St. Matthew Church Restructuring Plan
St. Matthew Church Restructuring Plan
OF
A
10
PORCH
SEC.
9
8
---
-
S
S
CHURCH AUDITORIUM
SACRISTY & OFFICE
+750
7
PRY PORCH
+750
+600
+900
ALTAR
+450
6
5
4
3
2
PORCH
SEC.
1
A
---
-
B
A
G
C
F
FLOOR PLAN
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7) The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO FLOOR NA
STATE. PLAN
A
APPROVAL COLUMN
10
9
8
---
-
S
S
7
6
5
4
3
2
1
A
---
-
B
G
A
F
ROOF PLAN
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)______________ will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO ROOF PLAN NA
STATE.
APPROVAL COLUMN
ROOF MEMBERS
PURLINS: 75mmX75mm angular steel@ 1200mm ctrs
RAFTER: 150mmX150mm angular steel@ 3000mm ctrs
LONG SPAN ALUMINIUM ROOFING SHEET COVERING
HANGERS: 75mm x75mm angular steel
All Welded and bolted with angular cleat
Level 5
13725
Level 4
5975
Level 2
4375
Level 1
450
SECTION S-S
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO
SECTION NA
STATE.
APPROVAL COLUMN
ROOF MEMBERS
PURLINS: 75mmX75mm angular steel@ 1200mm ctrs
RAFTER: 150mmX150mm angular steel@ 3000mm ctrs
LONG SPAN ALUMINIUM ROOFING SHEET COVERING
HANGERS: 75mm x75mm angular steel Level 5
All Welded and bolted with angular cleat
13725
Level 4
5975
Level 2
4375
CHURCH AUDITORIUM
Level 1
450
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO SECTION NA
STATE.
APPROVAL COLUMN
Level 4
13725
Level 4
7795
Level 4
5975
Level 1
4370
Level 1
3150
Level 1
450
APPROACH
ELEVATION
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO
ELEVATIONS NA
STATE.
APPROVAL COLUMN
BACK
ELEVATION
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO ELEVATIONS NA
STATE.
APPROVAL COLUMN
LEFT SIDE
ELEVATION
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO ELEVATION N. A.
STATE.
APPROVAL COLUMN
RIGHT SIDE
ELEVATION
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO
ELEVATION N. A.
STATE.
APPROVAL COLUMN
DOOR SCHEDULE
DM01 DW02 DW04
4 7 2
CHURCH HALL ALTAR, OFFICES, LOBBY TOILET
NOTE
· all hinges to be in EU made 3mm thick brass finish at 2 per door
· all motise locks on timber panel doors to be EU brass plated robust 2000 series yale motise locks to architect approval
· all timber panel door to be provided with 12x50mm hardwood architrave in same finish as door
DOOR SCHEDULE
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO
SCHEDULE NA
STATE.
APPROVAL COLUMN
WINDOW TYPE
WA01 WINDOW TYPE
WA02
WINDOW Outward 2 Leaf Top Hung Window Outward 2 Leaf Casement Window
WINDOW
DESCRIPTION With PVC Lever Handles, Hinges & Back Stay
DESCRIPTION With PVC Lever Handles, Hinges & Back Stay
FRAME Ash Powdered Coated Aluminium Frame FRAME Ash Powdered Coated Aluminium Frame
SUB-FRAME 50x15MM Hollow Section M.S. SUB-FRAME 50x15MM Hollow Section M.S.
GLASS 6mm Bronze Tinted Glass GLASS 6mm Bronze Tinted Glass
QUANTITY 22 nos QUANTITY 24 nos
WINDOW TYPE
WA03 WINDOW TYPE
WA04
WINDOW Outward 2 Leaf Casement Window WINDOW Outward 2 Leaf Casement Window
DESCRIPTION With PVC Lever Handles, Hinges & Back Stay DESCRIPTION With PVC Lever Handles, Hinges & Back Stay
FRAME Ash Powdered Coated Aluminium Frame FRAME Ash Powdered Coated Aluminium Frame
SUB-FRAME 50x15MM Hollow Section M.S. SUB-FRAME 50x15MM Hollow Section M.S.
GLASS 6mm Bronze Tinted Glass GLASS 6mm Bronze Tinted Glass
QUANTITY 4 nos QUANTITY 2 nos
WINDOW SCHEDULE
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO SCHEDULE NA
STATE.
APPROVAL COLUMN
Detail @ Y Detail @ X
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO DETAILS NA
STATE.
APPROVAL COLUMN
C
B
F F
soak away pit
septic tank
inspection
chamber
C B
50mm thick precast conc baffle wall
floor slab
E (4) Reinforced conc. mix shall be 1:2:4 and should obtain minimum cube crushing strength RO OSE RESTR CT RIN O C C ATE. ECE ER
21n/mm after 8 days, fcu=n/mm
S ST. ATTHE CATHO IC
(5) Cover to reinft should be fdtn=50mm,columns=40mm,floor slab=20mm.
CH RCH HEAD OFFICE: No. 61B Egbeadokhai Street, Auchi, Edo State. RA IN TIT E. SCA E
(6)Foundation depth to be determined by the site Engineer. 08062905273, 08037647743.
(7)The Architect will not accept responsibility for workdone SHEET N ER
but not supervised by it. AYOGWIRI, ETSAKO WEST L.G.A., EDO SANITARY NA
STATE. DETAILS