CHECKLIST FOR HANDING OVER DOCUMENTS

EFECO
Client/ Consultant : Project Name

Location :
Visual Inspection Description EFECO ACC MZ Approval Approval Ins. Req Status No

SR. No.

1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 HVAC 26 27 28 29 30 31 32 33 34 Plumbing Fire Protection System 3

Installation of Pipes & Inspection Installation of Zone Control Valve Installation of Fire Hose reel and Cabinet Installation of Landing Valve and Cabinet Installation of Fire Hose Reel Valve Installation of Pressure Reducing Valve Installation of Gate Valve Pressure test for pipes Installation of Sprinklers Removal of Sprinkler Caps Installation of Ridgid Supports Installation of Water Supply Pipes & Fittings Installation of Valve Assembly Installation of BIB Tap Installation of Water Hammer Arrestor Installation of Drainage Pipes & Fittings Installation of Drains Pressure testing of pipes Installation of Heaters Installation of Clean Outs Installation of FCU Installation of AHU Installation of Chilled water pipe with insulation Installation of PI ducting Installation of valve package with FCU / AHU Installation of FCU / AHU control panel Installation DDC Panel Installation of control wiring Installation BMS cables Termination of Power/ Control/ BMS cable Installation of Drain pipe with insulation Installation VCD / FD Installation of Grills & Diffusers Installation of Access doors

SR. No.

Visual Inspection Description

Approval Approval Ins. Req Status No

CHECKLIST FOR HANDING OVER DOCUMENTS

EFECO

Inspection Comments

Inspection Comments