PROJECT: DATE:
STATUS
SR. NO. PARAMETERS
OK NOT OK
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
.
DATE:
REMARKS
ONSULTANT
ME
GNATURE
MC
ME
GNATURE
Pre-functional checklist for AHU
PROJECT: DATE:
STATUS
PARAMETERS
OK NOT OK
GENERAL
AHU capacity (CFM)
AHU static pressure (mm of w.g)
AHU blower motor capacity (kW)
Blower pulley & motor pulley alighnment done properly
Check belt tension
Blower motor body earthing done properly
Check tightness of bolts at motor terminals.
Permanent labels affixed including for fans
Fan alignment proper and casing is dent-free
Limit switches installed and operational
Vibration isolators installed
Access doors close properly - no leaks
All sensors installed and properly working
Filters installed and in proper condition and as per design
Ducts properly insulated
Air-flow dampers installed and operational
Actuator for air-flow dampers installed wherever needed
Thermal insulation properly installed
PIPING & VALVES
Pipes properly insulated
Butterfly valves installed at Inlet/Outlet for AHU
Balancing valves installed at outlet
Temperature and pressure gauges installed
Modulating valves installed with actuator
Condensate drain pipe routed propely.
All coils are clean and in proper condition
STARTER PANEL & VFD
Cable connection done properly, check cable tightness
Control panel wiring as per the specificaitons
VFD powered (wired to the controlled equipment)
VFD interlocked to the control system
Proper cooling arrangement provided to VFD
VFD unit properly programmed
HEAT RECOVERY WHEEL
Enthalpy wheel connected to motor by belt
Check belt tension
Body earthing to the HRW motor done propely
Filter installed for the fresh air inlet
Damper installed for fresh air entry into AHU
Exhaust fan installed for the HRW
Ducting for exhaust fan in proper condiiton, no leaks
All cables terminated and fixed tightly
EXHAUST PURGE FAN
Exhast fan installed as per specifications
Check the belt tightness
Cable connection done properly, check cable tightness
Control panel wiring as per the specificaitons
Body earthing to the HRW motor done propely
All cables terminated and fixed tightly
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
REMARKS
Pre-functional checklist for Heat Recovery Wheel
PROJECT: DATE:
STATUS
PARAMETERS
OK NOT OK
Supply air fan / Fresh air fan
Supply fan capacity (CFM)
Supply fan static pressure (mm of w.g)
Supply fan blower motor capacity (kW)
Blower pulley & motor pulley alighnment done properly
Check belt tension
Blower motor body earthing done properly
Check tightness of bolts at motor terminals.
Permanent labels affixed including for fans
Fan alignment proper and casing is dent-free
Limit switches installed and operational
Vibration isolators installed
Access doors close properly - no leaks
All sensors installed and properly working
Filters installed and in proper condition and as per design
Ducts properly insulated
Air-flow dampers installed and operational
Actuator for air-flow dampers installed wherever specified
Heat Recovery Wheel
Enthalpy wheel connected to motor by belt
Check belt tension
Body earthing to the HRW motor done propely
Filter installed for the fresh air inlet
Damper installed for fresh air entry into AHU
Exhaust fan installed for the HRW
Ducting for exhaust fan in proper condiiton, no leaks
All cables terminated and fixed tightly
Exhaust fan
Exhaust fan capacity (CFM)
Exhaust fan static pressure (mm of w.g)
Exhaust fan blower motor capacity (kW)
Blower pulley & motor pulley alighnment done properly
Check belt tension
Blower motor body earthing done properly
Check tightness of bolts at motor terminals.
Permanent labels affixed including for fans
Fan alignment proper and casing is dent-free
Limit switches installed and operational
Vibration isolators installed
Access doors close properly - no leaks
All sensors installed and properly working
Filters installed and in proper condition and as per design
Ducts properly insulated
Air-flow dampers installed and operational
Actuator for air-flow dampers installed wherever specified
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
REMARKS
PROJECT :
LOCATION OF UNIT : FLOOR CATERED :
EXHAUST DUCT C/S AREA = sq. ft EXHAUST DUCT C/S AREA = sq. ft
AIR DBT ENTERING HRW (DBT-1) = deg C AIR DBT ENTERING HRW (DBT-3) = deg C
AIR WBT ENTERING HRW (WBT-1) = deg C AIR WBT ENTERING HRW (WBT-3) = deg C
AIR DBT LEAVING HRW (DBT-2) = deg C AIR DBT LEAVING HRW (DBT-4) = deg C
AIR WBT LEAVING HRW (WBT-2) = deg C AIR WBT LEAVING HRW (WBT-4) = deg C
F X (h1-h2) X 100 =
EFFICIENCY OF WHEEL =
E X (h4-h3)
Remarks -
EXHAUST DUCT C/S AREA = sq. ft EXHAUST DUCT C/S AREA = sq. ft
IR = Vr = IR = Vr =
CURRENT CURRENT
IY = Vy = IY = Vy =
MEASUREMENT MEASUREMENT
IB = Vb = IB = Vb =
Vr = Vy = Vb =
HEAT RECOVERY WHEEL Power =
Ir = Iy = Ib =
Remarks -
PROJECT: DATE:
STATUS
PARAMETERS
OK NOT OK
GENERAL
CSU capacity (CFM)
CSU static pressure (mm of w.g)
CSU blower motor capacity (kW)
Blower pulley & motor pulley alighnment done properly
Check belt tension
Blower motor body earthing done properly
Cable connection done properly, check cable tightness
Control panel wiring as per the specificaitons
Check tightness of bolts at motor terminals.
Permanent labels affixed including for fans
Fan alignment proper and casing is dent-free
Limit switches installed and operational
Vibration isolators installed
Access doors close properly - no leaks
All sensors installed and properly working
Filters installed and in proper condition and as per design
Ducts properly insulated
Air filters installed as per specifications
Air-flow dampers installed and operational
Actuator for air-flow dampers installed wherever needed
Thermal insulation properly installed
PIPING & VALVES
Pipes properly insulated
Butterfly valves installed at Inlet/Outlet for CSU
Balancing valves installed at outlet
Temperature and pressure gauges installed
Modulating valves installed with actuator
Condensate drain pipe routed propely.
All coils are clean and in proper condition
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
REMARKS
Pre-functional checklist for FCU
PROJECT: DATE:
STATUS
PARAMETERS
OK NOT OK
GENERAL
FCU capacity (CFM)
FCU static pressure (mm of w.g)
FCU blower motor capacity (kW)
Blower pulley & motor pulley alighnment done properly
Check belt tension
Blower motor body earthing done properly
Cable connection done properly, check cable tightness
Control panel wiring as per the specificaitons
Check tightness of bolts at motor terminals.
Permanent labels affixed including for fans
Fan alignment proper and casing is dent-free
Limit switches installed and operational
Vibration isolators installed
Access doors close properly - no leaks
All sensors installed and properly working
Filters installed and in proper condition and as per design
Air filters installed as per specifications
Actuator for air-flow dampers installed wherever needed
Thermal insulation properly installed
PIPING & VALVES
Pipes properly insulated
Butterfly valves installed at Inlet/Outlet for FCU
Balancing valves installed at outlet
Temperature and pressure gauges installed
Modulating valves installed with actuator
Condensate drain pipe routed propely.
All coils are clean and in proper condition
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
SIGNATURE SIGNATURE
REMARKS
Pre-functional checklist for TFA
PROJECT: DATE:
STATUS
PARAMETERS
OK NOT OK
GENERAL
TFA capacity (CFM)
TFA static pressure (mm of w.g)
TFA blower motor capacity (kW)
Blower pulley & motor pulley alighnment done properly
Check belt tension
Blower motor body earthing done properly
Check tightness of bolts at motor terminals.
Permanent labels affixed including for fans
Fan alignment proper and casing is dent-free
Limit switches installed and operational
Vibration isolators installed
Access doors close properly - no leaks
All sensors installed and properly working
Filters installed and in proper condition and as per design
Ducts properly insulated
Air filters installed as per specifications
Actuator for air-flow dampers installed wherever needed
Thermal insulation properly installed
PIPING & VALVES
Pipes properly insulated
Butterfly valves installed at Inlet/Outlet for TFA
Balancing valves installed at outlet
Temperature and pressure gauges installed
Modulating valves installed with actuator
Condensate drain pipe routed propely.
All coils are clean and in proper condition
STARTER PANEL & VFD
Cable connection done properly, check cable tightness
Control panel wiring as per the specificaitons
VFD powered (wired to the controlled equipment)
VFD interlocked to the control system
Proper cooling arrangement provided to VFD
VFD unit properly programmed
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
REMARKS
Pre-functional checklist for Fresh Air Fans
PROJECT: DATE:
STATUS
PARAMETERS REMARKS
OK NOT OK
GENERAL
Unit capacity (CFM)
Unit static pressure (mm of w.g)
Unit blower motor capacity (kW)
Blower pulley & motor pulley alighnment done properly
Check belt tension
Blower motor body earthing done properly
Check tightness of bolts at motor terminals.
Permanent labels affixed including for fans
Fan alignment proper and casing is dent-free
Limit switches installed and operational
Vibration isolators installed
Filters installed as per specifications
Access doors close properly - no leaks
All sensors installed and properly working
Air-flow dampers installed and operational
Actuator for air-flow dampers installed wherever needed
STARTER PANEL & VFD
Cable connection done properly, check cable tightness
Control panel wiring as per the specificaitons
VFD powered (wired to the controlled equipment)
VFD interlocked to the control system
Proper cooling arrangement provided to VFD
VFD unit properly programmed
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
Pre-functional checklist for Exhaust Air Fans
PROJECT: DATE:
STATUS
PARAMETERS
OK NOT OK
GENERAL
Unit capacity (CFM)
Unit static pressure (mm of w.g)
Unit blower motor capacity (kW)
Blower pulley & motor pulley alighnment done properly
Check belt tension
Blower motor body earthing done properly
Check tightness of bolts at motor terminals.
Permanent labels affixed including for fans
Fan alignment proper and casing is dent-free
Vibration isolators installed
Air-flow dampers installed and operational
Actuator for air-flow dampers installed wherever needed
Bird-mesh lovers installed at outlet
STARTER PANEL
Cable connection done properly, check cable tightness
Control panel wiring as per the specificaitons
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
REMARKS
DUCT PRESSURE TEST REPORT
Client DUPONT
PMC JLL
Consultant BBN ESSENDO CONSULTANT
Package
HVAC
Vendor Vayucon systems
PROJECT: DATE:
STATUS
SR. NO. PARAMETERS
OK NOT OK
4 Power measurement
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
.
ATE:
REMARKS
NSULTANT
ME
GNATURE
ME
GNATURE
PROJECT : LOCATION OF UNIT :
Readings
Air Velocity fpm m/s RY= V
Count
CHW inlet temp (deg F) CHW outlet temp. (deg F) Temp. difference (deg F) Water Flow (USGPM) Water side TR Coil Efficiency (%)
Remarks -
PRE-FUNCTIONAL CHECK LIST FOR DX UNITS
DATE :
PROJECT
SERIAL NUMBER :
Manufacturer /
NAME PLATE DATA Design Data actual data
COMPRESSOR
Manufacturer (Make)
Model No.
Type (hermetic or open)
Refrigerant
Quantity of refrigerant for initial charge (KG)
Working Pressure
COMPRESSOR MOTOR
Motor manufacturer
Type
KW Rating
Electrical Characteristics(± 10% voltage variation)
Efficiency
Starter manufacturer & mode of start
Starting Current
FLA
Locked rotor current
EVAPORATOR
Type of Evaporator
Water flow (USGPM)
Actual capacity of chiller at above conditions (TR)-Material & thickness
Insulation is proper & as specified
CONDENSER
Type of condenser
No. of condenser fans
Condenser air-flow
GENERAL
Isolation valves and balancing valves installed
Pipe fittings and accessories routed as per drawing
Pressure testing compeleted
Vibration isolators installed
Evaporator air vent provided
Vaccuming complete
Piping porperly insulated
Piping system charged
Grilles provided on condenser fan outlets
Condensate tray provided for indoor units
Condensate pipe routed as per drawing.
Ducting for indoor units completed (for ductable split units)
Diffusers installed on the ducts
Air control dampers provided if any
Condenser fins in good condition
ELECTRICAL & CONTROLS
Breaker rating installed as per SLD
Cable size installed as per SLD
Cable terminations are proper at both ends
Power wiring done properly
All electrical components grounded properly
Confirm all field wiring connections have been made
Confirm Control Center display is operating
Body earthing of equipment done properly
REMARKS :-
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
COMMENTS
PROJECT :
CALCULATION
Readings
Air Velocity fpm m/s Voltage Current Power (kW)
Count
Remarks -
PROJECT: Date:
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
Design
Actual
PROJECT: DATE:
START
1
FINISH
START
2
FINISH
START
3
FINISH
START
4
FINISH
START
5
FINISH
START
6
FINISH
START
7
FINISH
START
8
FINISH
START
9
FINISH
START
10
FINISH
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
RESULT AFTER 24 HRS.
WATER BALANCING REPORT
PROJECT: DATE:
CONTRACTOR CONSULTANT
NAME
NAME
SIGNATURE
SIGNATURE
T&C PMC
NAME
NAME
SIGNATURE
SIGNATURE
DATE:
ACTUAL FLOW
FLOW AFTER
BEFORE
BALANCING IN % of DESIGN
BALANCING IN
USGPM
USGPM
COPPER PIPING PRESSURE TEST REPORT .
PROJECT: DATE:
START
1
FINISH
START
2
FINISH
START
3
FINISH
START
4
FINISH
START
5
FINISH
START
6
FINISH
START
7
FINISH
START
8
FINISH
START
9
FINISH
START
10
FINISH
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
Pre-functional check list for VRF system .
PROJECT: DATE:
LOCATION : VRF Circuit designation
Indoor Unit numbering
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
Remarks
Pre-functional check list for VRF system .
PROJECT: DATE:
LOCATION : VRF CAPACITY
STATUS
SR. NO. PARAMETERS REMARKS
OK NOT OK
Indoor Units (IDUs)
Outdoor Units (ODUs)
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
Functional check-sheet for VRF units
Project :
Location :-
Unit Achieved IN OUT
Unit Capacity Design CFM
Designation CFM DBT WBT DBT WBT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
VRF Outdoor Unit Test Record
Rated Power
Sign
Functional check list for VRF .
PROJECT: DATE:
STATUS
SR. NO. PARAMETERS
OK NOT OK
CONTRACTOR CONSULTANT
NAME NAME
SIGNATURE SIGNATURE
T&C PMC
NAME NAME
SIGNATURE SIGNATURE
.
DATE:
REMARKS
ONSULTANT
ME
GNATURE
MC
ME
GNATURE
Functional check-sheet for Fire-dampers
Project :
Location :- AHU :-
Quantity of controllers and Dampers modulating when Position of damper when Position of damper
Damper type Damper controller
Sr. No. dampers tallying as per drawing manually operated via fire alarm not active during active fire alarm
(supply / Return) installed (Yes/No) (yes/no) controller (yes/no) (Open /Closed) (Open /Closed)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
REMARKS -
T&C
CONSULTANT
PMC