Upper Solu Protection Works Revised

Uploaded by

Abinash Neupane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views5 pages

Upper Solu Protection Works Revised

Uploaded by

Abinash Neupane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

L

K
J
I
H
1.
94

G
Panel 3
3
.9
11

F
NOTES:
1. All dimensions are in meter & Elevations in masl.

6
.6
E

L
2. Excavation shall be carried out with due care & precaution to match

11
the excavated profile with foundation geometry.
Panel 2 3. Before starting placing the concrete, all excavated surfaces shall be
D

K
18
cleaned of all loose materials, soil, boulders, organic materials etc.

12.
4. Concrete Grade For RCC Retaining wall
M25 - All Structural Concrete.
C

J
6
M10 - Binding Layer (PCC)
6.2 5. Reinforcement shall be of high yield strength cold twisted deformed
B

bars of grade Fe-500 conforming to IS:1786(1995).

I
EXPANSION JOINT
6. Stone soling shall be at least 150mm thick and compacted with sand

84
infill.

0.
A

H
7. Stability of slope shall be checked during construction and support
structures shall be provided as per requirement under the
supervision of site engineers.

G
8. The SBC of the site must be 400KN/m2.
9. Designed based in provided Survey date;modification can be made
1.5

F
0 according to site condition.
90

10. Minimum Projection of Wall towards soil portion should be 4 m.


10.

11. The wall may be shifted towards the cable trench if excavation on

E
0

3
2.0

the hillside proves challenging,based on the site condition.


.0

4
15

.8
15
0

D
0.4

0.0 2.0 4.0 6.0 8.0 10.0m

SCALE
C

Panel 1
B
A

UN
ITS ENGIN

Y
NC
EE
RI
NG TA
CONSUL

PLAN
L
K

Y
J
Geo-Textile
8.00

I
RL:2190.00
2187.53

H
2186.08

5.00
10
1
2.70 0.45 2186.08

L
K
Y
10.00
1.00
8.55

2182.03

J
I
8.55

H
4.50
2177.53
2176.53
2177.53
3.56

1.00
KEY PLAN
ELEVATION Y-Y SECTION H-H

1.00
3.14 2.96
7.10

NOTES:
1. All dimensions are in meter & Elevations in masl.
2. Excavation shall be carried out with due care & precaution to match
the excavated profile with foundation geometry.
3. Before starting placing the concrete, all excavated surfaces shall be
cleaned of all loose materials, soil, boulders, organic materials etc.
Geo-Textile Geo-Textile 4. Concrete Grade For RCC Retaining wall
8.00 M25 - All Structural Concrete.
8.00
RL:2190.30 M10 - Binding Layer (PCC)
RL:2190.30
5. Reinforcement shall be of high yield strength cold twisted deformed
bars of grade Fe-500 conforming to IS:1786(1995).

5.00
6. Stone soling shall be at least 150mm thick and compacted with sand
5.00

10 10
1 infill.
1
7. Stability of slope shall be checked during construction and support
Varies Varies
structures shall be provided as per requirement under the
supervision of site engineers.
8. The SBC of the site must be 400KN/m2.
9. Designed based in provided Survey date;modification can be made
according to site condition.
10. Minimum Projection of Wall towards soil portion should be 4 m.
11. The wall may be shifted towards the cable trench if excavation on
8.92

9.32
the hillside proves challenging,based on the site condition.

0.0 2.0 4.0 6.0 8.0 10.0m

2177.53 SCALE
2177.53
1.00

2.59 2.22
1.00 2.03 1.49
5.81
4.52

UN
SECTION I-I

ITS ENGIN
SECTION J-J

Y
NC
EE
RI
NG TA
CONSUL
L
K

Y
J
Geo-Textile

I
8.00 Geo-Textile
8.00

H
RL:2190.80
RL:2191.00

5.00
10

5.00
1 10
1

L
Varies
2187.53

K
Y

J
I
H
9.64

10.00
2182.03
4.50 2182.03

KEY PLAN
2177.53

4.50
2177.53
1.00

0.74
1.49 SECTION L-L

1.00
SECTION K-K 1.94
3.23
NOTES:
1. All dimensions are in meter & Elevations in masl.
2. Excavation shall be carried out with due care & precaution to match
the excavated profile with foundation geometry.
3. Before starting placing the concrete, all excavated surfaces shall be
cleaned of all loose materials, soil, boulders, organic materials etc.
4. Concrete Grade For RCC Retaining wall
M25 - All Structural Concrete.
M10 - Binding Layer (PCC)
5. Reinforcement shall be of high yield strength cold twisted deformed
bars of grade Fe-500 conforming to IS:1786(1995).
6. Stone soling shall be at least 150mm thick and compacted with sand
infill.
7. Stability of slope shall be checked during construction and support
structures shall be provided as per requirement under the
supervision of site engineers.
1.00 8. The SBC of the site must be 400KN/m2.
9. Designed based in provided Survey date;modification can be made
according to site condition.
1.00 10. Minimum Projection of Wall towards soil portion should be 4 m.
11. The wall may be shifted towards the cable trench if excavation on
1.00 the hillside proves challenging,based on the site condition.

0.0 2.0 4.0 6.0 8.0 10.0m

5.00
1.00
1.10
SCALE
4.00

0.30
3.00

1.00
0.70

0.40
1.00

UN
SIDE DRAIN

ITS ENGIN
2.00 2.50 3.00

Y
NC
EE
RI
NG TA
CONSUL

TYPES OF GABBION WALL


X
Y

varies

10 Nos of
54-16a'-16-150 ∅20mm
54-16b'-12-150 8.10

1 1

2*38-16d-12-150 6*19-17b-12-100 X
Y
PANEL 3
2182.03
6*53-17c-12-125
16 Nos of
2*30-16c-16-150 ∅20mm distrubuted
in 4 layers
6*27-17a-12-100
2 2
54-16a-20-150 54-16b-16-150 LEGEND
2*54-13-20-150 40 - 01a- 20 - 150
2177.53
Bar Spacing (mm)

Rebar diameter (mm)

Bar Mark
2*39-14a-16-150 622-15-12-300
ELEVATION Y-Y REINFORCEMENT Total no. of bars

TYPICAL SECTION X-X REINFORCEMENT


NOTES:
SCALE A-A 1. All dimensions are in meter & Elevations in masl.
2. Excavation shall be carried out with due care & precaution to match
the excavated profile with foundation geometry.
3. Before starting placing the concrete, all excavated surfaces shall be
cleaned of all loose materials, soil, boulders, organic materials etc.
4. Concrete Grade For RCC Retaining wall
M25 - All Structural Concrete.
M10 - Binding Layer (PCC)
5. Reinforcement shall be of high yield strength cold twisted deformed
bars of grade Fe-500 conforming to IS:1786(1995).
6. Stone soling shall be at least 150mm thick and compacted with sand
infill.
7. Stability of slope shall be checked during construction and support
structures shall be provided as per requirement under the
2*61-16c-12-150 2*61-16c-12-150 supervision of site engineers.
54-16a-20-150 54-16a'-16-150 8. The SBC of the site must be 400KN/m2.
6*53-17c-125 6*17-17a'-12-100 9. Designed based in provided Survey date;modification can be made
54-16b-16-150 54-16b'-12-150 according to site condition.
10. Minimum Projection of Wall towards soil portion should be 4 m.
6*19-17b-12-100 11. The wall may be shifted towards the cable trench if excavation on
50-18a-20-110 6*27-17a-12-100
the hillside proves challenging,based on the site condition.
50-18b'-20-110
6*17-17a'-12-100 6*53-17c-12-125

54-16a-20-150 54-16a'-16-150
2*61-16c-12-150

UN
ITS ENGIN

Y
NC
EE
RI
NG TA
CONSUL
SECTION 2-2 SECTION 1-1
SCALE B SCALE B

0.0 1.0 2.0 3.0 4.0 5.0m

SCALE A

0.0 0.5 1.0 1.5 2.0 2.5m

SCALE B
LEGEND
40 - 01a- 20 - 150
varies
Bar Spacing (mm)

Rebar diameter (mm)

Bar Mark
24-20a'-16-150
Total no. of bars

NOTES:
24-20b'-12-150
1. All dimensions are in meter & Elevations in masl.
2*42-21b-12-150 2. Excavation shall be carried out with due care & precaution to match
the excavated profile with foundation geometry.
3. Before starting placing the concrete, all excavated surfaces shall be
Z
cleaned of all loose materials, soil, boulders, organic materials etc.
13-19c-16-150 4. Concrete Grade For RCC Retaining wall
M25 - All Structural Concrete.
Anchorage 24-18d-20-150 M10 - Binding Layer (PCC)
as per 2182.03 5. Reinforcement shall be of high yield strength cold twisted deformed
site Condition bars of grade Fe-500 conforming to IS:1786(1995).
24-21a-16-150 6. Stone soling shall be at least 150mm thick and compacted with sand
infill.
7. Stability of slope shall be checked during construction and support
Z structures shall be provided as per requirement under the
supervision of site engineers.
24-18c-20-150 24-20a-16-150
8. The SBC of the site must be 400KN/m2.
PANEL 3 9. Designed based in provided Survey date;modification can be made
24-18a-20-150 according to site condition.
31-19c-16-150 2177.53 10. Minimum Projection of Wall towards soil portion should be 4 m.
11. The wall may be shifted towards the cable trench if excavation on
4-19a-16-150 the hillside proves challenging,based on the site condition.
12. Anchorage Bar shall be provided as per site condition.
19-19b-16-150 24-18b-20-150
0.0 1.0 2.0 3.0 4.0 5.0m

SCALE
TYPICAL SECTION Z-Z REINFORCEMENT

UN
ITS ENGIN

Y
NC
EE
RI
NG TA
CONSUL