0% found this document useful (0 votes)
270 views11 pages

Sirim

Uploaded by

acapash
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
270 views11 pages

Sirim

Uploaded by

acapash
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
SIRIM QAS Internationa Sn. (Company No: 410534) No.1, Festa Dat’ Mone, P.O.Box 7035, Sexton?, 40700 Sheh Alam, Selangor Der Esa, Maloy ‘el no OB Ss1a8835/sssHs8ss, Fas ta 5 S455855 INTERNATIONAL TEST REPORT REPORT NO.: 2012CB4307 PAGE: 1. OF WI ‘his Test Report refers only to samples submitted by the applicant to SIRIM QAS Totersavanal San, Bha. and tested by SIRIM QAS International Sdn Bhd. Ths et report sbal mo be reproduced ence! fll ad shal st be ase for averting prpons by any means or form wthont writes approval from Managing Director, SURIM QAS laternational Sdn. Bhd. Please refer overeat Condon Reiting [Tothctsrortestnepor, Applicant : TARGET PRECAST INDUSTRIES SDN BHD Lot 1894, Jalan KBP 5, aman Bukit Belimbing, 43300 Seri Kembangan, + Selangor Darul Ehsan. ‘Manufacturer : TARGET PRECAST INDUSTRIES SDN BED Product + Precast Telecommunication & Electrical Manhole Reference Standard: Adopted to MS EN 1917:20]1., “Method of test Concrete Manholes and Inspection Chanibers, Unreinforeed, See! Fibre and Reinforced (First Revision) ~ Amex B: Test methods for vertical strength of “Annex D: Test meliog for wate abeorpion Bhs unit and capping unis Description of sample : Nine (9) modes of Precast ‘fester y& Electrical Manhole were tested at mannfactirer’s premise in Taman Bukit Belimbing, Seri Kembangan, Selangor. Model RZARIB, JCOC, 109, JRCT,TNB 6! < 4° «4°, TNB 6° 6" 4, TNB 432 @TNBUV ‘Brand? TARGET, > Date received SM amany 201 > Job no Ref. no. -. 2)" 32012196H307/SQASICCSTT-RECICSLO7 ane dele SO Sa FER Approved Signatories. : (ANON NAZIR MOHD BASH AJA NOR SIHA RAJA ABD. HANAN) ‘Senior Technical Executive Head Civil & Construction Section Testing Services Department TEST REPORT REPORT NO.: 2012CB4307 PAGE: 2 OF 11 ‘Tis Fest Report vers only Yo Samples subiied by the applicant wo SIRIM QAS TaiersaGoual Sd. Bhat aad tested by SIRIMT OAS aternatona Sdn, Bh This tet report shall ot be produced, except fll nd shal wot be nse for advertising parposes by any meats ot ‘ + ‘TESTRESULTS: Product Precast Telecommunication Manhole Model , ROA ‘Nominal External Dimension: 3410 mm x 1610 mm * 2440 mm Standard Reference Adopted to MS EN 1917; 2011 ‘Concrete Manholes and Inspection Chambers, Unreinforced, Steel Fibre and Reinforced (First Revision) ‘Annex B: Test methods for vertical strength of reducing units and capping ‘units r +7 oe Clause Methods of test ‘Test Results AnnexB : Vertical erushing load tests The vertical crushing load, F, of sample shall | ‘The vertical crushing load, of Precast Telekom sustain a Toad 245 KN (25 tonne-force) ‘Manhole R2A was able to sustain a load 245 KN (Manufacuure’s Load Test Requirement) (25 tonne-force) based on Manufacture’s Load Test B52: Vertical proof load tests = ‘The vertical proof load, , shall be 120,KN: ‘The surface wich of any residual crack after removal ofthe load shall not exceed 0.15 mm . ‘over a continuous length of 300'mhin os more, ‘or the full width of concrete sutface, whichever. | is the smaller L “The vertical proof oad, of Precast Telekom ‘Manhole R2A ‘was able to sustain load 120 KN ‘witno racks observed. TEST REPORT REPORT NO.: 2012CB4307 PAGE: 3 OF 11 | is “eat Report res oa to samples Sabie by the applicant To SIRIMY QS Teteratonal Sao. and tated by IRIN 3S Tntermaionl Sdn Bb. Ts test report stall be reproduc, exept n fll and shall not be used for adverlogprposes Dy any yan oF forms without writen approval rom Managing Dizcor, SIRIM OAS lateraatinal Sd Bhd. “The Vertical proof load, of Precast Telekom ‘The surface width of any residual crack after” | Manhole RIB was able to sustain a load 120kN removal of the load shall not exceed 0.15.mm With ho eracks observed. over 2 continuous length of 300 mm ormore, | or the full width of concrete strface, Whichever is the smaller 5 ‘TEST RESULTS: Product + Precast Telecommunication Manhole Model ft : RIB Nominal Extemal Dimension: 2210 mm x 1610 mm x 2470 mm ‘Standard Reference Adopted to MS EN 1917: 2011 ‘Concrete Manholes and Inspection Chambers, Unreinforced, Stee! Fibre and Reinforced (First Revision) ‘Annex B: Test methods for vertical strength of reducing units and capping units : > z se ee | Clause | Methods of test | ‘Test Results | T 1 | | [ames | Anes. Vere! ringed ss | The vertical crushing ond, Fy of ample sall | The veniclcssing load ofPrecst Telekom» | sustain a load 245 KN (25 tonne-force) “Manhole R1B was able to sustain a Joad 245 KN (Manufacture’s Load Test Requirement) (@5 tonne-force) based on Mamufactare’s Load Test B52: Vertical proof load tests } | ‘The vertical proof load, F, shall be 120 kN.--- | TEST REPORT REPORT NO: 2012CB4307 PAGE: 4 OF 11 “This Test Report Teer only to samp wibniaed by the applet & SIRIMT QU Tateraatonal Sa Bian Teed by STRIWT GAS {ofernational So, Bh. This test report shall ot be reproduce, except nfl 3 shall nt be weed fr ayertsing porposes by aby means oF forms witht writen approval from Managing Director, SIRIM OAS Intraston Ss Bb TEST RESUL! Product Precast Telecommunication Manhole Model ; Jcac Nominal Extemal Dimension: 2070 mm x 1380 mm x 1560 mam Standard Reference ‘Adopted to MS EN 1917:2011 ‘Concrete Manholes and Inspection Chambers, Unreinforeed, Steel Fibre and Reinforced (First Revision) ‘Annex B: Test methods for vertical strength of reducing units and capping, units Clause Methods of test ‘Test Results AnnexB | Annex B. 5.1: Vertical crushing load tests ‘The vertical crushing load, F, of sample shall sustain a load 245 KN (25 tonne-force) (Manufacture’s Load Test Requirement) Annex B.5.2: Vertical proof load tests. ‘The vertical proof load. F, shall be 120 kN: = ‘The surface width of any residual eradk after removal of the load shall not exceed 0.15 mm ‘over a continuous length of 300-1 or more, or the full width of concrete surface, whichever is the smaller ‘The vertical crushing load, of Precast Telekom Marihole JC9C was able to sustain a oad 245 kN @5 tonne-force) based on Manufacture’ Load Test ‘The Vertical proof load, of Precast Telekom Manhole 1C9C-was ble to sustain a load 120 kN “vit fo cracks observed FEES TEST REPORT r REPORT NO. 2012CB4307 PAGE: 5 OF 11 Ta Te eT ae Sis ie ye appl we RIN ONS Tinian Sin BAT and aad y SHUNT IS eran Sn Bh This et reper sal note rere cet ot be ws Ter advertising pers: by ay ines oF orm wsthou! rien approval from Mapatag Det, SIRIM OAS loternational Sd Bh. (EST RESULTS: Product + Precast Telecommunication Manhole ‘Model * 2 Jee Nominal Extemal Dimension; 1890mm = 910 mm x 1220 mm Standard Reference 2 Adopted to MS EN 1917; 2011 ‘Concrete Manholes and Inspection Chambers, Unreinforced, Steel Fibre and Reinforced (First Revision) Annex B: Test methods for vertical strength of reducing units and capping units Clause ‘Methods of test Test Results ‘Annex B | Annex B.5.1: Vertical crushing load tests ‘The vertical erushing load, F, of sample shall | The vertical crushing load, of Precast Telekom sustain a load 245 KN (25 tonne-force) Manhole JC9 was able to sustain a load 245 kN (Manufacture’s Load Test Requirement) (25 tonne-force) based on Manufacture’s Load Test Aunex B.S.2: Vertical proof load tests ‘The ventcal proof load, F, shall be 120KN=”| The vertical proofload, of Precast Telekom ‘The surface width of any residual crack after | Manhole JC9‘was able to sustain a foad 120 kN removal of the loud shall not exces 0.15 mm. With no racks observed, over a continuous length of 300-nim or more, or the full width of concrete surface, whichever} is the smaller es Photo 4: Load Test on model Precast Telecommunication Manhole JC9 05 FEB 203 TEST REPORT REPORT NO.: 2012CB4307 PAGE: 6 OF “This Test Report Fes only fo soles ubmited bj The applicant SIRIN OAS International Sim. Bh and veied by SIRIM OAS ‘International Sa. Bd. This test report shall wot be reproduce, exept afl and Shall ol bese for advertising parpses hy any meats or {ora without ten approval from Managing Diner, SIRIM QA International Sd9 Bhd, ‘TEST RESULTS: Product + Precast Telecommunication Manbole ‘Model JER? Nomina) External Dimension: 1200 mm * 900 mm > 900 mm Standard Reference + Adopted to MS EN 1917: 2011 ‘Concrete Manholes and Inspection Chambers, Unreinforced, Stee! Fibre and Reinforced (First Revision) ‘Annex B: Test methods for vertical strength of reducing units and capping units Clause ‘Methods of est ‘Test Restits ‘The vertical crushing load, F, of sample shall | The vertical crushing load, of Precast Telekom (Manufacture’s Load Test Requirement) (25 tonne-force) based on Manufacture’s Load Test Annex B.5.2: Vertical proof load tests Soak ‘The vertical proof load, F, shall be 120 kN. | The vertical proof load, of Precast Telekom The surface width of any residual crackafies | Manhole ICR Was uble to sustain a load 120 kN removal of the load shall not exceed 0:15.mim _|-with lo cracks observed. over a continuous length of 300.mim or more, ‘ cor the full width of concrete nirface, whichever |. isthe smaller ‘Annex B : B. 5.1: Vertical erushing load tests ‘Telecommunication Manhole JCR7 "95 FEB 201 sustain a Joad 245 KN (25 tonne-force) Manhole JGR7 was able to sustain a load 245 kN. | REPORT NO-: 2012CB4307 TEST REPORT PAGE: 7 OF 11 "Fis Test Report refers oly ie amples International Sd Uhd This est reort Sabai By ie apieaat to STRIMT QRS International Sdx- Wha. and tated by SIRIM OAS all ot be reproduced, excep al and shal ot be used for advertsng purposes By any eats or [forme withow writen spprva fom Maneging Deir SIRIM OAS interwaina} Sn Bhd. ‘TEST RESULTS: Product Precast Electrical Manhole Model . 2 TNB 6x6" x4? ‘Nominal Extemal Dimension: 2110mm x 2110 mm x 1530 mm Standard Reference + Adopted to MS EN 1917: 2011 Concrete Manholes and Inspection Chambers, Unreinforced, Stecl Fibre and Reinforced (First Revision) ‘Annex B: Test methods for vertical strength of reducing units and capping ‘units [clase Methods of test { Test Results | annex | noe Vert cried | ‘The vertical crushing oad, Fy of sample shall] The vertical crushing load, of Precast Electrical | | sustain a load 245 KN (25 tonne-force) “Manhole TNB 6°x 6° = 4” was able to sustain a ‘(Manufacture’s Load Test Requirement) Joad 245 KN (25 tonne-force) based on | ‘Manufacture’s Load Test | Annex B.52: Vertical proof load tests ~| | ‘The vertical proof load, F, shall be 120 kN. ‘The surface width of any residual crack after" | removal ofthe load shall not exceed 0.15.mm Toad 120 kN with ho cracks observed. ‘over a continuous length of 300m ormiore, 2 < ‘The Yertical proof load, of Precast Electrical Manhole TNB 6"? x 4° was able to sustain a 05 FEB 1B TEST REPORT REPORT NO.: 2012CB4307 Tis Te Repetto samp se by Wh appeant mo SHIN’ QAS Tako Sia DRA wad ied by STURT OAS] International Sdn, Bb. THs est report shall wt be reprodaced, except infill and shal ot be asd fer advertisin purposes by any means or {orms without writen approval from Managlog Dicer, SIRIM OAS International Sdn bd. PAGE +. 8° OF | ‘TEST RESULTS: Product Precast Electrical Manhole Model 5 TNB Ox 4" x4 Nominal External Dimension: 210mm % 1530 mm x 1530 mm Standard Reference ‘Adopted to MS EN 1917:2011 ‘Concrete Manholes and Inspection Chambers, Unreinforced, Stee! Fibre and Reinforced (First Revision) Annex B: Test methods for vertical strength of reducing units and capping units Clause Methods of test Test Results, Annex B | Annex B. 5.1: Vertical crushing load tests ‘The vertical crushing load, F, of sample shall sustain a load 245 KN (25 tonine-force) (Manufucture’s Load Test Requirement) Annex B.5.2: Vertical proof load tests ‘The vertical proof load, F, shall be 120 kN: ‘The surface width of any residual erack after removal ofthe load shall not exceed 0115 mm over a continuous length of 300.mim or more, < ‘or the full width of concrete suirfave, Whi is the smaller Os ‘The vertical crushing load, of Precast Electrical Manhole TNB 6° 4” > 4°was able to sustain a oad 245 KN (25 tome-foree) based on Manufacture’ Load Test -| The vertical proof load, of Precast Electrical ‘Manhole INB6"#-4?.x 4° was able to sustain a + 1oad 120 KN with jo cracks observed. fy 05 FEB 200 TEST REPORT - REPORT NO.: 2012€B4307 PAGE: 9 OF it ‘Tis Tes Report rere only to sample sainted by Woe appienat to SHRM QAS Tateroaonal Sdn, Bi. and tote by SIRIM GAS [nternaonal Sdn. Dis. This test report ball ot be reprodace, excep! in fall and shal ot be sed for destin parposes By any nea OF Sorms widwout writen approval from Managing Director, SIRIM OAS International Sn Bh. ‘TEST RESULTS: Product + Precast Electrical Segmental Manhole Component ‘Model ‘TNB 11 kVA + Adopted to MS EN 19172011 Concrete Manboles and Inspection Chambers, Unreinforced, Steel Fibre and Standard Reference. t Reinforced (First Revision) Annex B: Test methods for vertical strength of reducing units and capping units sibs ae sok f Clause Methods of test Test Results Annex | Annex B.$.1: Vertical crushing ond tests | ‘The vertical crushing load, F, of sample shall | The vertical crushing load, of Precast Electrical sustain a load 245 kN (25 tonne-force) Segmental Manhole Component TNB 11 kVA. (Manufacture’s Load Test Requirement) ‘was able to sustain a load 245 KN (25 tonne-force) ‘based on Manufacture’s Load Test Aumex B.5.2: Vertical proof load tests ‘The Yertical proof load, F, shall be 120 kN:<**|:The vettical proof load, of Precast Electrical The surface width of any fesidual crack after“, | Segmental Manhole Component TNB 1] kVA. removal of the load shall not exceed 0.15 mm’ | was.able to sustaitaload 120 KN with no cracks | over a continuous length of 300 mnt or more, |-observed. or the full width of concrete surface, Whichever | REPORT NO.: 2012084307 TEST REPORT PAGE: 10 OF 1 Product Model ‘Nominal Extemal Dimnension Standard Reference Clause Methods of test Annex B is the smaller “Tis Test Report res only fo saapis subaiied by Whe applicant to SIRIN OAS Toteraatonal Sia, Bhi apd tested by SIRINT GAS International Sau. Bhd. This ts report sal ol be reproduced, excep tn full and shal ot be asl for averting purpeses by any mate oF Sor witout written approval rom Manon Director, SIRIM OAS Fnterntional Sin bd Precast Electrical Manhole TINB 4? 32° 1400 mm % 1100 mm * 1000 mm ‘Adopted to MS EN 1917: 2011 Concrete Manholes and Inspection Chambers, Unreinforced, Stee! Fibre and Reinforced (First Revision) ‘Annex B: Test methods for vertical strength of reducing units and capping ‘units Test Results The vertical crushing load. F, of sample shall | The vertical crushing load, of Precast Electrical sustain a load 245 KN (25 tonne-force) (Manufacture’s Load Test Requirement) oad 245 KN (25 tonne-force) based on ‘Manhole TNB 4°x 3° 2° was able to sustain @ Manufacture’s Load Test Annex B.S2: Vertical proof load tests ‘The vertical proof loud, F, shall be 120 kN. °,| ‘The Yeri¢al proof load, of Precast Electrical ‘The surface width of any residual crack aftes~ | Manhole TNB TNB:4’x 3° x 2° was able to removal of the load shall not exceed 0.13.mm _| Sustain a load 120 RN with no eracks observed. over a continuous length of 300 stim or more, YS ‘or the fall width of concrete surface, Whichever TEST REPORT REPORT NO.; 2012CB4307 PAGE: 11 OF 1 “This Test Report eters only To samples vied Dy Whe applicant SURIM ONS Tataratinal Say Bhd. and tied by SIRINT GAS International Sdn. Bd. This est report shal Uo be repredsced,exerp nfl and shall ot be tse for adversins purpscs By any meats oF forms without writen approval fem Managing Director, SIRIM QAS Yotrmaionl San Bh ‘TEST RESULTS: | Product Precast Telecommunication & Electrical Manhole | Standard Reference , + Adopted to MS EN 1917; 2011 | Concrete Manholes and Inspection Chambers, Unreinfosced, Steel Fibre and \ Reinforced (First Revision) | Annex D: Test method for water absorption | Clause Methods of test | Test Results absorption 2) Precast Telecommunication Manhole R1B: 3) Precast Telecommunication Manhole C9 | 4) Precast Telecommunication Manhole IC9: | 5) Precast Telecommunication Manhole ICR: 6) Precast Electrical Manhole TNB 6°* 6” = 4°: 8.0 % 7) Precast Electrical Manhole TNB 6’ 47 * 4°:8.0% 8) Precast Electrical Segmentel Manhole Component TNB TL KVA: 7.8% = 9) Precast Electrical Manhole INB 4% 3° «2":72 % | Annex D | Test Methods for water | 1) Precast Telecommunication Manhole R2A:

You might also like