Residential Design Calcs
Residential Design Calcs
PROJECT TITLE:
PROPOSED RESIDENTIAL BUILDING ON PLOT
NO. KARAI/GIKAMBURA/9476
CLIENT:
MR VICTOR NYAMWEYA NYAKENANDA
Project PROPOSED RESIDENTIAL DEVELOPMENT REINFORCED CONCRETE COUNCIL
Client MR VICTOR Made by Date Page
Location CRITICAL SLAB 3 to 5: B to E KE 06-Sep-2025 1
2-WAY SPANNING INSITU CONCRETE SLABS to BS 8110:1997 (Table 3.14) Checked Revision Job No
Originated from RCC94.xls v2.1 © 1999-2003 BCA for RCC MO - LJK07
Lx = 5.7 m
Top cover mm 20 (Normal weight concrete) Plan
Btm cover mm 20
Edge 4
Edge 2
LOADING characteristic EDGE CONDITIONS
Self weight kN/m² 3.60 Edge 1 D C = Continuous
Extra dead kN/m² 1.00 Edge 2 D D = Discontinuous Ly = 6.3 m
Total Dead, gk kN/m² 4.60 gf= 1.40 Edge 3 C
Imposed, qk kN/m² 1.50 gf= 1.60 Edge 4 C E
Design load, n kN/m² 8.84 See Figure 3.8 and clauses 3.5.3.5-6 Edge 3
SUPPORT REACTIONS (kN/m char uno) (See Figure 3.10) Sum ßvx = 0.736 Table 3.15
EDGE 1 EDGE 2 EDGE 3 EDGE 4 Sum ßvy = 0.660
B, 3-5 5, E-B E, 3-5 3, E-B equations
ßv 0.294 0.264 0.442 0.396 19 & 20
Dead kN/m 7.72 6.92 11.58 10.38
Imposed kN/m 2.52 2.26 3.78 3.39
Vs kN/m 14.8 13.3 22.3 20.0
OUTPUT/SUMMARY
SHORT LONG EDGE 1 EDGE 2 EDGE 3 EDGE 4
PROVIDE SPAN SPAN B, 3-5 5, E-B E, 3-5 3, E-B
MAIN STEEL T10 @ 200 B1 T10 @ 200 B2 T10 @ 175 T1 T10 @ 200 T2 T10 @ 200 T1 T10 @ 200 T2
SUPPORTS ABOVE (m) H (mm) B (mm) End Cond BELOW (m) H (mm) B (mm) End Cond
Support 1 3.00 400 300 P 3.45 400 300 P
Support 2 3.00 400 300 P 3.45 400 300 P
Support 3
Support 4
Support 5
Support 6
Support 7
LOADING DIAGRAM
4 5
REACTIONS (kN)
SUPPORT 1 2
ALL SPANS LOADED 477.6 477.6
ODD SPANS LOADED 477.6 477.6
EVEN SPANS LOADED 204.0 204.0
Characteristic Dead 204.0 204.0
Characteristic Imposed 120.0 120.0
Project PROPOSED COMMERCIAL DEVELOPMENT REINFORCED CONCRETE COUNCIL
400 400
300 300
200 200
100 100
0 0
0 1 2 3 4 5 6 0 1 2 3 4 5 6
-100 -100
-200 -200
-300 -300
SUPPORT No 1 2
Elastic M 315.4 315.4 ~ ~ ~ ~ kNm/m
Redistributed M 315.4 315.4 ~ ~ ~ ~ kNm/m
ßb 1.000 1.000 ~ ~ ~ ~ ~
Redistribution 10.0%
SPAN No 1
Elastic M 257.76 ~ ~ ~ ~ ~
Redistributed M 257.76 ~ ~ ~ ~ ~
ßb 1.000 ~ ~ ~ ~ ~
SHEARS (kN)
600 600
400 400
200 200
0 0
-200 -200
-400 -400
-600 -600
0 1 2 3 4 5 6 0 1 2 3 4 5 6
SPAN No 1
Elastic V 477.6 477.6 ~ ~ ~ ~
Redistributed V 477.6 477.6 ~ ~ ~ ~
Elastic V ~ ~ ~ ~ ~ ~
Redistributed V ~ ~ ~ ~ ~ ~
COLUMN MOMENTS
(kNm) 1 2
ALL SPANS Above 168.7 -168.7
LOADED Below 146.7 -146.7
ODD SPANS Above 168.7 -168.7
LOADED Below 146.7 -146.7
EVEN SPANS Above 72.1 -72.1
LOADED Below 62.7 -62.7
Project COMMERCIAL DEVELOPMENT REINFORCED CONCRETE COUNCIL
Client MR VICTOR Made by Date Page
Location CRITICAL BEAM 03 KE 7-Sep-25 4
CONTINUOUS BEAM (Analysis & Design) to BS 8110:1997 Checked Revision Job No
Originated from RCC41.xls v2.1 on CD © 1999-2003 BCA for RCC MO - LJK08
MATERIALS
fcu 25 N/mm² gm, steel 1.05 Cover to link 30 mm
fy 460 N/mm² gm, conc 1.5 h agg 20 mm
SECTION
h 400 mm
b 200 mm
with 2 bars per 200 face X X
and 2 bars per 400 face
ie. 400 x 200 columns with 4 bars
4T32
AXIAL LOAD, kN
1500
4T25
1000 4T20
4T16
500
4T12
0.1fcuAc
0 0
0 50 100 150 200 250 300
Mx' kNm
My min
KEY
2000
1648 4T32
AXIAL LOAD kN
1500
1390 4T25
1132
1000 4T20
4T16
500 506
413 4T12
0.1fcuAc
0 0
0 10 20 30 40 50 60 70 80 90
My' kNm
REINFORCED CONCRETE
Project PROPOSED RESIDENTIAL DEVELOPMENT
COUNCIL
Client MR VICTOR Made by Date Page
Location COLUMN 3 KE 6-Sep-25 1
SYMMETRICALLY REINFORCED RECTANGULAR COLUMN DESIGN, BENT
ABOUT TWO AXES TO BS 8110:1997 Checked Revision Job No
Originated from RCC53.xls v2.1 on CD © 1999-2003 BCA for RCC MO - LJK07
MATERIALS
fcu 25 N/mm² gm, steel 1.05 Cover to link 30 mm
fy 460 N/mm² gm, conc 1.5 h agg 20 mm
SECTION
h 300 mm
b 200 mm
with 2 bars per 200 face X X
and 2 bars per 300 face
ie. 300 x 200 columns with 4 bars
KEY
Mx min
2000
4T32
AXIAL LOAD, kN
1500
4T25
1000 4T20
4T16
500
4T12
0.1fcuAc
0 0
0 20 40 60 80 100 120 140 160 180
Mx' kNm
KEY
My min
2000
1648 4T32
AXIAL LOAD kN
1500
1390 4T25
1132
1000 4T20
4T16
500
4T12
180
150 0.1fcuAc
0 0
0 10 20 30 40 50 60 70 80
My' kNm
REINFORCED CONCRETE
Project PROPOSED RESIDENTIAL DEVELOPMENT COUNCIL
Client MR VICTOR Made by Date Page
DIMENSIONS mm
BASE COLUMN
L = 1500 h = 400
B = 1500 b = 200
depth H = 300
ex = 0 ey =
v yy 45%
PUNCHING SHEAR . .
d ave = 240 mm u crit = 4074 mm
As prov = 0.214 % v max = 1.764 N/mm² at col face
v = 0.303 N/mm² vc = 0.430 N/mm²
REINFORCED CONCRETE
Project PROPOSED RESIDENTIAL DEVELOPMENT COUNCIL
Client MR VICTOR Made by Date Page
DIMENSIONS mm
BASE COLUMN
L = 1800 h = 400
B = 1800 b = 200
depth H = 300
ex = 0 ey =
v yy 53%
PUNCHING SHEAR . .
d ave = 238 mm u crit = 4056 mm
As prov = 0.212 % v max = 1.829 N/mm² at col face
v = 0.390 N/mm² vc = 0.429 N/mm²
REINFORCED CONCRETE
Project PROPOSED RESIDENTIAL DEVELOPMENT COUNCIL
Client MR VICTOR Made by Date Page
DIMENSIONS mm
BASE COLUMN
L = 1000 h = 300
B = 1000 b = 200
depth H = 300
ex = 0 ey =
v yy 19%
REINFORCEMENT . .
Mxx = 12.3 kNm Myy = 16.0 kNm
b = 1000 mm b = 1000 mm
d = 245 mm d = 235 mm
As = 132 mm² As = 179 mm²
PROVIDE 5 T10 @ 225 B1 PROVIDE 5 T10 @ 225 B2
As prov = 393 mm² As prov = 393 mm²
. .
BEAM SHEAR . .
Vxx = 22.0 kN at d from col face Vyy = 36.0 kN at d from col face
v = 0.090 N/mm² v= 0.153 N/mm²
or Vxx = 0.0 kN at 2d from col face or Vyy = 0.0 kN at 2d from col face
v = 0.000 N/mm² v= 0.000 N/mm²
vc = 0.388 N/mm² vc = 0.398 N/mm²
PUNCHING SHEAR . .
d ave = 240 mm u crit = 2000 mm
As prov = 0.164 % v max = 0.825 N/mm² at col face
v = 0.021 N/mm² vc = 0.393 N/mm²
Project PROPOSED RESIDENTIAL DEVELOPMENT REINFORCED CONCRETE COUNCIL
Client MR VICTOR Made by Date Page
Location FLIGHT KE 6-Sep-25 1
STAIR FLIGHTS AND LANDINGS to BS 8110:1997 Checked Revision Job No
Originated from RCC71.xls' v2.1 on CD © 1999-2003 BCA for RCC MO - LJK07
MATERIALS
fcu 25 N/mm² gm 1.5 concrete Min bar Ø = 10
fy 460 N/mm² gm 1.05 steel Max bar Ø = 12
h agg 20 mm Density 24 kN/m³
Cover 25 mm (Normal weight concrete) Nominal top steel ? Y
a= 0 mm landing A h = 150
b = 1840 mm flight waist = 150
c = 1630 mm landing B h = 150
d = -100 mm
e = -100 mm
Going = 230 mm L = 3470
Rise = 1350 mm total 8 treads
Rise = 150 mm each step Rake = 33.11 º
LOADING
Imposed 3.00 kN/m² 25.87 kN/m ult 22.85 kN/m ult
Flight finishes 1.20 kN/m² (12.19 + 5.51) (10.03 + 5.51)
Landing finishes 1.20 kN/m²
DESIGN
LANDING A, gk = 3.60 + 1.20 = 4.80 kN/m² n = 1.4 x 4.80 + 1.6 x 3.0 = 11.52 kN/m²
FLIGHT, gk = 6.10 + 1.20 = 7.30 kN/m² n = 1.4 x 7.30 + 1.6 x 3.0 = 15.02 kN/m²
LANDING C, gk = 3.60 + 1.20 = 4.80 kN/m² n = 1.4 x 4.80 + 1.6 x 3.0 = 11.52 kN/m²
MATERIALS
fcu 25 N/mm² gm 1.5 concrete Min bar Ø = 10
fy 460 N/mm² gm 1.05 steel Max bar Ø = 12
h agg 20 mm Density 24 kN/m³
Cover 25 mm (Normal weight concrete) Nominal top steel ? Y
DIMENSIONS
a = 1200 mm depth, h = 150 mm
b = 1200 mm width, w = 2800 mm
c = 200 mm
d = -100 mm L = 2700 mm
LOADING
LANDING Imposed 3.00 kN/m² 90.8 kN ult 87.2 kN ult
Finishes 1.20 kN/m² 32.4 kN/m ult 31.2 kN/m ult
Slab 3.60 kN/m² n = 1.4 x 4.80 + 1.6 x 3.0 = 11.52 kN/m²
gk qk
Flight a reaction 12.19 5.51 kN/m n1 = (1.4 x 12.19 + 1.6 x 5.51)/1.80 = 14.37 kN/m²
Flight b reaction 10.03 5.51 kN/m n2 = (1.4 x 10.03 + 1.6 x 5.51)/1.80 = 12.69 kN/m²
DESIGN
Zero shear is at (32.42 - 17.25) /11.52 = 1.318 m from left
M = 32.42 x 1.318 - 17.25 x 0.818 - 11.52 x 1.318²/2 = 18.62 kNm/m
d = 150 - 25 - 6 = 119 mm K = 0.0526 As = 381 mm²/m
PROVIDET12 @ 290 B = 390 mm²/m
. T10 @ 400 T in span
L/d = 2,700 /119 = 22.689 < 20.0 x 1.218 = 25.620 allowed OK
Project Job Ref.
PROPOSED RESIDENTIAL DEVELOPMENT
Section Sheet no./rev.
MASONRY W ALL
Calc. by Date Chk'd by Date App'd by Date
KELVIN 5/18/2025 MOSES
Masonry details
Masonry type Aggregate concrete blocks (25% or less formed voids)
Compressive strength of unit punit = 20.0 N/mm2
Mortar designation iv
Least horizontal dimension of masonry units lunit = 100 mm
Height of masonry units hunit = 200 mm
Category of masonry units Category II
Category of construction control Normal
Partial safety factor for material strength m = 3.5
Thickness of load bearing leaf t = 100 mm
Effective thickness of masonry wall tef = 100 mm
Height of masonry wall h = 2400 mm
Effective height of masonry wall hef = 2400 mm
lb t
B
xedge
Bearing details
Beam spanning out of plane of wall
W idth of bearing B = 100 mm
Length of bearing lb = 100 mm
Edge distance xedge = 0 mm
Compressive strength from Table 2 BS5628:Part 1 - aggregate concrete blocks (25% or less formed voids)
Mortar designation Mortar = "iv"
Block compressive strength punit = 20.0 N/mm2
Characteristic compressive strength (Table 2c) fkc = 4.95 N/mm2
Characteristic compressive strength (Table 2d) fkd = 9.80 N/mm2
Height of solid block hunit = 200.0 mm
Project Job Ref.
PROPOSED RESIDENTIAL DEVELOPMENT
Section Sheet no./rev.
MASONRY W ALL
Calc. by Date Chk'd by Date App'd by Date
KELVIN 5/18/2025 MOSES
DEAD
GROUND FLOOR LOADS LOADS LIVE LOADS
CALCULATIONS
WALLING 2.55m*0.2m*18KN/m^3 9.18KN/m
1200
200
600
2 2
72.0 kN/m 72.0 kN/m
Material details
Characteristic strength of concrete fcu = 25 N/mm2
Characteristic strength of reinforcement fy = 500 N/mm2
Project Job Ref.
PROPOSED RESIDENTIAL DEVELOPMENT
Section Sheet no./rev.
STRIP FOOTING
Calc. by Date Chk’d by Date App’d by Date
KELVIN 5/18/2025 MOSES