COOLING TOWER : Heat rejection: 26,46,000 kCal/hr Flow Rate : 2100 USGPM
3.1 Nos 3 37.2
Minimum Note: 2W+1S
VFD controlled power panel, inclusive of automatic bypass starters The HVAC
subcontractor shall consider all the necessary power & control cabling, cable tray
works,conduits, double earthing with GI wire,terminations etc from CT panel to
motors.However incoming power cable & earthing upto each CT Panel shall be
provided by Electrical Subcontractor
• 230 V, 50 HZ
Power Supply –
Automatic chemical dosing .The necessary power panel and corresponding Preferable UPS
cabling ( in the cable tray) with necessary supports upto the system from power SupplyPower
4.3.1 Nos 2 2 4 - #VALUE!
source to be considered by the HVAC sub-contractor.Panel should be BMS point should be
compatible. within 1 meter
from the
controller.
ELECTRICAL LOAD OF HVAC ITEMS
BOQ Item Final Stand Elect Load Elect Load - Elect Load
Description UOM Working SINGLE PHASE
No. Qty BY KW Each Working Stand BY
5.5.1 Treated fresh air unit (12.0TR/ 3100 CFM) ESP : 25mm WC Each 2 2 4 4 4
Treated Fresh Air Handling Unit local control panel
6.0.1 1.0 TR Fan Coil Units covering all the above items. Each 33 48 81 81 81
6.0.2 1.5 TR Fan Coil Units covering all the above items. Each 19 36 55 55 55
6.0.3 2.0 TR Fan Coil Units covering all the above items. Each 40 77 117 117 117
6.0.4 2.5 TR Fan Coil Units covering all the above items. Each 18 35 53 53 53
6.0.5 3.0 TR Fan Coil Units covering all the above items. Each 2 2 4 4 4
Cassette Unit 4 Way Discharge (Chilled Water) -For Fixed Linked Bridges (FLB)
7.0.1 Capacity : 5.5 TR / 2200 CFM / ESP : 25mm WC - PTB Server room Each 4 4 8 8 8
Capacity : 3.0 TR / 1900 CFM / ESP : 25mm WC - ATCT - Data Equipment Room ,
7.0.2 Each 4 8 12 12 12
UFC Link Room,IT & C Room,UPS & Battery Room
7.0.3 Capacity : 8.5TR / 4560 CFM / ESP : 25MM WC - ATCTB - CNS Equipment Room Each 2 4 6 6 6
7.0.4 Capacity : 4.0TR / 2625 CFM / ESP : 25MM WC - ATCTB - CNS Rooms Each 6 12 18 18 18
7.0.5 Capacity : 3.0TR / 1880CFM / ESP : 25MM WC - ATCTB - IT Server Room Each 2 4 6 6 6
7.0.6 Capacity : 2.0TR / 1175 CFM / ESP : 25MM WC - ATCTB - CNS Rooms Each 20 40 60 60 60
Power & Control cabling between indoor & Outdoor units - HVAC Scope
control panel for Axial Fans (Fresh Air & Dual speed)
5.1.7 Hydro Pneumatic Domestic Water Pump (ATC Tower) Nos. 1 1 1 1 1 Three Phase
Capacity : 105 LPM Head : 80mt (1w+1s)
5.1.8 Hydro Pneumatic Flushing Water Pump (ATC Tower) Nos. 1 1 1 1 1 Three Phase
Capacity : 50 LPM Head : 80mt (1w+1s)
5.1.9 Hydro Pneumatic Domestic Water Pump (CFR Main) Nos. 1 1 1 1 1 Three Phase
Capacity : 100 LPM Head : 90mt (1w+1s)
5.2.1 Capacity : 200LPM Head : 20Mt (1w + 1s) - Raw water tank to WTP transfer Nos. 1 1 1 2.2 2.2 Three Phase
5.3.1 Capacity : 20LPM Head : 20Mt (1w) - CFR Satellite Domestic water tranfer Nos. 1 1 1 1 Three Phase
7.1.1 Submersible Pumps (Dewatering Application) Nos. 4 1 1 4 4 Three Phase
Capacity : 100 LPM HEAD : 20mt (1W+1s)
7.1.2 Submersible Pumps (Sewage Application) Nos. 3 1 1 1 1 Three Phase
Capacity : 25 LPM HEAD : 15mt (1W+1s)
7.1.3 Submersible Pumps (Sewage Application) Nos. 1 1 1 1.1 1.1 Three Phase
Capacity : 100 LPM HEAD : 50mt (1W+1s)
7.1.4 Submersible Pumps (Dewatering Application) Nos. 5 1 1 3 3 Three Phase
Capacity : 60 LPM HEAD : 20mt (1W+1s)
7.1.5 Submersible Pumps (Sewage Application) Nos. 1 1 1 1 1 Three Phase
Capacity : 60 LPM HEAD : 40mt (1W+1s)
7.1.6 Submersible Pumps (Main Sewage Near STP Substation) Nos. 1 2 1 1 1 Three Phase
Capacity : 1200 LPM HEAD : 30mt (2W+1s)
Fire Fighting
5.1.1 Sprinkler Pumps Capacity : 3800 LPM Head : 145 Meter Nos. 2 320 320 Three Phase
5.1.2 Hydrant Pumps Capacity : 3800 LPM Head : 145 Meter Nos. 2 320 320 Three Phase
5.1.3 Jockey Pumps Capacity : 180 LPM Head : 145 Meter Nos. 4 30 30 Three Phase
Total Required Load for HVAC, PHE & FF System (A+B+C) 3980 3980