1. Your client needs to track costs at a very granular level for reporting purposes.
What does the greatest granularity in Cost Accounting (cost layer granularity) include?
a) Item, lot, serial, project, task, and country of origin
b) Item, lot, serial, subinventory, locator, and grade
c) Item and lot
d) Item, lot, serial, subinventory, grade, project, task, and country of origin
e) Item, lot, serial, subinventory, project, and task
3. A Manufacturing Engineer, responsible for creating and maintaining work definitions, has
scheduled the Process Item Structure Changes to Work Definitions program.
However, after the execution of the program, the engineer did not receive a notification with the
details of the item structure changes.
Which two privileges does the engineer need to have to receive the notification?
a) Data access to the manufacturing plant in which the item structure change was performed.
b) Manage Work Definitions function privilege.
c) Data access to item structures.
d) Data access to items.
e) Data access to item attributes.
6. Your customer is a light assembly manufacturing company that doesn't require shop floor control.
A Manufacturing Engineer wants to generate a work definition automatically for some items and
wants to eliminate the explicit maintenance of work definitions.
Which three steps must they perform and verify in the Work Definition area?
a) Ensure there is only one default standard operation at any point in time.
b) Ensure the item is a standard item with a secondary item structure.
c) Ensure the predefined work definition name ORA_MAIN is active.
d) Select a resource to be used in automatic work definition by enabling the Default attribute
for automatic work definition.
e) Select a standard operation to be used in automatic work definition by enabling the Default
attribute for automatic work definition.
10. A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up
with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for
which operations are performed on them?
a) Set up the machines with a cost element type of "Resource" by selecting Cost Element Set
Common.
b) Set up the machines with a cost element type of "Resource" by selecting Cost Element Set
ABC.
c) Set up the machines with a cost element type of "Overhead" by selecting Cost Element Set
ABC.
d) Set up the machines with a cost element type of "Overhead" by selecting Cost Element Set
Common.
12. To reduce the likelihood of noncompliance, defects, or failures in manufacturing operations by
using integrated, inline checks for equipment qualification and to adhere to standard operating
procedures and regulatory requirements, your client wants to enable Quality Equipment When
Assigning Work or Reporting Resource Usage in Fusion Manufacturing.
Which three steps should you perform to implement this functionality?
a) Create a virtual asset and associate an equipment profile with it.
b) Associate an equipment profile with an equipment resource.
c) Create qualification records for the maintenance asset number tied to a production
equipment resource instance.
d) Create qualification requirements and qualification profiles.
e) Associate the resource instance defined for an equipment resource with an asset number in
Oracle Maintenance Cloud to validate that the equipment is qualified.
13. The client is deploying the Workstation functionality in manufacturing for their Production
operators.
Which two statements are true about creating shift notes during work execution at a workstation for
operator hand-offs?
a) You can create notes only after finishing the work order operation execution.
b) You can create notes before starting the work order operation execution or after finishing
the work order operation execution.
c) You cannot verify, and optionally edit, the generated text before saving.
d) You can use the AI Assist option to help with the note text and format.
15. Your client requires the capability to cancel undercomplete work orders whenever the
production quantities fall short of the expected quantity and not to manually close the work order
every time.
Which three statements are true?
a) The undercompletion tolerance specified at the Plant Parameter level overrides the
undercompletion tolerance values set at the work order level. (1)
b) The undercompletion tolerance type can only be in percentage.
c) This is applicable to BOTH Discrete and Batch work orders.
d) You can set up the Undercompletion Tolerance Percentage at the Plant Parameter level.
e) You can set up the Undercompletion Tolerance Type and Undercompletion Value attributes
at item level in PIM. (3)
17. Your client is planning to override the Plant Production Calendar with One or More Date-
Effective Work Center Calendars. You need to explain the considerations when using the Override
Plant Production Calendar feature.
Which three statements are true when overriding the production calendar?
a) Even if there are override calendars, the lead time calculation in days for an item remains
based on the plant calendar and not on work center calendars.
b) Supplier operations used in outside processing use the work center calendar in work order
scheduling.
c) While defining override calendars, you need to ensure that the date-effective range for a
work center calendar association can be overlapping and contiguous.
d) The Work Execution Work Area Infolets and Manage Production Exceptions page are based
on the plant calendar and not on work center calendars.
e) When the user executes a search action in the Review Dispatch List page, if more than one
work center is selected, and if the start date or completion date is based on shift-based
search, then the operations are queried based on the shifts of the plant calendar only.
18. In a manufacturing plant, a Production Operator in a given shift completes a car assembly and
reports this using orderless completion by referencing a work definition.
Which two are reported by the referenced work definition in orderless reporting?
a) Resource usage
b) Material usage
c) Processing steps
d) Scrap material
e) Return material
19. Your customer has multiple distribution centers and a few manufacturing plants. The plants
manufacture different items with some overlap between them. The distribution centers stock parts
from all the plants.
A Corporate Engineering team is responsible for centrally defining items and catalogs. This team
defines the items and sets the attributes for most parameters.
The respective distribution centers and manufacturing plants must be allowed to change some
attributes locally.
What is the best way to achieve this?
a) Set up plants and distribution centers as inventory organizations, and the Corporate
Engineering organization as an item organization.(2)
b) Set up plants and the Corporate Engineering organization as item organizations, and
distribution centers as inventory organizations. (2)
c) Set up plants, distribution centers, and the Corporate Engineering organization as inventory
organizations.
d) Set up plants and the Corporate Engineering organization as inventory organizations, and
distribution centers as item organizations.
e) Set up plants as inventory organizations, and distribution centers and the Corporate
Engineering organization as item organizations.
22. A Production Supervisor queries a work order, WO-1025, from the Manage Work Orders page.
On the Entering Edit Work Order: WO-1025 page, the supervisor finds a General Information,
Operations, and History tab, but no Reservations tab.
What are two reasons for the Reservations tab not being displayed for WO-1025?
a) It is not a Drop-Ship work order.
b) It is not a Configured Item work order.
c) It is not a Pick-to-Order work order.
d) It is not a Plan-to-Produce work order.
e) It is not a Back-to-Back work order.
23. A Production Operator needs to load work order operation transactions from an external system
into Manufacturing Cloud.
What is the correct sequence of tasks to achieve this?
a) Export file to UCM server > Load data to data repository > Process import operations
transactions > Load file from UCM to interface table.
b) Load data to data repository > Export file to UCM server > Process import operations
transactions > Load file from UCM to interface table.
c) Load data to data repository > Export file to UCM server > Load file from UCM to interface
table > Process import operations transactions.
d) Load data to data repository > Load file from UCM to interface table > Export file to UCM
server > Process import operations transactions.
24. You have been asked to set up cost estimates for 10 different purchased items.
Which two tasks can you perform to achieve this?
a) Run the "Update Item Cost Estimate" ESS process.
b) Import a spreadsheet.
c) Use the Mass Edit functionality.
d) Enter cost estimates directly into the UI.
e) Call a web service.
28. A Manufacturing Cloud user wants to print information from a work order in PDF format.
Which three reports can the user print directly from the Work Order screen by using the Print PDF
action?
a) Work Order Traveler
b) Resource List
c) Print Labels
d) Print Component List
e) Bill of Material