0% found this document useful (0 votes)
112 views9 pages

Routine Test

Uploaded by

hoangtinbk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
112 views9 pages

Routine Test

Uploaded by

hoangtinbk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
SIEMENS Routine Test Certificate Date sriosrzo2t |Rated votage JProductName Vacuum crcult breaker Rated short ore breaking uront Jctent ‘SIEMENS VIETNAM \Ratod normal eurant Irate roquoncy forsee No aoo7408s6art10 lure Sarots |Rated control vtiage for tip cot 4 Sera ne. aor 2015 Rat corival votage fr tip col 2 lrtempiertype 8836131 AZ [Rate coral votage for cose coll [Year of manufecuring 202% [Rate coral votage for sping cargeg motor Rate corral votage for adtiona votage cals |compfes to standard 16¢ 62271-10018 19118 Rated cument for diana curent cola 405 kv 254A 1600 A ‘0 He 220 voc 220 v0C 220 VDC 220 v0C NA. Dielectric test on the main crcult a. Power frequency wihslars voltage test 95kV AC SO Hat min te ‘ PHIL yenst2 epnits b. merupter Seo, Tew 012731 yeworr = rawar27%0 Test on auxilary & conto circut 82. Inspection af aur & contol creat, & verftion of canfrmiy to the cecut & wing diagrams Found OK 2 Functional este Found O _Vesicaton of protecton against eectical shock Found Ox 4 Delecetesis 24V ACOH 1 see Te Measurement of resistance ofthe main circuit 36. Votage drop test at 1008 06. RPHILt yeni BPh/Ls 22, mv 21 mv 22 mv 44. Design and visual checks ‘The switchgear and conrlgear checked to vey ts compance wt oder specication & found as per the requirement. Mechanical operating test 58. ClO smanmum vtage cette avec oattsun 2avec Operates satstactorty ©. C/Oatminimum vatage Cooakn fervoe ononle ts0v0C Operates satisfactorily © C/O strated votage Caius mawoe Olle zavO Operates satisfactory ‘Spring charging motor performance ‘2 Spring charging be at ato votage (Ua) 9768 © Curent dram by the moto at rated voltage (Us) 1675.8 Spring charging ime at minimum votage (0.85 Ua) 11386 {6 Curent raw by the motor at minimum voltage (0.85 Us) 1675.4 Operating ties ofthe breaker Rensur veniiz spnies 7a, Close ume at Ua wi (v9) 645 me 643 ms 42 ms 1. Open time at Ua wth Tat release (1) 4340 ms 439° ms 439° ms © Open time at Ua with 2nd release (¥2) 413 me aa ms 47 ms lenecked during routine testing In ur test laboratory, The equipment complies with specification of IEC 62271-100 & IS 12118. Compllance with the above specification has been Note: NA. [Test laboratory EMS O AIS THA OP SD This 3 reports valid without signature. laddress. ‘Siemans Lid. Energy Management Div. Thane Belapur Road, Thane, Maharashtra, nda, Pin 400601 SIEMENS 3AF 01 Outdoor Vacuum Circuit Breaker 36/40.5kV Operating Instructions Manual N8-A7E-324-02159-001 7. Commissioning /\ danger High voltage! Touching live parts will result in death or severe personal injury. | this equipment maybe operated only by qualified personnel who have become thoroughly familiar with the operating instruction manual and in Dartcular al sfety instructions /\ CAUTION This equipment contains hazardous voltages and mechanical parts which move at high speed and may be controlled remotely. Non-observance of the safety instructions can result in severe personal injury or damage to the property. In particular: Do not open the door of the mechanism housing. Do not reach inside the operating mechanism. Do not touch pole assemblies and operating rods mounted in the base frame. Prior to commissioning, check the vacuum circuit-breaker in accordance with the following points. 1 Clean the circuit-breaker as applicable (for details refer to “Cleaning’) 2 Check that all fixing and terminal screws are tightened securely. 3 Examine the circuit breaker for any external damage, especially to the terminal pads, porcelain insulators. 4 Check functioning of space heater. 7.1, Slow Closing Operation (Optional) When CBisin open position, with the losing and tipping springs discharged and auxiliary supply switch in OFF position, start the following sequence. (@) Insert the manual handle (P-7, Fig. 7) between the drive mechanism shaft (P-17, Fig. 11) and pin °-18, Fig. 11). (©) Slowly move the handle down tll the trp paw latches with the trip lever roller. The CB Contacts have closed. This will be shown by the movement of ONIOFF indicator to” symbol 7.2 Slow Opening Operation (Optional) Starting with the condition at the end of the slow closing operation (a) Insert the manual handle in the same position, (b) Move the handle down still further. (©) Keeping the handle pressed down, press the OFF P38, (P.6, Fig. 11) and gradually release the pressure on the handle, allowing the shaft to rotate, The movement ends with the indicator showing "O" symbol for CB Off Safety Precautions : Always keep downward pressure fon the handle. Release pressure gradually. Withdraw the handle for further steps. 7.3. Charging the Closing Spring by hand (manually) (Fig. 1) /J\ CAUTION ‘The vacuum circuit-breaker may be operated ‘manually with the hand crank in order to avoid injuries that may occur if the motor starts up suddenly Insert the hand-crank in hole (P-15) and turn it clockwise Until the indicator (P-8) shows “closing spring charged’. The hand-crank is coupled with the charging mechanism via a decoupling facility. The operator is thus not exposed, to any risk should the control supply recover during charging, 7.4 Closing (Manual) (Fig. 11) Press the “ON’ button (P-3) or initiate a switching ‘command from the control room until the vacuum breaker has closed. The ON-OFF indicator (P-9) will then display the symbol I” and the closing spring indicator will display “spring discharged” symbol. The closing spring is automatically recharged by the motor mechanism immediately after the breaker has closed. In hand operated breakers, the closing spring can be recharged by hand. 7.5 Opening (Manual) (Fig. 11) The tripping spring is charged during closing. To open the breaker, press the “OFF” button (P-6) or initiate a tripping command from the control room unit. The vacuum breaker will open and the “O" symbol is displayed by indicator (P-9), Note: Closing and opening operations of CB can be checked locally also by CB ON/OFF switch (P-3 Fig. 10) mounted on the control panel inside the mechanism housing 7.6 Space Heater in the operating mechanism housing euro Note : The heater must be always "ON" whether the breaker is in service or not, to prevent condensation of moisture particularly on the insulating components. Ld ‘Two heater is provided in the mechanism housing. Keep the heater switch in the ON position, so that when the control supply is applied all the heaters are ON. NOTE 2h 18 1913 Keep door and all covers closed firmly to prevent entry of dust, moisture, insects etc. 1. Gear box 10, sheet steel frame Motor 11. hock absorber 3. Mechanical ON push 12. Closing spring button 13. ripping spring 4. Closing solenoid 14, Auxiliary switch (release) 15, Opening for hand crank 5. Tipping solenoid 16.0peration counter (release) 17. Drive shaft 6, Mechanical OFF push 1g\pin 7. Operating od forsnap 12: DaTing plates 20. Additional releases (optional) [Link] switch [Link] plate [Link] rod for aux. switch switches, 8, Mechanical spring charged indicator 9. Mechanical ONIOFF indicator Fig. 11 Details of operating mechanism 15 8.13 Troubleshooting Problem _ | Symptoms / Effect [Possible Causes / Reasons Remedial Measures Breaker [1 Closing spring charges, but | 1. Electical power to auxiiay | 1. Check electrical power to auliony faisto | breaker does not clase. Gieuit iso MCB as ted. |” creuit andlor piace blown fuses, cose 2 Loose connection, damage to [2 Check & epalr as necessary wring, 3. No losing command to terminal | 3. Check for continay@ corect agi 13.5036 chet. Terminals X83 8XBa not [4 Check & repair shorted, remote close is not required 5: Unoperatonal dosing release. |. Test dosing release separate & then replace it not operating 6. Aux. switch ($1) contacts 21-22 | 6. Check & adjust mechanical linkage are open wien te breakers |” with aux sith, closed 7. Unoperationalanti-pumping [7 Check & replace, i nacenary contactor 1) Bs camtacs “_ Z Ceosing spring doesnot] 1. Eectrieal power to auxiliary | 1. Check electical power auxiliary charge automaticaly, Gicutisa, of MC as tpped. | cet andlor pace blown fuses 2 Loose connection, damage to [2 Check & epalr as necessary ing, 3, Terminals X33 84 are nat [3 Check repair shorted remote close snot requted : 4 Unoperatonal charging motor _| 4. Check & replace 5. Limit itches S21 & S22 failto |S. check & mechanical inkage with operate limit switch & comet © Mechanical faire of operating | 6. Check & contact authorised service mechanism, centres 3, Closing release operates, | Mechanica failure of operating | Check & contact authorised sence Sound of breaker closings. | mechanism, cents heard, but beater contacts donot cose Nuisance | 7, Electrical problem 1. losing command continues on | 1. Check & comec logic cuits ortalse terminal 3,393.4 closing of Z Terminal A? of closing releases | 2. Check to find outf problem in | shorted to cart, wiring or tlease. Contec 5 per — i | requirement 2, Mechanical problem | Mechanica failure of operating | Check & contact authorised sevice mechanism centres Greater | 1. Wipping Release (7) does | 1. electcal power to auiany | 1. Check electrical power to auniary doesnot | not tip Gel foff, or MCBhas tripped. | cei andor epace blown uses. wip. 2. There isno tipping sound. | 2. Loose connection, damage to | 2. Check & repair as necessary wining 3. No tipping command to 3 Check for contin @ coret ogie terminal 93.9 cuit, Terminals x3.7 833.8 are nat [4 Check & repair shorted, ieerote ips nt require 5. Unoperatona ipping release, | 5, Test ipping release separately & replace not operating. 6. Aun switch (1) contacts 23.24 6. Check & aust mechanical nkage - are open when beakers closed. | with aux. sith, Tisance | 1. Electcal problem 7. Tipping command continues on | 7. Check & comec logic creuts or false terminal 3.3 ‘epg of [> yechancal problem | 2. Mechanical faire of operating | 2. Check & contact authorised service mechanism, centres 20 Wiring diagrams includes all possible circuit arrangements:- selection dependent on order of circuit- cu breaker. Below wiring diagram illustrates a non-committal example. L. ‘emton UL =| i TL Lkkkd i i i \l | i =J CONTROL CRCUIT Note: MCBs are replaced by fuses and neutral links, if ordered. 9 Service Thank you for placing your trust in us as a manufacturer of medium-voltage switchgear and components - and thus in our technology as a whole. We attach great importance to personal safety, system reliability, availability and service. Your suggestions enable us to keep on improving our products. Please do not hesitate to contact us. You can find your contact at the Siemens Regional Offices in your area and other Siemens addreses via the internet under http:[Link] Call our Customer Support Center Toll Free Ph. No.: 1-800-266-7480 ‘Mail: [Link]@[Link] (Our aim is to provide you with prompt and expert support. 2 Notes: 2 Siemens Limited Smart Infrastructure Distribution Systems R&D Building, Thane Belapur Road Thane 400 601 India Tel 491 22 3326 5005 Tollfree number: 1800 209 1800 Order No. N8-A7E-324-02159-001 [Link] sios03062021 ‘roduc development a continuous proces, Consequent, the ‘Siemens ited data inscated In ts Booklets subjet to change without or Ags reserved rote For the atest information please contact our Sales fies, Printed nina

You might also like