Professional Documents
Culture Documents
1
Histogram filename:Rolls.mtw
• Asked to investigate the length of wall paper. 72 data is collected from random
samples of products for 6days.
• Output Y is in Column 1. Column 2 is the time of collecting samples, column 3 is
the date of collecting samples. Output histogram.
• File > Open Worksheet
: Rolls.mtw → filename
• Graph > Histogram
:Yards → X
頻度
105 4 1 3
108 5 1 2
1
99 6 1 0
100 7 1 94 99 104 109
104 8 1 Yards
: : :
2
See the data structure before making graph.
Basic Statistics (1) filename:Rolls.mtw
正規曲線を伴った、ヤードのヒストグラム
Yards histogram with normal curve
Session window output 8
7
6
N Mean Median TrMean StDev SE Mean 5
4
Counts
yards 72 100.81 101.00 100.83 3.81 0.45
頻度
3
2
1
Minimum Maximum Q1 Q3 0
yards 93.00 108.00 98.00 103.75 92 97 102 107
ヤード
yards 3
Basic Statistics (2) file name:Rolls.mtw
Continue
Graphical Summary adds many information to graph.
Descriptive Statistics
Variable: Yards
4
Run Chart (Time Series Plot) filename:Rolls.mtw
95 1 1
100 2 1
104 3 1
105 4 1
108 5 1
99 6 1
100 7 1
104 8 1 109
101 9 1
105 10 1 104
102 11 1
Yards
101 12 1 99
105 1 2
107 2 2 94
: : :
インデックス 10 20 30 40 50 60 70
: : :
5
Box plots filename:Rolls.mtw
ヤード
100 2 1
99
50%
104 3 1
105 4 1 94 25%
108 5 1
99 6 1 minimum?
100 7 1
104 8 1
101 9 1
105 10 1 109
102 11 1 Yards
104
101 12 1
105 1 2 99
107 2 2
94
: : :
1 2 3 4 5 6
: : : Day
6
Scatter plots filename: SuppCust.mtw
This data represents the skid weights. Study if the weights the customer measures match
the weights the shipper provides.
Study the relationship between two variables with scatter plots.
File>Open Worksheet
:SuppCust.mtw → filename
Graph > Plot
:Customer Wt → Y
:Supplier Wt → X
Supplier Wt Customer Wt
420
336 325 410
400
Customer wt
418 375 390
355 367 380
顧客重量 370
445 385 360
365 375 350
455 395 340
330
395 395 320
405 365 350 400 450
: : 生産者重量
Shipper wt
7
File operation
1.Open worksheet.
File > Open Worksheeet
Various icons
Session window
Calculation results
Project Manager
Title,
Can find
Hidden items Graph
Work sheet
Data
9
Icon of Project Manager
1.Display one by one graphs which were made so far.
10
Other icons
1.Display hidden session window.
Click “Show Session Folders” icon.
5.Modify graphs.
Activate graph.(Click graph)
Click “Edit” icon. (or Double click graph.)
Tools Box and Attribute Box are displayed. You can put color,
change size and move with using these.
11
Arrange Data filename:weight.mtw
1.Open file.
File > Open Worksheet
weight.mtw → filename
It can do with “copy” and “paste”, too. But it become hard with big data.
Please memorize above methods. Because it is useful.
12
Calculation filename:weight.mtw
Use same file.
1.Put the sum of ‘Weight_1’ and ‘Weight_2’ into column C7.
Calc > Calculator
C7 → Store result in
’Weight_1’+’Weight_2’→ Expression
13
Others 1
2.Can delete cells’ data (Delete Button). Can delete column, too.
14
Others 2
15