Calcs by Checked by Date
Column Base Design : Default single column example: ULS stability checks
C15
Input Data
Base length A (m) 1
Base width B (m) 1
Columns Col 1 Col 2
C (m) 0.3 0
D (m) 0.3
E (m)
F (m)
Stub column height X (m) 1.5
Base depth Y (m) 0.4
Soil cover Z (m) 0
Concrete density (kN/m3) 24
Soil density (kN/m3) 18
Soil friction angle (°) 22
Base friction constant 0.5
Rebar depth top X (mm) 50
Rebar depth top Y (mm) 50
Rebar depth bottom X (mm) 50
Rebar depth bottom Y (mm) 50
ULS ovt LF: Self weight 0.9
ULS LF: Self weight 1.4
Max. SLS bearing pr. (kN/m2) 150
ULS SF Overturning 1
ULS SF Slip 1
fc' base (MPa) 32
fc' columns (MPa) 32
fy (MPa) 500
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date
Loading Data
Unfactored loads
Column LF LF P Hx Hy Mx My
Load Case: Number ULS ULS (kN) (kN) (kN) (kNm) (kNm)
ovt
1 1 1.5 1.5 57 0 0 5.7 3.8
Sketch of Base
ACI 318 - 2014 Y
C1
X
D1
B
A
Y
Mx
P
Hx
X
Z
Y
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date
Output for Load Case 1
Note: The calculated flexural reinforcement was used in the calculations.
Output for Load Case 1
Soil pressure (ULS) (kN/m2) 188.96
Soil pressure (SLS) (kN/m2) 126.83
SF overturning (ULS) 4.72
SF overturning (SLS) 5.10
Safety Factor slip (ULS) >100
Safety Factor slip (SLS) >100
Bottom
Design moment X (kNm/m) 7.92
Reinforcement X (mm2/m) 50
Design moment Y (kNm/m) 7.12
Reinforcement Y (mm2/m) 45
Top
Design moment X (kNm/m) 0.00
Reinforcement X (mm2/m) 0
Design moment Y (kNm/m) 0.00
Reinforcement Y (mm2/m) 0
Linear Shear X (MPa) 0.000
vc (MPa) 0.679
Linear Shear Y (MPa) 0.000
vc (MPa) 0.679
Linear Shear Other (MPa) 0.000
Punching Shear (MPa) 0.066
vc (MPa) 1.400
vcu (MPa) 3.11
v col face (MPa) 0.22
Cost 163.00
Load Case:1 Legend
Max M (+)
ACI 318 - 2014 Y Y Max M (-)
Max Shear
0.30 0.30
X X
1.00
1.00
0.30 0.30
1.00 1.00
Y Y
Mx Mx
P P
Hx Hx
1.50 1.50
0.00
0.00
0.40 0.40
126.83 kN/m^2 188.96 kN/m^2
Soil Pressures at SLS Soil Pressures at ULS
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date
Schematic reinforcement of Base
R8-SA
5Y12-A-200 (B1) E G E
F F
F F
col1 5Y12-B-200 (B2)
E G E
SECTION: col1
PLAN
4Y16-E +
4Y16-F +
3Y16-G
3R8-SA
B B B B B
SECTION