• Purpose of implementation
• Product overview
• Equipments required
AGENDA • Identification of approximate
budget required
• Plan of action
• Timeline of progress
3
• Automation of electricity monitoring PURPOSE OF
• Cost and time efficiency IMPLEMENTATION
• Real time data access
• Energy management and
conservation
• Scalability for smart homes
• Educational value
4
PRODUCT OVERVIEW
• Real time energy monitoring
• Energy consumption history
• Scalable and expandable
• Easy installation and setup
• High precision voltage measurement
• User friendly mobile interface
5
• ESP32 Development board
• SCT-013 Current sensor
• ZMPT01B Voltage sensor module
• Blynk application
• Resistors , capacitors
• Laptop or computer with Arduino IDE installed
• Connecting wires and jumpers
EQUIPMENTS REQUIRED • Breadboard or PCB
• Power supply , USB cable
• AC socket and plug
6
IDENTIFICATION OF APPROXIMATE BUDGET REQUIRED
ITEM DESCRIPTION ESTIMATED COST
ESP32 Microcontroller Central microcontroller with wifi and bluetooth ₹300 - ₹500
SCT-013 Current Sensor Non – invasive AC current sensor (up to 100 A) ₹400 - ₹600
ZMPT101B Voltage Sensor AC voltage sensor module for accurate voltage ₹200 - ₹300
measurement
Power supply (5V DC) Power adapter or module to supply 5V DC ₹100 - ₹200
PCB and Components PCB and additional electronic components ₹200 - ₹500
Enclosure/box Protective housing for components ₹100 - ₹300
Wires and connectors Wiring and connectors for circuit assembly ₹50 - ₹100
Miscellaneous Small items like screws , soldering materials etc ₹100 - ₹200
Total Overall project cost ₹1,100 - ₹2,700
7
PLAN OF ACTION
PHASE 01 : RESEARCH AND PLANNING
• DEFINE PROJECT OBJECTIVES
• COMPONENT SELECTION
• BUDGET PLANNING
• SCHEMING DESIGN
PHASE 02 : COMPONENT PROCUREMENT AND ASSEMBLY
• PURCHASE COMPONENTS
• A SSEMBLY CI RCUIT ON BREADBOARD
• D E V E L O P A N D T E S T P O WE R S U P P L Y
PLAN OF ACTION
PHASE 03 : Programming and integration
• Setup development environment
• Write and upload code
• Test and debug
PHASE 04 : Final assembly and enclosure
• Assemble in enclosure
• Power on and final testing
9
PLAN OF ACTION
PHASE 05 : Documentation and presentation
• Prepare project documentation
• Create presentation
• Demonstration of the project
PHASE 06 : Deployment and future Enhancements
• Deploy the system
• Gather feedback
• Plan for future enhancements
10
WEEK 01 : Research and planning
WEEK 02 : Component procurement
WEEK 03 : Circuit assembly and initial testing
TIMELINE OF PROGRESS
WEEK 04 : Programming and code development
WEEK 05 : Integration and testing
WEEK 06 : Final assembly
WEEK 07 : Final testing and calibration
WEEK 08 : Documentation and presentation