WELCOME EVERYBODY
To a seminar on Construction Management by Manish Gupta
Overview of Contents
Construction management
Aspects of construction management
Planning and Scheduling techniques
Management software
Conclusion
2
Construction Management
Sticking to convention, it may defined broadly as: The Science and art of planning, organizing, scheduling and executing the work. Use of integrated systems and procedures by a team of professionals during project design and construction. given by the CMAA. It takes a discipline uniquely tailored to the planning design and construction process of capital projects.
3
Importance of Management
The importance of Management can be viewed through the following prisms Increase in the productivity by combining human resources and machinery in the right ingredients. Increase in the reliability in the modern age, so important a factor in the success of a project.
Consideration
The factors that require prudent management can be summarily stated as
Material Resources Manpower Resources
MPower In Management
Man Methods Money Materials Machines Marketing
6
1. 2. 3. 4. 5. 6.
Requisites Of A Manager
Adaptability
Intelligence
Humility
Ambitious
Project Delivery Methods
Traditional design-bid-build At-Risk construction management Multiple-Prime contracting
Design-Build
Basic Aspects
1.
Contract management
2. 3.
Resource management
Time management and scheduling
Contract Management
Contract - An agreement between the owner and
the contractor for the completion of the work
within the scheduled time, following drawings,
designs and workmanship as given by the
consultant.
10
Contracting Process
1
VISUALISATION/CONCEPT
2 MARKET SURVEY 3 4 5 6
APPOINTMENT OF CONSULTANT PRELIMINARY REPORT LAYING DOWN PROJECT PARAMETERS LOCATIONS (SITE SURVEY) 6a SITE SURVEY PROJECT REPORT EVALUATION OF PROJECT REPORT DECISION TO IMPLEMENT PROJECT 9a FORMATION OF COMPANY 9b RAISING FUNDS 9c LOANS EQUITY 11
7 8 9
Contracting Process Contd..
10 APPOINTMENT OF ARCHITECTS 11 APPROVAL OF SITE
11a NOTIFICATION
11b PAYMENT 11c POSSESSION
12 LAND ACQUISITIONS (FENCING) 13 APPROVAL FROM LOCAL/STATUATORY BODIES 14 SELECTION OF MODE OF EXECUTION
DEPARTMENTAL
15 PREPARE DRAWING 16 PREPARE ESTIMATES 17 SELECT SUPPLIERS
OUTSIDE AGENCIES
15 INVITATION FOR REGISTRATION 16 PRE QUALIFICATION 17 REGISTRATION
12
Contracting Process Contd..
18 SELECT CONTRACTORS 18 PRE-BID CONFERENCE 19
INVITATION FOR TENDER
19 BUDGET SANCTIONS
20 SUBMISSION OF TENDER
20a DRAFT CONTRACT
21 TENDER OPENING 22 SCRUTINY OF TENDERS 23
TABULATION OF RATES
24 CLARIFICATION/FREAK RATES 25 SELECTION OF MAIN CONTRACTOR 26 ISSUE OF WORK ORDER
13
Contracting Process Contd..
27 SIGNING OF CONTRACT
27a DETAILED SITE SURVEY 27b DETAILED PLANNING
28 APPOINTMENT OF SITE/PROJECT MANAGER
27c FINALISE EQUIPMENT ORDERS
29 APPOINTMENT OF STAFF
29a DELIVERY OF CONSTRUCTION EQUIPMENTS
30 SITE DEVELOPMENT
30a CLEARING SITE - LEVELLING/FILLING/MARKING 30b INFRASTRUCTURE/LAYING SERVICE 30c SUPPLY OF MATERIALS
31 START OF CONSTRUCTION
31a STAFF RECRUITMENT/TRANSFER 31b APPOINTMENT OF SUB-CONTRACTORS FOR FORM WORK/SHUTTERING, REINFORCEMENT, FOUNDATIONS, PRESTRESSED CONCRETE, FABRICATION 14
32 CO-ORDINATE SERVICES
Contracting Process Contd..
33 PROGRESS REVIEW (MONTHLY)
33a BILLING/COLLECTIONS
34 RECONCILLIATION AND CORRECTIVE STEPS
35 COMPLETION
36 CLEAN-UP/FINISHING TOUCHES
37 HANDING OVER
38 FINALISATION AND BALANCE SHEET
15
Resource Management
The basic objective of resource management is to supply and support the field operations.This includes: Labour management Material management Equipment management
16
Time Management and Scheduling
The planning involves a listing of tasks that must be performed to bring about the projects completion. Scheduling is the laying out of the actual jobs of the project in the time order in which they have to be performed. Control is Underlying managerial function, begins with reviewing the difference between the schedule and actual performance once the project has began.
17
Planning and Scheduling Techniques
The various planning and scheduling methods used for management of a project can be divided into the following two groups:
Conventional methods
Network methods
18
Conventional Methods
1.
2.
3.
Gantt or Bar chart : A project is divided into different jobs which are represented by horizontal bars on a time scale. Milestone chart : Similar to bar chart except that it shows important events in the form of vertical arrows on the horizontal bars representing the activity. Flow chart : A brief and simple graphic representation showing relationship between activities.
19
Gantt or Bar Chart
SR NO 1 2 DESCRIPTION MAR APR MAY JUN JUL AUG SEP OCT
FOUNDATIONS SUPER STRUCTURE
ROOF
FABRICATE DOOR & WINDOW FRAMES FIX DOOR & WINDOW FRAMES INTERNAL SERVICES & FINISHING DATE OF REVIEW OF PROGRESS
20
Milestone Chart
SR NO 1 2 3 4 5 6 DESCRIPTION MAR 1 FOUNDATIONS SUPER STRUCTURE ROOF FABRICATE DOOR & WINDOW FRAMES FIX DOOR & WINDOW FRAMES INTERNAL SERVICES & FINISHING DATE OF REVIEW OF PROGRESS 14 15 2 APR 3 4 5 6 7 9 10 11 12 8 MAY JUN JUL AUG SEP OCT
13
MILESTONES: 1. COMPLETE EXCAVATION 2. COMP. LEAN CONCRETE .. LEGEND 14. COMP. WHITE WASH COMPLETED MILESTONE 21 15. COMP. PAINTING SCHEDULED MILESTONE
Network Method
This includes: 1. Critical Path Method (CPM) : Generally used for repetitive projects where one has a fairly accurate assessment of time. 2. Program Evolution and Review Technique (PERT) : Generally used for research and development projects which are not repetitive in nature.
22
How to Develop a Network ??
Analyse and make a note of all the activities required for the completion of the project. Arrange these activities in their correct logical sequence. Contemplate the sub-dividing of different activities into phases or sections to introduce the concept of performing jobs simultaneously or concurrently.
23
1.
2.
3.
Network for a Building Project
5 2 9 CONST. SUB STRUCTURE SECTION I 7W 16 12 5
23 EXCAVATE FOUNDATIONS SECTION II AND III 6W 11 6 4 COMPLETE WORK 7
START WORK 1
0
23
5 5 3
CONST. SUB STRUCTURE SECTION IV 10W
15 6 15 24
CRITICAL PATH ??
It is the path along the network, which
requires the longest time from start to completion of
the project.
25
Identification Of Critical Path
By closer examination of the activity duration time for different activities along critical path and reducing them wherever possible in a feasible manner. By re-planning the network by introducing number of parallel or concurrent activities on the critical path.
26
Identification of Critical Path Contd..
Transfer of resources from non-critical activities to the critical activities to reduce the duration of activity time along the critical path. Addition of more resources to the critical activity to effect reduction in activity duration Reduction in the scope of work or by changing or lowering of the performance requirements of some activities- which are relatively few as compared to numerous activities in the project.
27
Management Software
Project management involves lots of computer work. Numerous software are available for complete management activities. Some can be listed as: PRISM (TCS) MS-PROJECT (MICROSOFT) INSTAPLAN (WIPRO) HARVARD PROJECT MANAGER (NIIT) PRIMAVERA (PRIMAVERA INSTITUTE, USA)
28
1. 2. 3. 4. 5.
Conclusion
The study of Construction practices in the industry today leads me to conclude that Vital as it is to be fundamentally strong, it is just as pertinent to have excellent managerial skills. In the years to come, the success or failure of any project will be determined by how good the utilization of resources has been. Responsibility in the use of the available resources, will ensure that the structures of tomorrow are far better built to handle natural disasters in addition to those engineered by man.
29
Acknowledgements
Firstly Id like to thank our HOD for enabling us to avail of the multimedia facility. Our faculty whove had the patience to sit through all of this! My knowledgeable audience whove been tremendously encouraging today.
30
References
Manual of Construction Project Management by S K GUHA THAKURTA and K R SHAH A text book on Construction Management and Planning by B SENGUPTA and H GUHA A Management Guide to PERT/CPM by JEROME D WIEST and FERDINAND K LEVY A text book on Building Construction by SUSHIL KUMAR A paper presented on Construction Management by K N NARAYANA IYENGAR WWW.CMAA.COM 31