SIEMENS
Routine Test Certificate
Date sriosrzo2t |Rated votage
JProductName Vacuum crcult breaker Rated short ore breaking uront
Jctent ‘SIEMENS VIETNAM \Ratod normal eurant
Irate roquoncy
forsee No aoo7408s6art10
lure Sarots |Rated control vtiage for tip cot 4
Sera ne. aor 2015 Rat corival votage fr tip col 2
lrtempiertype 8836131 AZ [Rate coral votage for cose coll
[Year of manufecuring 202% [Rate coral votage for sping cargeg motor
Rate corral votage for adtiona votage cals
|compfes to standard 16¢ 62271-10018 19118 Rated cument for diana curent cola
405 kv
254A
1600 A
‘0 He
220 voc
220 v0C
220 VDC
220 v0C
NA.
Dielectric test on the main crcult
a. Power frequency wihslars voltage test 95kV AC SO Hat min te
‘
PHIL yenst2 epnits
b. merupter Seo, Tew 012731 yeworr = rawar27%0
Test on auxilary & conto circut
82. Inspection af aur & contol creat, & verftion of canfrmiy to the cecut & wing diagrams Found OK
2 Functional este Found O
_Vesicaton of protecton against eectical shock Found Ox
4 Delecetesis 24V ACOH 1 see Te
Measurement of resistance ofthe main circuit
36. Votage drop test at 1008 06. RPHILt yeni BPh/Ls
22, mv 21 mv 22 mv
44. Design and visual checks
‘The switchgear and conrlgear checked to vey ts compance wt oder specication & found as per the requirement.
Mechanical operating test
58. ClO smanmum vtage cette avec oattsun 2avec Operates satstactorty
©. C/Oatminimum vatage Cooakn fervoe ononle ts0v0C Operates satisfactorily
© C/O strated votage Caius mawoe Olle zavO Operates satisfactory
‘Spring charging motor performance
‘2 Spring charging be at ato votage (Ua) 9768
© Curent dram by the moto at rated voltage (Us) 1675.8
Spring charging ime at minimum votage (0.85 Ua) 11386
{6 Curent raw by the motor at minimum voltage (0.85 Us) 1675.4
Operating ties ofthe breaker
Rensur veniiz spnies
7a, Close ume at Ua wi (v9) 645 me 643 ms 42 ms
1. Open time at Ua wth Tat release (1) 4340 ms 439° ms 439° ms
© Open time at Ua with 2nd release (¥2) 413 me aa ms 47 ms
lenecked during routine testing In ur test laboratory,
The equipment complies with specification of IEC 62271-100 & IS 12118. Compllance with the above specification has been
Note: NA.
[Test laboratory EMS O AIS THA OP SD This
3 reports valid without signature.
laddress. ‘Siemans Lid. Energy Management Div. Thane Belapur Road, Thane, Maharashtra, nda, Pin 400601SIEMENS
3AF 01
Outdoor Vacuum Circuit Breaker
36/40.5kV
Operating Instructions Manual N8-A7E-324-02159-0017. Commissioning
/\ danger
High voltage!
Touching live parts will result in death or severe
personal injury.
| this equipment maybe operated only by qualified
personnel who have become thoroughly familiar
with the operating instruction manual and in
Dartcular al sfety instructions
/\ CAUTION
This equipment contains hazardous voltages and
mechanical parts which move at high speed and may
be controlled remotely.
Non-observance of the safety instructions can result
in severe personal injury or damage to the property.
In particular:
Do not open the door of the mechanism housing. Do
not reach inside the operating mechanism. Do not
touch pole assemblies and operating rods mounted
in the base frame.
Prior to commissioning, check the vacuum circuit-breaker
in accordance with the following points.
1 Clean the circuit-breaker as applicable (for details
refer to “Cleaning’)
2 Check that all fixing and terminal screws are
tightened securely.
3 Examine the circuit breaker for any external
damage, especially to the terminal pads,
porcelain insulators.
4 Check functioning of space heater.
7.1, Slow Closing Operation (Optional)
When CBisin open position, with the losing and tipping
springs discharged and auxiliary supply switch in OFF
position, start the following sequence.
(@) Insert the manual handle (P-7, Fig. 7) between
the drive mechanism shaft (P-17, Fig. 11) and
pin °-18, Fig. 11).
(©) Slowly move the handle down tll the trp
paw latches with the trip lever roller. The CB
Contacts have closed. This will be shown by the
movement of ONIOFF indicator to” symbol
7.2 Slow Opening Operation (Optional)
Starting with the condition at the end of the slow closing
operation
(a) Insert the manual handle in the same position,
(b) Move the handle down still further.
(©) Keeping the handle pressed down, press the
OFF P38, (P.6, Fig. 11) and gradually release the
pressure on the handle, allowing the shaft to
rotate, The movement ends with the indicator
showing "O" symbol for CB Off
Safety Precautions : Always keep downward pressure
fon the handle. Release pressure gradually. Withdraw
the handle for further steps.
7.3. Charging the Closing Spring by hand
(manually)
(Fig. 1)
/J\ CAUTION
‘The vacuum circuit-breaker may be operated
‘manually with the hand crank in order to avoid
injuries that may occur if the motor starts up
suddenly
Insert the hand-crank in hole (P-15) and turn it clockwise
Until the indicator (P-8) shows “closing spring charged’.
The hand-crank is coupled with the charging mechanism
via a decoupling facility. The operator is thus not exposed,
to any risk should the control supply recover during
charging,
7.4 Closing (Manual) (Fig. 11)
Press the “ON’ button (P-3) or initiate a switching
‘command from the control room until the vacuum
breaker has closed. The ON-OFF indicator (P-9) will then
display the symbol I” and the closing spring indicator will
display “spring discharged” symbol.
The closing spring is automatically recharged by the
motor mechanism immediately after the breaker has
closed. In hand operated breakers, the closing spring can
be recharged by hand.
7.5 Opening (Manual) (Fig. 11)
The tripping spring is charged during closing. To open the
breaker, press the “OFF” button (P-6) or initiate a tripping
command from the control room unit. The vacuum
breaker will open and the “O" symbol is displayed by
indicator (P-9),
Note: Closing and opening operations of CB can be
checked locally also by CB ON/OFF switch (P-3 Fig. 10)
mounted on the control panel inside the mechanism
housing7.6 Space Heater in the operating mechanism
housing
euro
Note : The heater must be always "ON" whether
the breaker is in service or not, to prevent
condensation of moisture particularly on the
insulating components.
Ld
‘Two heater is provided in the mechanism housing. Keep
the heater switch in the ON position, so that when the
control supply is applied all the heaters are ON.
NOTE
2h 18 1913 Keep door and all covers closed firmly to prevent
entry of dust, moisture, insects etc.
1. Gear box 10, sheet steel frame
Motor 11. hock absorber
3. Mechanical ON push 12. Closing spring
button 13. ripping spring
4. Closing solenoid 14, Auxiliary switch
(release) 15, Opening for hand crank
5. Tipping solenoid 16.0peration counter
(release) 17. Drive shaft
6, Mechanical OFF push 1g\pin
7. Operating od forsnap 12: DaTing plates
20. Additional releases
(optional)
[Link] switch
[Link] plate
[Link] rod for aux. switch
switches,
8, Mechanical spring
charged indicator
9. Mechanical ONIOFF
indicator
Fig. 11 Details of operating mechanism
158.13 Troubleshooting
Problem _ | Symptoms / Effect [Possible Causes / Reasons Remedial Measures
Breaker [1 Closing spring charges, but | 1. Electical power to auxiiay | 1. Check electrical power to auliony
faisto | breaker does not clase. Gieuit iso MCB as ted. |” creuit andlor piace blown fuses,
cose
2 Loose connection, damage to [2 Check & epalr as necessary
wring,
3. No losing command to terminal | 3. Check for continay@ corect agi
13.5036 chet.
Terminals X83 8XBa not [4 Check & repair
shorted, remote close is not
required
5: Unoperatonal dosing release. |. Test dosing release separate &
then replace it not operating
6. Aux. switch ($1) contacts 21-22 | 6. Check & adjust mechanical linkage
are open wien te breakers |” with aux sith,
closed
7. Unoperationalanti-pumping [7 Check & replace, i nacenary
contactor 1) Bs camtacs “_
Z Ceosing spring doesnot] 1. Eectrieal power to auxiliary | 1. Check electical power auxiliary
charge automaticaly, Gicutisa, of MC as tpped. | cet andlor pace blown fuses
2 Loose connection, damage to [2 Check & epalr as necessary
ing,
3, Terminals X33 84 are nat [3 Check repair
shorted remote close snot
requted :
4 Unoperatonal charging motor _| 4. Check & replace
5. Limit itches S21 & S22 failto |S. check & mechanical inkage with
operate limit switch & comet
© Mechanical faire of operating | 6. Check & contact authorised service
mechanism, centres
3, Closing release operates, | Mechanica failure of operating | Check & contact authorised sence
Sound of breaker closings. | mechanism, cents
heard, but beater contacts
donot cose
Nuisance | 7, Electrical problem 1. losing command continues on | 1. Check & comec logic cuits
ortalse terminal 3,393.4
closing of Z Terminal A? of closing releases | 2. Check to find outf problem in
| shorted to cart, wiring or tlease. Contec 5 per
— i | requirement
2, Mechanical problem | Mechanica failure of operating | Check & contact authorised sevice
mechanism centres
Greater | 1. Wipping Release (7) does | 1. electcal power to auiany | 1. Check electrical power to auniary
doesnot | not tip Gel foff, or MCBhas tripped. | cei andor epace blown uses.
wip. 2. There isno tipping sound. | 2. Loose connection, damage to | 2. Check & repair as necessary
wining
3. No tipping command to 3 Check for contin @ coret ogie
terminal 93.9 cuit,
Terminals x3.7 833.8 are nat [4 Check & repair
shorted, ieerote ips nt
require
5. Unoperatona ipping release, | 5, Test ipping release separately &
replace not operating.
6. Aun switch (1) contacts 23.24 6. Check & aust mechanical nkage
- are open when beakers closed. | with aux. sith,
Tisance | 1. Electcal problem 7. Tipping command continues on | 7. Check & comec logic creuts
or false terminal 3.3
‘epg of [> yechancal problem | 2. Mechanical faire of operating | 2. Check & contact authorised service
mechanism, centres
20Wiring diagrams includes all possible circuit
arrangements:- selection dependent on order of circuit-
cu
breaker. Below wiring diagram illustrates a non-committal
example.
L. ‘emton
UL
=|
i
TL Lkkkd
i
i
i
\l
|
i
=J
CONTROL CRCUIT
Note: MCBs are replaced by fuses and neutral links, if ordered.
9 Service
Thank you for placing your trust in us as a manufacturer
of medium-voltage switchgear and components - and
thus in our technology as a whole. We attach great
importance to personal safety, system reliability,
availability and service. Your suggestions enable us to
keep on improving our products. Please do not hesitate to
contact us.
You can find your contact at the Siemens Regional Offices
in your area and other Siemens addreses via the internet
under http:[Link]
Call our Customer Support Center
Toll Free Ph. No.: 1-800-266-7480
‘Mail: [Link]@[Link]
(Our aim is to provide you with prompt and expert support.
2Notes:
2Siemens Limited
Smart Infrastructure
Distribution Systems
R&D Building, Thane Belapur Road
Thane 400 601 India
Tel 491 22 3326 5005
Tollfree number: 1800 209 1800 Order No. N8-A7E-324-02159-001 [Link]
sios03062021 ‘roduc development a continuous proces, Consequent, the ‘Siemens ited
data inscated In ts Booklets subjet to change without or Ags reserved
rote For the atest information please contact our Sales fies, Printed nina