing of masking tape and providing and application of two coats of Acrylic elastomeric cementitious coating with – ROOFSEAL PS (Armstrong ) / POWER n SEAL PS (EBT) /NITOSEAL PS 200
(Fosroc)/ ZORISEAL PS (PMCC) / SIKA POLYSULPHIDE (Sika) / WATERSHIELD PS including cost and conveyance of all materials, labour charges, overheads & contractors profit etc., complete for finished
A B C D E F G H I J K L M N O
10.19 12.00 10.19 32.38 RM 1 ONE RM 826.00 26745.88

Providing and fixing of Expansion joint filler board for buildings, columns, beams and slabs 25 mm thick including cost and conveyance of all materials to site, all incidental, operational, labour
78
charges etc.overheads & contractors profit complete for finished item of work as per approved drawing for all floors
A B C D E F G H I J K L M N O
185.74 196.00 141.14 522.88 SQM 1 ONE SQM 450.00 235296.00

Providing and fixing of 24 gauge alluminium sheet over expansion joint groove of width 15cm fixed to walls / columns at one edge and resting over the other block walls/columns concealing expansion
joint with slotted holes for free edge of aluminium sheet to facilitate free movement of aluminium sheet over the finished surface of expansion joint and wall face using sheet metal screws with nylon receiver
79
complete including cost and conveyance of all materials to site, all incidental, operational, labour charges , overheads & contractors profit etc., complete for finished item of work as per approved drawing (for
all floors for vertical joints and bottom of slab)
A B C D E F G H I J K L M N O
371.46 392.00 129.60 282.28 1175.34 RM 1 ONE RM 77.00 90501.18

Supply and fixing of cement bonded pre-laminated particle boards aluminum glazed partitions using 10mm cement bonded pre-laminated particle boards and 5.00 mm thick plain glass to full height.
80 Using with LAM to a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections anodized to 12 to 15 microns and of sections of size 37mm x 62mm and 1.5mm thickness with
one meter centre to centre duly fixed with clip beading on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and conveyance of all materials etc., complete as directed
during execution and overheads & contractors profit etc., complete for finished item of work in all floors
A B C D E F G H I J K L M N O
151.20 168.00 319.20 SQM 1 ONE SQM 3886.00 1240411.20
Total Unit Rate Amount
S. No. Description of Work Quantity
Quantity (in words) In Rs. (Rs.)
Forming embankment with Side earth by mechanical means including pre-watering of soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods,
81 sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for
finished item of work as per MoRT&H specification 305 (4th revision) including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work
(Payment will be made based on level for finished item of work).
A B C D E F G H I J K L M N O
1176.88 1176.88 CUM 1 ONE CUM 218.00 256559.84

Construction of Granular sub-base by providing HBG material confirming to Grading - III of MORT & H Table 400-2 including cost and conveyance of all material to work site and spreading in uniform
82 layers with motor grader or by approved means, on prepared surface mixing by mix place method with Rotavator/ approved means, at OMC and compacting with vibratory roller to achieve the desired density
etc., complete for finished item of work as per MoRT& H specification 401 (4th revision) and as directed by the Engineer- in - charge including cost and conveyance of all materials , labour charges ,
overheads and contractors profit etc., complete for finished item of work (Payment will be made based on levels for finished item of work)
A B C D E F G H I J K L M N O
825.25 825.25 CUM 1 ONE CUM 1960.00 1617490.00

Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade
cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh
83 batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per
drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction
joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound
(where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including cost and conveyance of all materials , labour charges , overheads and
A B C D E F G H I J K L M N O
825.25 825.25 CUM 1 ONE CUM 7193.00 5936023.25

Providing and laying of precast concrete blocks for paving of M-40 grade and thickness not less than 80 mm for medium traffic areas conforming to IS 15658:2006 in all shapes and designs as per the
84 manufacturer's specification including cost and conveyanace cost of all materilas like cement, sand water and Pavers etc., Complete per drawings and techinical specification clause 1504 MORD including
cost and conveyance of all materials and all labour charges, overheads and contractor profit etc., complete for finished item of work.
A B C D E F G H I J K L M N O
1758.15 1163.42 2921.57 SQM 1 ONE SQM 766.00 2237922.62

Cast in Situ Cement Concrete M 20 Kerb with Channel: Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC
85 on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M 20 grade using batching and mixing plant of 15 cum per hour capacity , sloped towards the kerb, kerb stone
with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH including cost and conveyance of all materials , labour charges , overheads and
contractors profit etc., complete for finished item of work
A B C D E F G H I J K L M N O
1172.10 1172.10 RM 1 ONE RM 612.00 717325.20

Sub Total ::(Civil Works) 1408812665.43