0% found this document useful (0 votes)
18 views1 page

Hot Work Permit Template for Safety

Uploaded by

yudha elfiyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Hot Work Permit Template for Safety

Uploaded by

yudha elfiyan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

THAMRIN NINE DEVELOPMENT HWP- 0000

Ph1 GA T1 RP MN -
HOT WORK PERMIT Ph2 GA T2 RP TH MR
Ph3 GA T3 - - -

Date Prepared: Date Start :


Permit is only valid for one job or one equipment operation in one location/area and valid for one day work
Attention : (Construction/ Safety Manager) Job :
Work Time : Start : Until :
Subject : Work Location :

Requested by: (Main Contractor) Total Workers :


Description of Work:

Permit Application (Completed by Performing Authority)


Contractor / Subcontraktor who apply the Permit to Work Acknowledge by : (Project Manager)

Company Name : Sign:

Site Manager Name : Sign:


( )

Engineer Name : Sign:


Name/ Signature :

Supervisor Name : Sign:

Tools / Equipment used:


Item Description Qty Item Description Qty Item Description Qty

1 5 9

2 6 10

3 7 11

4 8 12

Inspection of Work Location (Conducted by Site Safety Coordinator/ Inspector Prior Work Start)

Inspection shall be marked by "OK" atau "NA" (not applicable) in the suitable columns
Item Description OK/NA Item Description OK/NA Item Description OK/NA
1 FIRE EXTINGUISHER 5 NO SMOKING 9 NO OVERLOAD SOCKETS
2 FIRE WATCHER 6 REFUELING ENGINE 10 WELL VENTILATED AREA
3 FIRE BLANKET 7 ANY OIL SPILLED 11 HOUSEKEEPING
4 NO FLAMMABLE MATERIAL 8 NO FRYED WIRING 12 PPE
Based on the inspection result, then recommend : (Tick in the box)
Work activity as above can be performed ( ): The job above is not approved/postponed, with the reason ( ) :
Site Safety Coordinator/ Inspector Notice : Safety Infringement Report :

Inspected by : (Site Safety Coordinator/ Inspector) Acknowledged by : (Safety Manager)

Signature Signature
Date/ Name Date/ Name
Cool Down Inspection (Conducted by Site Safety Coordinator/ Inspector After Permit Over)
Based on the inspection result, then recommend : (Tick in the box)
Work activity has been FINISHED/ STOPPED : Work Activity has not finished yet :
Date : Time : A new permit shall be applied for extending the PTW ( )
Incident Report Issued : ( ) Statement Letter is issued ( )

Statement Letter/ Safety Infringement Issued : ( )

Inspected by : (Site Safety Coordinator/ Inspector) Acknowledged by : (Safety Manager)

Signature Signature
Date/ Name Date/ Name

Performed by : (SM Contractor) Site Authority : (Safety/ PM Contractor) Area Authority (PGW Safety Manager)

Date/Name (__________________________) Date/ Name (_____________________________) Date/ Name (______________________)

Distribution:
Attachment:

Form No: HWP-CME 080515


Revision No.: R0