P.U.D. #2 of Pacific County:
Net Metering Diagram*
Generation's Main
Customers Customer’ pup Disconnect (Located
Generation Equipment Electrical Generation Meter)
(Solar Array, Wind Interface Meter
Turbine, etc.) Equipment
(6) (ez _| (mM) a
Output=120/240 Vac
(Disconnect to
(Will be Specific to (Measures be Automatic if
Customer's Design) kWh's Generation is to be
Generated Used as Backup/
Located nextto Emergency Power)
NET Meter)
Customer's
Breaker Panel y
Customer's
Service Wire
Main Breaker
(Typical)
( F
aA |
\M a
<>
PUD
Power
Transformer Breaker in
PUD Std. Position
Net Meter (Typical)
(Measures Customer's
kWh's Consumed, Electical
Generated, and Loads
NET)
*This diagram is a guideline for interconnection to the Grid, Each installation will vary depending
on the customer's existing electrical service and the customer's proposed generation. The
customer must enter into a Net Metering Contract with the District prior to interconnection. All
customer-installed equipment to be approved by Washington State L&l Inspector.