Professional Documents
Culture Documents
Relux Informatik AG, Dornacherstrasse 377, CH-4018 Basel, Switzerland. Tel +41 61 333 07 70, Fax +41 61 333 07 72, info@relux.ch, www.relux.ch
Preface
A warm welcome! This Manual is intended to assist you in familiarising yourself with our Relux Professional calculation and visualisation program. In what follows: Menu options are in bold and italic print. Buttons are in bold print Windows and inscriptions are enclosed between The Manual is currently available in English, German and Italian. Other languages are under preparation, you will find the latest information on our website. Relux Professional 2007 has been translated into: Bosnian, Bulgarian, Croatian, Czech, Danish, Dutch, English, French, German, Hungarian, Italian, Norwegian, Polish, Portuguese, Russian, Slovenian, Spanish, Swedish. Relux Vision 1.1 is available in English and German. We also offer training courses at regular intervals; the dates are published in the Internet. We would welcome your praise, criticism, questions or suggestions. Our hotline is at your service free-of-charge at support@relux.ch or on Tel. +41 61 333 07 70 or contact our distributors in the particular countries. We wish you every success and much fun in your reading, Your Relux Team
Relux Informatik AG Dornacherstr. 377 | Postfach CH-4018 Basel tel: +41 61 333 07 70 fax: +41 61 333 07 72 web: www.relux.ch
All rights reserved, including rights to photomechanical reproduction and storage in electronic media
TABLE OF CONTENTS
1 Installation............................................................................................................. 6 1.1 1.2 1.3 1.4 1.5 1.6 1.7 2 2.1 2.2 2.3 3 3.1 System recommendation................................................................................. 6 Installation of the program and the luminaire catalogue off a DVD ....................... 6 Installation of the program as a download ....................................................... 10 Relux Online Update ..................................................................................... 10 Relux Administrator ...................................................................................... 13 Relux Vision................................................................................................. 16 New in Relux Professional 2007...................................................................... 17 Toolbars...................................................................................................... 20 Project Manager ........................................................................................... 23 Action window ............................................................................................. 29 Relux Express .............................................................................................. 31 Project data ........................................................................................ 31 Room data.......................................................................................... 32 Luminaire selection.............................................................................. 35 Luminaire positioning with EasyLux........................................................ 36 Project output with Relux Express.......................................................... 38 Project data ........................................................................................ 40 Room data.......................................................................................... 41 Room elements (doors, windows, skylights, pictures)............................... 44 Luminaire selection.............................................................................. 47 Designing a scene ............................................................................... 47 Calculations ........................................................................................ 51 Project output ..................................................................................... 51 Saving a project .................................................................................. 55
Project examples .................................................................................................. 31 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8
General program settings....................................................................................... 56 4.1 4.2 4.3 4.4 4.5 4.6 Project data................................................................................................. 56 Enter location .............................................................................................. 57 Select language ........................................................................................... 58 Page setup .................................................................................................. 59 Options (general settings and defaults) ........................................................... 60 Coordinates origin/placing grid/drawing grid .................................................... 63 Room types ................................................................................................. 65 Multi-room capability .................................................................................... 75 Importing floor plans in DXF and ASCII format................................................. 79 Importing background images ....................................................................... 82 Exporting rooms........................................................................................... 84 Positioning objects ....................................................................................... 85
Importing and exporting floor plans and background images ...................................... 79 6.1 6.2 6.3
Positioning object groups .............................................................................. 93 Breaking up groups .................................................................................... 121 Luminaire selection..................................................................................... 123 The Luminaire selection tab.............................................................. 124 The Online tab................................................................................ 128 The Imported companies tab ............................................................ 128 The Plug-In tab............................................................................... 129 The Sensors tab.............................................................................. 130 The Individual luminaire tab ............................................................. 131 The Luminaire type tab.................................................................... 132 Aligning luminaires ............................................................................ 138
Luminaires ......................................................................................................... 123 8.1.1 8.1.2 8.1.3 8.1.4 8.1.5 8.1.6 8.1.7 8.2 8.2.1
Room elements, basic objects, 3D objects.............................................................. 141 9.1 Room elements .......................................................................................... 141 Selection .......................................................................................... 141 Positioning........................................................................................ 144 Editing and properties of room elements .............................................. 144 Selection .......................................................................................... 150 Positioning........................................................................................ 151 Drawing ........................................................................................... 152 Editing and properties of basic objects ................................................. 153 Importing 3D objects in 3DS, VRML and DXF format .............................. 159 Generating furniture .......................................................................... 161 Selection .......................................................................................... 163 Positioning........................................................................................ 165 Editing and properties of 3D objects .................................................... 166 9.1.1 9.1.2 9.1.3 9.2 9.2.1 9.2.2 9.2.3 9.2.4 9.3 9.3.1 9.3.2 9.4 9.4.1 9.4.2 9.4.3
3D objects................................................................................................. 163
10
Materials............................................................................................................ 168 10.1 Colours/Reflectance.................................................................................... 168 10.2 Textures ................................................................................................... 169 10.3 Special features in picture selection .............................................................. 179 10.4 Relux Vision materials................................................................................. 181
11
Measuring elements ............................................................................................ 182 11.1 Selection ................................................................................................... 184 11.2 Positioning ................................................................................................ 186 11.3 Drawing .................................................................................................... 186 11.4 Editing and adjusting settings ...................................................................... 188
12
Calculations........................................................................................................ 192 12.1 Calculation manager ................................................................................... 192 12.2 Artificial light calculation variant ................................................................ 194 12.2.1 12.3.1 Calculation tab ............................................................................... 194 Glare rating tab .............................................................................. 201 12.3 Measuring areas tab................................................................................. 198
12.4 Daylight calculation variant ....................................................................... 202 12.5 Artificial and daylight calculation variant ..................................................... 202 12.6 Emergency lighting calculation variant........................................................ 202 12.7 Sensors calculation variant ....................................................................... 203 12.8 Solar altitude graph calculation variant....................................................... 204 12.9 Calculating the luminous intensity for observers............................................. 205 13 Outputs ............................................................................................................. 206 13.1 Screen outputs .......................................................................................... 206 13.2 Changing screen outputs............................................................................. 209 13.2.1 13.2.2 13.2.3 13.2.4 Changing the Floor plan action window .............................................. 209 Changing the 3D view action window................................................. 211 Changing the Results output action window........................................ 215 Changing the 3D luminance action window......................................... 218
13.3 Page preview ............................................................................................. 221 13.4 Print manager............................................................................................ 223 14 Daylight calculations ........................................................................................... 226 14.1 Entering the project location ........................................................................ 226 14.2 Entering the North angle ............................................................................. 227 14.3 Options: Exterior area tab ........................................................................ 228 14.4 Canopy ..................................................................................................... 228 14.5 External obstructions .................................................................................. 231 14.6 Sky models ............................................................................................... 232 14.7 Daylight factor ........................................................................................... 232 14.8 Daylight calculations................................................................................... 233 14.8.1 14.8.2 15 Daylight ........................................................................................... 233 Solar altitude graph ........................................................................... 237
14.9 Efficiency Daylight ...................................................................................... 238 Economics.......................................................................................................... 239 15.1 Economics: Daylight ................................................................................... 239 15.2 Artificial light: Luminaire efficiency ............................................................... 243 16 17 Offer program .................................................................................................... 248 Annex................................................................................................................ 250 17.1 Shortcut table for main menu ...................................................................... 250 17.2 Shortcut table for action window menus........................................................ 251 17.3 Shortcut table for toolbars........................................................................... 252 17.4 Shortcut table for context menus (right mouse button) in the action window ..... 253 17.5 List of Figures ............................................................................................ 254 17.6 Index........................................................................................................ 260
INSTALLATION
1
1.1
INSTALLATION
System recommendation
Recommended system requirements: Windows 2000/XP/Vista Pentium with 2 GHz or above, 1 GB RAM or more Graphics card supporting OpenGL The disk space required on your hard disk can vary depending on the installation type selected.
1.2
INSTALLATION
The installation program starts with the opening screen for selecting the language. The language selected here applies for the installation only. Different languages can be selected later on when using the program and also for the program outputs. You start the installation of the main program by pressing on Relux Professional 2007 (see Fig. 11).
Note
If the 2006 Version is already installed on your system, you will be prompted to first uninstall the 2006 Version. The project folder, the folder with the imported LDCs and the object directory will not be deleted. After this, you must re-start the installation. Enter a new path for the 2007 Version, and your 2006 folder will not be deleted. If you need your projects from Relux Professional 2006 and the imported LDCs at a later date, you can copy these into the Relux Professional 2007 directory. You should now select Install Relux Professional 2007. (See Fig. 12).
INSTALLATION
You should now read the licence agreement and accept it so that you can continue with the installation. Select the country in which you are located.
In the next window, you can specify a path for the installation of Relux Professional. The default proposed for Relux is C:\ Program Files.
Once the setup routine has copied the program data, you can specify the language for the user interface, the outputs and the database. (See Fig. 14) You can change these settings in the program at any time. You can choose whether you install the manufacturer data locally (this is recommended if you have sufficient memory space, duration approx. 20 minutes) or whether you wish to use this data off the DVD. In the case of a network, we recommend copying the data to a network drive, so that all users can access it. You can select the manufacturers by double-clicking the tick or by using +++ or ---.
INSTALLATION
Databases can subsequently be copied to the hard disk at any time using Relux Administrator (see ). If your project needs a luminaire from a company that is not installed on your hard disk, the program will prompt you to put the Relux Professional DVD in the drive.
INSTALLATION
10
1.3
If you are not yet a registered Relux user, you can register via the Please register link. You can select a user name and a password at this point. After logging on, you will be taken to the download zone where you can download the program under Relux Professional 2007. Once this file has been fully loaded, you can start the program installation by double-clicking on the file. The download version of Relux Professional contains a sample manufacturers database (Demo). You can either access the manufacturers databases online from within the program or download the desired manufacturers data from the download zone.
1.4
INSTALLATION
11
The update manager will start and you can specify whether Relux Professional should look for updates on a regular basis. We recommend you to leave this option switched on, with a time interval of two weeks. You will then always be able to work with the latest program and database versions.
Click on the Check now button. In the Relux Update window, you must then enter the user name and password that you selected when registering under My Relux on the Relux Informatik AG homepage. After you have entered your user data and clicked on the Update button, Relux Professional will look for updates.
INSTALLATION
12
The Select packages window will open, showing you all the updates that are available for your Relux Installation. You can select each item individually for the update in order to keep down the size of the download. From Fig. 18 "Select packages" window you can see that a program update is available. We recommend that you always install any program updates that are available. Updates are available for the Regent and TRILUX manufacturers databases. The Metalspot-Lus manufacturers database is new and can be added to the existing luminaire database. You can start downloading the files that you have selected by clicking on the Update button. If Relux Professional is still open, it will then be closed. If there are projects that have not been saved, you will be prompted to save these before the update is stated.
Note
By activating save password & login automatically you can have further checks for updates performed automatically, without a password.
INSTALLATION
13
1.5
Relux Administrator
Relux Administrator is used to administer manufacturers luminaire data on an individual basis. You can decide whether you wish to install a companys luminaire data locally or whether you will load this data off the DVD when you need it. You can also import data from companies that are not Relux members. You start Relux Administrator by selecting the menu option Extras Relux Administrator. Two different data sources can always be accessed for each individual manufacturer the current DVD (or network) or a local installation on your hard disk. The header in the window shows you the source folder for your current installation. If you wish to install the luminaire data locally, please put the Relux DVD in your drive, or select the path in your network where the luminaire data is stored.
The list of manufacturers on the DVD is read in from scratch each time the program is started and whenever the Select button is pressed (after the source folder has been confirmed). In other words, new manufacturers on future DVDs and new database versions will be displayed automatically and made available for DVD access. All manufacturers are listed in the manufacturers list. Two entries are possible for each manufacturer: CD/Net and Local. Local will only appear if you have installed one or more companies locally during installation of the RELUX program. The Show button allows you to specify which data you wish to access (DVD or local) and also allows you to hide a manufacturer during the RELUX luminaire selection. No data is deleted in this case. The company
INSTALLATION
14
remains visible in Relux Administrator and can be switched on again at any time. To install one or more manufacturers on a local basis, you should mark these in the list and select the Install Company locally button. Individual manufacturers that you have installed locally with Relux Administrator can be uninstalled again. To do this, select the entry and press the Uninstall Company button. If the company has been installed via Relux Administrator, the data will also be deleted from the hard disk. New manufacturer data that is not included on the DVD can be incorporated directly via the Add Company button. To do this, you should first copy the companys data manually onto the hard disk and then select the companys inf file. You can use the Import companies button to read in luminaire data from companies that are not Relux members. The light distribution curves of these luminaires must be in EULUM, IES, TM14, LTLI or CIE format. In the Company section of the Import luminaires window, the selection box will show you which companies have already been installed. All further steps relate to the company selected here. By pressing the New company button, you will open a window where you can enter a company name and the folder containing the luminaire data of the company that is not a Relux member.
INSTALLATION
15
After clicking on the OK button you will see from the Luminaires section of the Import luminaires window just how many luminaire files Relux Administrator has assigned to the company that is not a Relux member and has found to be correct. You can now use the New luminaires button to import luminaires from the currently selected company. The Assign section will show the line of the LDC file from which the luminaire name and the luminaire order number are being read in. This also specifies the code system employed to interpret the lines. In the case of ANSI, the file is already written in Windows ANSI code. It will then be shown correctly in the standard Windows programs, such as Notepad. Otherwise, the relevant OEM code will be taken as a basis (generally ASCII with the standard extensions for a PC). You can adapt these values to your requirements via the Edit button. You can remove the company that is not a Relux member again by pressing the Delete Company button. If required, you can also delete the associated subfolder and all its contents.
Note
If you wish to continue using the data, you must confirm this dialog with the No button.
INSTALLATION
16
1.6
Relux Vision
Relux Vision is automatically installed as well, in its demo mode. You can select Relux Vision materials and perform calculations with them. The outputs will, however, have a watermark added to them. You can order a program licence under the main menu option Help Relux Vision licence. The Licence window will open. You can then place an online order.
There is a separate manual available to Vision. Youll find it on the DVD or on our homepage www.relux.ch.
INSTALLATION
17
1.7
Managing several different scenes in a single project The new multi-room feature allows you to administer all the relevant scenes in just a single Relux project. You can combine indoor areas with outdoor installations at will. The project overview keeps you informed of the all rooms that are available.
Administering rooms and retaining an overview with the Calculation Manager and the Print Manager The new Calculation Manager helps you to retain an overview. It has a simple and clear structure and helps you plan all your light calculations in a readily manageable manner. The Print Manager has been suitably aligned for administering more than one room in a project. You can choose between individual outputs or outputs for an entire project.
New material and texture database for optimum renderings The new database has been completely revamped and offers you a comprehensive range of the latest textures and materials (for Vision). This saves time and guarantees optimum renderings. Start your selection in the Project Manager by selecting the Object tab and then Materials / Textures. You can now select the required textures for your project and move them by Drag & Drop onto the desired object in the 3D room.
Contours to facilitate work on the floor plan The new program also lets you view contours on the floor plan too. This helps you when luminaries additionally have to be positioned in imported 3D buildings or outdoor installations. It also, however, makes it easier to position individual luminaires in indoor rooms.
Undo/Redo actions Relux Professional 2007 shows you the most recent actions you have performed, which you can undo. If you wish to repeat an action that you have undone, you simply have to press on the Redo option in the toolbar.
Use of formulae for the X-Y-Z coordinates and angle specifications You can use formulae as positioning aids in the Coordinates dialog box as well as in the fields with this same name in other dialog boxes.
RELUX INTERFACE
18
RELUX INTERFACE
The Relux interface comprises four main areas: Main menu Toolbars Project manager Action window with the individual menu Toolbars
Project manager
Action window
You can adapt the appearance of the Relux interface to suit your requirements (you can move or switch off tool bars and hide part of the Project Manager, etc.). If you make changes that you subsequently dont like, then you can restore the original appearance of the Relux interface by selecting the main menu option Window Reset layout .
RELUX INTERFACE
19
You can use the main menu option Window big symbols to switch the big icons in the toolbars on and off. You can switch the status bar on and off with the main menu option Window Status Bar.
RELUX INTERFACE
20
2.1
Toolbars
There are eight different toolbars: Standard
Scenes
Edit
Settings
View
Insert
Calculate
Outputs
Not all the icons on the toolbars are active all the time. Whether an icon is active or not will depend on which object(s) have been selected (e.g. luminaire, furniture, measuring surface), the action window that is displayed or the calculations that have been performed. Non-activated icons are shown in grey. If no calculations have so far been performed, for example, the icons on the outputs toolbar will be grey Some icons have an arrow in the bottom right corner. This means that there are other icons hidden behind this icon. To display all the possible icons, you must click on the icon and keep the left mouse button pressed for somewhat longer. .
RELUX INTERFACE
21
If you click on this arrow with the right mouse button, a window will appear showing all the possible actions that can be undone or redone.
You can use the main menu option Window Toolbars to have either individual toolbars or all the toolbars shown or hidden. Depending on whether there is a tick in the box or not, the toolbar will either be shown or not.
RELUX INTERFACE
22
You can also move the toolbars and arrange them differently. You could place all the toolbars one under the other, for example. To move toolbars, you must place the cursor on the left-hand edge of the toolbar. The cursor will then change its appearance. Now select the toolbar with the left mouse button and, keeping this button pressed, drag the toolbar to the desired position.
RELUX INTERFACE
23
2.2
Project Manager
You can administer your project in the Project Manager. It has tabs for Objects, Projects and Outputs, plus the Coordinates window. The Objects tab can be used to select luminaires, sensors, 3D objects/furniture and material/textures from databases and incorporate them in the project through Drag & Drop into the Floor plan or the 3D view action window. It is also possible to select pre-defined room elements (doors, windows, skylights and pictures), basic objects (cubes, working surfaces, pillars and partition walls) and measuring elements (virtual measuring surface, reference plane for emergency lighting and escape route) and incorporate these through Drag&Drop into the Floor plan or 3D view. You will find more on these individual topics in Chapters 8 Luminaires, 9 Room elements, 10 Materials and 11 Measuring elements.
The Project Manager can be used to administer several rooms/installations in a project file. The different rooms/installations for a project are shown in the Scenes toolbar and can be selected there.
The Project tab allows you to display the objects used in the currently selected room/installation (e.g. windows, measuring elements, luminaires and the like). You can select the object types that are to be displayed. If you select All elements, all the objects will be displayed. If you select Luminaires, only
RELUX INTERFACE
24
individual luminaires will be displayed. If you have created luminaire groups in your project, you must select Groups to have these displayed.
Fig. 28 Project tab with the menu for the objects to be displayed
RELUX INTERFACE
25
The individual objects (e.g. windows, measuring elements, luminaires and the like) can be edited in different ways: The context menu for the object selected can be opened with a right click (see Fig. 29), or the Properties window can be opened with a double click (see Fig. 210).
Fig. 29 Project tab with the context menu for the reference plane
More detailed information on editing objects may be found in Chapters 8 Luminaires, 9 Room elements, 10 Materials and 11 Measuring elements.
RELUX INTERFACE
26
The Output tab shows which output windows are open in the action window. Directories can be marked with: a red tick a grey tick , i.e. all the sub-options for the directory are open , i.e. only individual sub-options for the directory are open
Sub-options can be marked with: a red tick , i.e. the sub-option is displayed as a window
a blue tick , i.e. this sub-option will only be displayed in the active window until a new sub-option is selected a red monitor calculation , i.e. the window will always be opened after the light
You will find more detailed information on screen outputs in Chapter 13 Outputs. The Coordinates window will display the position, rotation and size (where possible, i.e. for a luminaire group, but not for a cube). The objects selected can be moved, rotated and, to some extent, have their size changed through the input of numerical values.
RELUX INTERFACE
27
Note
The reference point of the object for the specification of the coordinates is shown in the form of crosshairs in the action window.
You can adapt the appearance and arrangement of all or part of the Project Manager to suit your requirements. All the Project Manager displays shown so far have been shown in Docking mode. Other display modes can be selected from the context menu for the Project Manager (the context menu is called up with a right click). Hide can be selected to hide the window from view. It can then be switched on again via the main menu option Window appropriate tab (Project, Object, Output or Coordinates).
By selecting the Floating mode, you can have the docking display converted into a window that can be placed anywhere on the Relux interface and can be varied in size.
RELUX INTERFACE
28
To change the size of the window, move the cursor to one of the edges of the window. The cursor will then take on a different appearance: Now click on the edge of the window and, keeping the mouse button pressed, drag the window to the desired size.
Fig. 215 shows an example of a different configuration for the Relux interface.
RELUX INTERFACE
29
2.3
Action window
The following can be displayed in the action window zone: Floor plan 3D view (different views are possible) Results output (result overview, table, isolinies representation, pseudo colours, 3D mountain plot) 3D luminance The project can be edited in the Floor plan and 3D view windows. The Results output and 3D luminance windows are only available after the light calculation has been completed; they show the lighting engineering results. The different action windows have their individual menus at the top edge (see Fig. 216). The different menu options can be used to edit objects and to modify displays and window properties.
In the case of the Floor plan, 3D view and 3D luminance windows, the context menu can be called up with a right click. There is no context menu for the results output. The context menu varies for the different windows. Depending on the object that has been selected, different menu options are either available for selection or are blocked (depicted in grey).
RELUX INTERFACE
30
You can change the width of the action window. To do this, move the cursor to the left edge of the window. The cursor will then take on a different appearance. Now click on the edge of the window and, keeping the mouse button pressed, drag the window to the desired size.
PROJECT EXAMPLES
31
3
3.1
PROJECT EXAMPLES
Relux Express
Once you have started Relux Professional, the start window containing a number of options will appear. First of all, by selecting Relux Express, you have the option of compiling a project for an interior room in a simple manner.
The Relux Express function guides you through all the inputs required for an indoor room project and thus provides you with support in compiling your project. This function is particularly suitable for beginners, since it will familiarise them with the program and allow them to compile an indoor room project rapidly.
3.1.1
Project data
After you have clicked on the icon, Relux Express prompts you to enter the project data. The input window is shown in Fig. 32.
PROJECT EXAMPLES
32
Chapter 4.1 Project data explains how project data is set out on the printout.
3.1.2
Room data
By clicking on the next button, you will be taken to the Interior window, where you can enter the necessary room parameters.
PROJECT EXAMPLES
33
In Relux Express, you can select either a Rectangle or the L-Room shape for the shape of your room. You select this by clicking on the list field. The schematic diagram of the room type shows you how the walls are arranged. In the left-hand section of the window, you can enter your own name for the room and also determine the room dimensions. This is also the point where you specify the height of the reference plane and the distance between the reference plane and the wall (offset). In the right-hand section of the window you can allocate a reflectance to each wall, the floor and the ceiling. Clicking on the Colour button (e.g. ) allows you to enter a reflectance directly. If, after clicking on a button, you click on the arrow, the Select material color window will open. (See Fig. 34)
You can select the colour of the wall directly from this window by pressing on the Color selection tab. In the right-hand section of the window, Relux shows you the colour selected and the composition of the colour in terms of the three primary colours (red, green, blue). Relux additionally calculates a proposal for the reflectance.
Note
Only diffuse reflections are used for the calculations. The supplementary Relux Vision module can also perform light calculations with other materials (see the Quick Guide to "Relux Vision") which have reflecting or only partially-scattering reflection characteristics. By clicking on the OK button, you can allocate the colour and the reflectance to the selected wall. In order to allocate a colour to the other surfaces too, it is first necessary to mark the area that has the desired colour with the mouse and then move the mouse and use it to mark the other surfaces. To do this, you should keep the left mouse button pressed and move the mouse cursor up or down.
PROJECT EXAMPLES
34
By clicking on the same material button, you can have the colour of the marked walls changed to the colour of the first wall you marked. Fig. 35 shows the procedure for adopting a colour on other walls.
PROJECT EXAMPLES
35
3.1.3
Luminaire selection
To be guided further through your project input in Relux Express, you must now click on the next button. This will take you to the Luminaire selection window, which you can see in Fig. 36.
You should then click on the Luminaire selection tab. As the next step, you can click on a luminaire company of your choice. The list under Item number will then show you all the luminaires from this company that are available in Relux. You can select one of the companys luminaires by pressing on the Add button. If you wish to position several different luminaire types in the room, you can add the additional luminaires by using the Add button again. If you click on the Luminaire type tab, you will see all the luminaire types that you have selected. You can confirm this selection by pressing on the OK button, and Relux Express will continue with the positioning of the luminaires. There are several different approaches that can be adopted to selecting a luminaire for your project. These are explained in detail in Chapter 8.1 Luminaire selection.
PROJECT EXAMPLES
36
3.1.4
Following this, in the Mounting type section, you should specify the mounting type for the luminaires from the list field. Once you have entered the illuminance required for your room, EasyLux will calculate the necessary number of luminaires and position these uniformly in the room. In the right-hand section of the window, you can change the positioning and the number of luminaires. After each change, EasyLux will re-calculate the illuminance again. This then ensures that you always have an overview of how your changes affect the illuminance. You can thus also use EasyLux to determine the illuminances for different numbers of luminaires and different luminaire arrangements. The Number of luminaires section specifies the overall number of luminaires in the room. The luminaires are always arranged symmetrically.
PROJECT EXAMPLES
37
If you specify five luminaires and the luminaires are arranged in two rows, EasyLux will use six luminaires (three luminaires in each of two rows). In the Luminaire arrangement section, you can specify that the luminaires must be arranged uniformly in the room. Alongside this, you also have three options for mounting strip lights (a 100%, 50% and 33% strip light configuration). The empty spaces will correspond precisely to the length of one or two strip lights. With Orientation of major axis, you have the option of positioning the lights longitudinally or transversally in the room. In the Number of luminaires section, you can enter two numbers to specify the number of luminaires in a row and the number of rows. By clicking on , you can switch between the floor plan and the 3D view. In the 3D view, you can rotate and move the room with the mouse so as to obtain an overview from different positions. In the 3D view, the mouse has the following functions: Left mouse button Middle mouse button Rotating the mouse wheel Right mouse button Rotates the room Moves the room Zooms into the room Context menu with the menu options Wire frame, filled, External surfaces and axis
By clicking on the next button, you can terminate the entry of the product data and proceed to the project output.
PROJECT EXAMPLES
38
3.1.5
You can start the printing by clicking on the Print button. You can now press on the Complete button to quit Relux Express. You are now in the Relux interface, which is explained in detail in Chapter 2 Relux Interface. Finally, you must save your project under the menu option File Save As. As you can see from Fig. 39, you have to select a folder and a project name and then save the project by clicking on the Save button.
PROJECT EXAMPLES
39
Fig. 39 Save As
If you try to close the project without saving it first, the prompt shown in Fig. 310 will appear by way of a safety measure. If you click on the Yes button, the window from Fig. 39 will appear, and you can enter a file name and save the project.
PROJECT EXAMPLES
40
3.2
Interior Project
Once you have started Relux Professional, the start window containing a number of options will appear. You can compile new projects (Relux Express button: Interior; Projects buttons: Interior, Exterior or Road project) or open existing projects (Buttons: Open project, Recently opened or Samples)
3.2.1
Project data
The Enter project data window will open.
PROJECT EXAMPLES
41
You can enter the required data and close the window by pressing the OK button. In Chapter 4.1 Project data you will find information on how the project data is presented on the printout.
3.2.2
Room data
The Interior window will open, allowing you to enter the required room parameters.
We will select the room name Office and the room type Polygon for our project (information on this may be found in Chapter 5.1 Room types. We enter 2.8 m for the height, and the defaults for the reference plane are adopted as they stand. We now enter the individual points of the room. For rooms with a complicated floor plan, the easiest approach is to read in the floor plan as a background image and then generate the corner points of the room. (Information on this may be found in Chapter 6.2 Importing background images). After this, the materials and colours for the floor, ceiling and walls can be specified. For the floor, for example, we press the Materials/Textures button and select the Carpet Blue texture from the Fabric directory in the Relux texture library. (Information on this may be found in Chapter 10.2 Textures). For selecting the colour, you can enter a reflectance directly by clicking on the Colour input field (e.g. ). If, after clicking on a input field, you click on the arrow, the Select material colour window will open. (Information on this may be found in Chapter 5.1 Room types). It is possible to use RAL colours here.
PROJECT EXAMPLES
42
Fig. 314 Select material color with the RAL Farbe/RAL color tab
After the above work steps have been completed, the data shown in Fig. 315 should be displayed in the Interior window.
Fig. 315 "Interior" window with the data for the sample room
You can specify the room orientation with the North angle button.
PROJECT EXAMPLES
43
After the above work steps have been completed, you can have the four overview displays presented by pressing the icon.
Fig. 317 Overview presentation of the sample room with a changed floor plan, wall colours and floor and ceiling textures
PROJECT EXAMPLES
44
3.2.3
Please note that, in the case of windows, it is the transmittance that has to be specified and not the reflectance (as is required for walls, for example)! After windows have been entered, it is now possible to perform daylight calculations (Information on this may be found in Chapter 14 Daylight calculations).
PROJECT EXAMPLES
45
The room element Picture has had a photo allocated to it via the Material/texture button. (Information on this may be found in Chapter 10.3 Special features in picture selection).
PROJECT EXAMPLES
46
Fig. 320 Overview presentation of the sample room with the door, windows and picture
PROJECT EXAMPLES
47
3.2.4
Luminaire selection
As the next step, the required luminaire types for the project can be selected. This is done, for example, by going to the Project Manager and selecting the Objects tab, the Luminaires directory and the Add menu option. The Luminaire selection window will then open, and you can select luminaires in the Luminaire selection tab, for example. (Information on this may be found in Chapter 8.1 Luminaire selection). The luminaire types selected for the project will be displayed in the Luminaire type tab.
Fig. 321 Luminaire selection window with the Luminaire type tab and the luminaire types selected
3.2.5
Designing a scene
Workplaces are frequently specified beforehand, so that the corresponding furniture and measuring elements can be put in position. You can select furniture from the Relux furniture library in the Project Manager by selecting the Objects tab, then the 3D objects/furniture directory and the Add menu option. After this, the furniture can be incorporated in the room and edited in the Properties window. (Information on this may be found in Chapter 7 Positioning objects and object groups).
PROJECT EXAMPLES
48
Fig. 323 Overview presentation of the sample room with the furniture in position
You can allocate measuring surfaces to the individual workplaces. To do this, you should select the desired table and open the context menu with a right click of the mouse. Select the menu option Define task area, and a measuring surface will be compiled. For non-rectangular 3D objects, the measuring surface will be aligned to the bounding box. You must then adapt it to the actual table surface afterwards. To do this, you can doubleclick the measuring surface. You will then be able to edit the measuring surface in the Properties window that opens.
PROJECT EXAMPLES
49
Fig. 324 "Properties" window with the measuring surface for workplace A1
Fig. 325 Overview presentation of the sample room with the measuring surfaces in position
For artificial calculations to be carried out, it is, of course, necessary for luminaires to be positioned in the room. You can drag the desired luminaire into the room from the Project Manager by going to the Objects tab and selecting the Luminaires directory. You should then double-click the luminaire, which will open the Properties window, allowing you to edit the luminaire. You can form luminaire groups in the Project Manager by selecting the Project tab, right-clicking on the luminaire to be included in the group and selecting the Group menu option from the context menu.
PROJECT EXAMPLES
50
(Information on this may be found in Chapter 7 Positioning objects and object groups and 8 Luminaires).
Fig. 327 Overview presentation of the sample room with the luminaires in position
PROJECT EXAMPLES
51
3.2.6
Calculations
When you have placed all the necessary objects in the room, you can start the light calculations via the main menu option Calculation - Calculation manager (Information on this may be found in Chapter 12 Calculations and 14 Daylight calculations).
3.2.7
Project output
After the calculation, you can output the project via the main menu option Output Print (Information on this may be found in Chapter 13 Outputs). You can have the results output directly into a pdf file, for instance.
PROJECT EXAMPLES
52
Fig. 330 Results output for workplace A1 in the form of pseudo colours, isolinies and a table
PROJECT EXAMPLES
53
Fig. 331 3D Luminance with Relux Professional and with Relux Vision artificial light
Fig. 332 3D Luminance with Relux Professional and with Relux Vision daylight and artificial light
PROJECT EXAMPLES
54
Relux Professional performs calculations with completely diffusely-reflecting surfaces. This will not produce natural pictures for reflecting materials (e.g. mirrors) or transparent materials (e.g. windows). To achieve natural pictures, you can use Relux Vision, which makes allowance for the reflection and transmission behaviour of the materials.
PROJECT EXAMPLES
55
3.2.8
Saving a project
You can save the project via the menu option File Save As As is clear from Fig. 333, you must first select a directory and a project name and then save the project by clicking on the Save button.
If you try to close the project without saving it beforehand, the prompt shown in Fig. 334 will appear by way of a safety measure. Once you have clicked on the Yes button, the window shown in Fig. 11 will appear, and you can enter a file name and save the project.
56
4
4.1
Project data
The project data settings are entered via main menu option Project Project data. You can enter the general data for the project here: the project number, object, installation, customer, processed by and the date.
The data on the object, installation, project number and date appear as a header on the project printouts.
57
Comprehensive information on the project can be entered via the Project description window. The project description will only appear on the first page/cover sheet .
4.2
Enter location
The data for the project location is entered via main menu option Project Location. This data is of relevance for daylight calculations. For the location, it is possible either to select a location from the location list or to enter a new location. If a new location is to be created, the geographical longitude and latitude must be entered, together with the time zone (difference compared with UTC Universal Time Coordinated). It is also possible to make allowance for daylight saving time (summer time) and the start and end of daylight saving time.
58
4.3
Select language
The language settings are made via main menu option Extras Language. User interface: Language for dialogs and input masks Output: Language in which printouts are to be compiled Database: Language for dialogs for selecting luminaries
Note
Changes to the language settings for the user interface will only take effect after the program has been restarted.
59
4.4
Page setup
Under Extras Header and footer you can position the company logo in the top right-hand corner and specify two footer lines for company data, or compile a general notice to be included on the cover sheet, all of which will appear on printouts.
When selecting your company logo (bmp, dib or jpg file) you must ensure that it is not too wide and does not cover up the header lines. If you wish to change the size of your logo, you can retain its original aspect ratio by specifying a size and selecting Maintain proportions.
Note
The paper size, margins and portrait/landscape mode can be set by selecting main menu option File Active window or main menu option Output Print and then pressing the Page setup button. Further information on this may be found in Chapter 13 Outputs.
60
4.5
You can use US units. You can label luminaires with the luminaire type in the Control Centre and the Project Manager
Fig. 48 Left: default setting: no luminaire type shown; Right: luminaire type shown
As the default, you can move the entire room with the cursor keys in the 3D view action window. By selecting the Selected objects option, you can shift the selected object using the cursor keys. You can employ different 3D drivers depending on the PC that you are using.
61
The maximum number specified for Undo Redo determines how many steps can be undone again. Default values:
Here you can specify the values that are to be used as defaults when compiling new projects. Reflectances and colours for the floor, ceiling and walls etc. Planning, reduction or maintenance factors Height of reference plane Distance between reference plane and wall Maintenance factor, individually for each luminaire type
62
Exterior area:
Here you can specify values for the wall and ceiling thickness, the reflectance of the outer walls and the q0values for the road surfaces, which are to be used as defaults when compiling a new project.
63
4.6
Fig. 411 Properties window for the coordinates origin, placing grid and drawing grid
The placing and drawing grids can be set on different values and can also be switched on and off. Frequently-used settings for the coordinates origin and the placing and drawing grids can be saved as variants and thus rapidly called up again. A new variant can be created with the save this variant as the default. icon. The icon can be used to icon.
All the different variants but one can be deleted with the
The coordinates origin and the placing and drawing grids can similarly be set via the menu for the Floor plan action window, by selecting menu option Edit Properties or menu option Display - Origin, raster width.
64
Fig. 412 Floor plan action window: EditProperties and DisplayOrigin, raster width
65
5
5.1
You can give the room a name in the Room name field. This is important if you are going to enter more than one room in a project something which is explained in Chapter 5.2 Multi-room capability. In the preview window, you will see the selected room type of Rectangle and the distribution of the walls. In the Dimensions field, you should enter the lengths of Walls 1 and 2 and also their height. This room type is then clearly described. The room type Rectangle thus always produces a cube-shaped room.
66
For the height of the reference plane and its distance from the wall (offset), Relux Professional will always propose the default values from the Extras Options Default values menu. You can adapt these values for your project. In the right-hand section of the window you can allocate a reflectance to each of the walls, the floor and the ceiling. You can enter a reflectance directly by clicking on a Colour input field (e.g. ). If, after clicking on an input field such as arrow, the ,, you then click on the Select material color window will open.
In this window, you can select the colour of the wall directly, via the Colour selection tab. Relux shows you the colour selected in the righthand section of the window, together with composition of the colour in terms of the three preliminary colours (red, green, blue), and it also calculates a proposal for the reflectance.
Note
Only diffuse reflections are taken into account for the calculation. The additional "Relux Vision" module also offers a light calculation with other materials (see the Concise User Manual for "Relux Vision" on this), as well as for mirror reflecting characteristics and for reflection characteristics with only partial scatter. You can assign the colour and the reflectance to the selected wall by clicking on the OK button. To assign a colour to the other surfaces too, you must first mark the area in the required colour with the mouse and then move the mouse and mark the other areas with it too. In doing this, you should keep the left mouse button pressed and move up and down with the mouse cursor. By clicking on the same material button, the colour of the marked walls will change to the colour of the wall you marked first.
67
You can import and edit additional textures via the Materials/textures button. You can then allocate a texture to a wall, the floor or the ceiling in the manner shown in Assigning a colour to other walls. The precise approach is set out in more detail in Chapter 10 Materials. You can use the North angle button to specify the orientation of the room vis--vis North on the compass. The alignment of the room is relevant for daylight calculations. The North angle that is entered is also shown on the floor plan.
68
Fig. 55 The "North angle" window and its depiction on the floor plan
69
Semi-circle The sole difference compared with the room type of Rectangle is Wall 2, which is semi-circular. The size of Wall 4 determines the radius of Wall 2.
70
L-shaped room (L-room shape) To ensure that the L-shaped room can be precisely specified, you must enter the size of two walls (Wall 1 and Wall 6) and the lengths for Ax and Ay. Ax corresponds to Wall 5 and Ay to Wall 2.
71
Polygon
In the dimensions section, you simply have to enter the height here. A polygon can contain as many points as desired, and you must enter these in the Geometry section. You thus have to measure out the coordinates from the project plans. Wall 1 is to the right alongside Point 1. This is the next wall that follows on from Point 1 in the anticlockwise direction. The other walls are similarly next to their Points in the anticlockwise direction. There will always be the same number of walls as points. It is important for you to enter the points in an anticlockwise direction and for there to be no overlaps between the walls. You can delete marked points via the Delete button and insert a new point with the same coordinates before a marked point by pressing the Insert button.
72
A polygon can be created more simply via a background image. The precise approach is explained in detail in Chapter 6.2 Importing background images. Gable roof Wall 1 is always aligned longitudinally to the gable roof and Wall 2 transverse to it. Height h determines the height up to the point where the gable roof starts, and height Az the overall height of the building. It is possible to specify different colours or textures for the two sides. This is why you will find two ceilings listed in the Geometry section.
73
Trapezoid
The Trapezoid room type requires three wall lengths to be entered (Walls 1, 3 and 4). Wall 4 is at right angles to Wall 1. Walls 1 and 3 will be linked by Relux Professional, thus forming Wall 2.
74
Exterior installation
In the Exterior installation window, you should enter a polygon area without a height. Neither walls nor a ceiling are available. When it comes to entering the points, what has already been said under 4. Polygon applies here once again.
75
5.2
Multi-room capability
Relux Professional makes it possible for you to process several rooms or exterior installations in a single project. Individual rooms or exterior installations are referred to as scenes. This option is particularly attractive in conjunction with a background image, as is presented in Chapter 6.2 Importing background images. You can add a new scene to your project via the Project Add menu or via the context menu option Add in the Project tab inside the Project Manager.
The window in which you can edit the room type will open. It is recommended that you enter a room name here. You can then rapidly distinguish between the different scenes in the project manager. You can assign a different North angle to each scene something which is important for daylight calculations.
76
You can switch between scenes either by using the toolbar or by going via the Project Select scene menu.
To open the window in which you can edit the room data, you should double click on the inner room perimeter and select the Project Edit scene menu options or press on the icon.
77
If you have to plan the lighting for several similar rooms, you can duplicate a room by selecting the Project Duplicate scene menu option, or by selecting the Project tab in the Project Manager and then the Duplicate scene option in the context menu, or you can press the icon. In the next picture you can see that the Office scene has been duplicated. There is now a Copy Office scene in the Project Manager that you can edit.
78
You can delete the active scene via the menu option Project Delete scene, or by selecting the Project tab in the Project Manager and then the Delete scene option in the context menu, or you can press the icon. You will see the currently active scene in the toolbar.
Relux Professional will issue a safety prompt asking if you really want to delete the room. There must always be at least one scene in a project. In other words, you cannot delete the last scene.
79
6
6.1
80
Fig. 62 shows an import with a scale of 1 (above) and a scale of 0.5 below.
When the room is imported with a scale of 0.5, it is twice the size in the project. If you do not know the precise scale, you should start by importing the room with a scale of 1. You can now compare the length of a wall in the Relux project with the actual length and calculate the scale from this. For the second import, you should use the scale you have calculated, and the room will have the correct size in the Relux project. To give a clear example: If the bottom left wall in our project is really only 1.5m long and not 2m, it is necessary to enter a scale of 1.3333 (2 / 1.5 = 1.3333). If you use AutoCAD, Relux Informatik AG can provide you with the ReluxCAD PlugIn. The luminaires can be selected from the manufacturers databases in an easy and user-friendly manner and are displayed true-to-scale in all individual CAD plans. Administering the luminaires used is very simple: once all the luminaires have been put in position, ReluxCAD automatically generates a precise parts list with information on all the products used in the project. The contents can displayed can be selected individually.
81
A plan compiled in AutoCAD can be directly transferred to the Relux Professional, Offert or Vision light calculation program at any time via a bidirectional interface. The actual light calculation, light visualisation and cost determination is then performed in Relux. The results obtained can then be sent back to the AutoCAD planning. Optimisations and changes made in Relux Professional will be taken over automatically in the CAD planning if required. Depending on the planners individual requirements, the calculation results can also be displayed as tables, isolines or, quite simply, as average values for the room. Fig. 63 shows an example of isolux lines for the illuminance being transferred into the CAD plan. Three-dimensional buildings, faades or room geometries can also be transferred from AutoCAD to Relux Professional, or Relux Vision, and calculated there. Conversely, it is also possible to take 3D data from the light calculation program (and hence 3D luminaires too) and use this data in AutoCAD. You will find further information and a test version in the Internet under www.relux.biz.
82
6.2
Relux Professional incorporates the background image in the floor plan. As the next step, you must specify the scale and the origin.
You specify the scale by zooming into the background image and looking for a known length. You should select the menu option Display Background image Set scale in the action window. In Fig. 64, for example, we know that the meeting room is 7.5m long. Click on the left-
83
hand corner and, keeping the mouse button pressed, drag the line to the right-hand corner and then let go of the mouse button again. The Scale background image window will open, in which you can enter the length of the line that you have traced. As the third step, select menu option Display Background image Set origin in the action window. The cursor will change into a cross. Click with this cross on the point where the room coordinates 0m; 0m are to be positioned.
You can now use the background image as a template for positioning objects or measuring areas. Another possible approach involves changing the room to the size of the meeting room. You change the room by using the background image as a template again. Click on the room and you will see the corner points. Click on a point, keep the mouse button pressed, and drag it onto one of the corners of the meeting room. If necessary, you can convert a rectangular room into a polygonal room via the Convert into polygonal room context menu in the action window. After clicking on the floor plan you can add points to the polygon or remove points from it via the background image. icons, and drag these onto the points in the
From inside the Floor plan action window, you should select the menu option Edit Properties and then switch on the Show background image only in the room switch. The background image display will then be confined to the room.
84
Fig. 66 Entire background image and background image restricted to the room
You can use this option and the option described in Chapter 6 to process several different scenes in a single file and thus plan the entire office storey. If you duplicate the scene, you must insert the same background image again. The scale and origin will be adopted and do not have to be aligned once more. Adapt the room to a different office in the background image and repeat the process until all the rooms have been entered. You can remove the background image from the floor plan via menu option Display Background image Remove in the action window.
6.3
Exporting rooms
You can use the File Export menu option to export the room in ASCII format (ReCAD) or DXF format. The room shape and room size will then be exported.
85
7
7.1
1.
2. Rotating the body around the axes of the body. This means that a rotation always involves a change in the position (direction) of the other axes of rotation (i.e. axes of the body). The order in which the rotations are performed is thus particularly important: 1st rotation: 2
nd
rotation:
In the standard case, without rotation around the Z axis, this will be parallel to the X axis 3rd rotation: Luminaire Room elements C90 axis Transverse axis
In the standard case, without prior rotation, this will be parallel to the Y axis
2.
Collisions between individual luminaires and/or individual room elements or with the areas delimiting the room (floor, walls and ceiling) should be avoided. A test to check for this can be performed with the icon.
When performing rotations, the direction of rotation (positive or negative leading sign) is important. A positive leading sign means that the rotation is performed in the mathematically positive direction, i.e. anti-clockwise. The procedure to be adopted is also known as the right-hand rule the thumb of the right hand points in the direction of the axis of rotation (positive counting direction), and the bent fingers show the positive direction of rotation.
86
1st rotation
2nd rotation
3rd rotation
The second and third rotations are based on the body axis as it results from the preceding rotations. There are two different versions of the Standard tab in the Control Centre and the Properties window of the individual object involved: one for rectangular elements and one for polygonal elements. We will take a virtual measuring surface as an example of a rectangular element here. The position in the room, the rotation around the body axes (see righthand rule) and the dimensions are entered via the dialog.
A cube element will be used as an example of a polygonal element. The position is generally specified by the geometric centre point of the object; this can be aligned to the particular requirements in the Extended section.
87
The element shapes available are rectangular round polygonal These can be changed at any time with the pull-down menu. The Extended section fulfils two requirements: on the one hand, the corner points are specified in relative coordinates vis--vis the origin (insertion point of the object) and, on the other hand, the material and reflectance data for the individual surfaces are specified.
88
Note 1
The material allocation can be performed for all the surfaces of an object under the "Standard" tab or for other surfaces in the "Extended" section.
Note 2
It is also possible to have the horizontal illuminances output for all the room elements. To do this, please mark the checkbox on the far right in the "Output" column. The insertion point of an object is generally located in the geometric centre of the rectangle enclosing the object (bounding box). For special configurations (including the users own elements for the furniture library), it is very helpful to redefine the insertion point. To change the insertion point, it is recommended that the object first be brought back into its starting position (e.g. positions X, Y and Z and rotations AZ, AX and AY are set on 0); the insertion point should then be reset and a check conducted in the 3D view.
Fig. 74 Properties window for the cube type - "Insertion point" tab
89
Specific points on the cube can be readily selected from the list:
Fig. 75 "Properties" window for the cube type - "Insertion point" tab - defaults
7.1.1
90
Fig. 76 The Project Manager with luminaires and the Coordinates window
Click on the desired luminaire and move it by means of Drag&Drop into the floor plan or a 3D view. You can also call up the context menu with a right click on the luminaire and insert a luminaire at coordinates 0 m / 0 m via the Insert into room menu option. Relux Professional selects the height of the luminaire from the luminaire data. A ceiling luminaire is thus mounted on the ceiling and a suspended luminaire is suspended. If you click on the luminaire, you will see the precise position and orientation of the luminaire in the Coordinates window. New values can be entered and then adopted by pressing the Apply button. You can move the luminaire around the floor plan and a 3D view by means of Drag & Drop. The Coordinates window will show you precisely how the position of the luminaire is changing. In a 3D view you also have the option of changing the height and rotation of the luminaire by means of Drag & Drop. To do this, you must move the cursor over a coordinate axis in such a way that it becomes yellow. You can now move the luminaire in the required direction by clicking on the mouse button and keeping it pressed. Once you let go of the mouse button, the new coordinate will be shown in the Coordinates window.
Fig. 77 shows a luminaire being moved along the x axis. The designation x 0.500 shows you that you have moved the luminaire 0.5 m along the x axis. While the luminaire is being moved, it will be set on the placing grid if
91
this is switched on. By pressing on the Shift key, you can switch off the placing grid for a time and move the luminaire around to the nearest millimetre.
Note
The position of the cursor is shown in the status bar on the bottom right.
When you select an object and move it, the coordinates for the moved object will be shown in the status bar.
If you call up the context menu from within the action window of a 3D view by means of a right click, you can then click on the Rotate menu option.
When you click on a luminaire, the area around the luminaire takes on a different appearance, as is shown in Fig. 78. To rotate the luminaire, you should follow the same procedure as for moving a luminaire. 2. Positioning a luminaire via the Insert - Luminaires menu option: This menu shows all the luminaires that you have added to your project. By clicking on a luminaire, you can have this inserted in the room at coordinates 0 m / 0 m.
92
3. Positioning a luminaire via the control centre: You can start the control centre by pressing the icon. Then, by pressing on the New button, the Insert new object window will open. You should select the Single luminaire menu option and quit the window. You are now in the Control centre window again and you can select the luminaire via Type and allocate it a name under Designation.
Aiming point
You can specify the position, rotation or aiming point for this individual luminaire.
93
7.2
The following options are available in the dialog all the configurations apart from the circular and mirror arrangement are based on the standard field, and only a number of parameter prompts are different: The different group arrangements will be explained here, together with the key parameters, in order to provide an overview:
94
Group Field
Brief description
Group definition
Arrangement in rows and Specification of number and columns spacing of the objects in two directions (rows and columns); the direction of the two axes in relation to each other can be defined. Arrangement in a line Arrangement of objects in a row (line), specification of the spacing between two elements or placing between two points. The objects are arranged in the direction of one of the walls in the room, at a specified distance from the wall. All the objects are arranged around the specified central point along a circle or an ellipse. Circle or ellipse segments are similarly possible. Uniform alignment of objects, generally luminaires, within a room; the room is taken to be a rectangle with the maximum dimensions in the X and Y direction. Objects or object combinations are mirrored at a definable X and/or Y axis; this is the standard practice for stadium lighting.
Row
Outline
Circle
Uniformly
Objects are arranged uniformly in rows and columns within the room. An object or body is mirrored at the two orthogonal mirror axes (room axes)
Mirroring
For the Field arrangement, a specific explanation is given of the functions in the different tabs. Please note that for the field, row, outline and uniformly options, the first tab is always marked Field and the page only differs in the pre-selection of the pull-down menus for the three input sections:
95
Fig. 711 Control centre" window with the properties for Field
The left-hand section contains the information on the starting point for the group, the central section the number of columns in the group (number of elements in the X direction of the coordinate system) and the right-hand section the number of lines (number of elements in the Y direction of the coordinate system). The second tab "Position/Rotation" similarly contains the starting point of a configuration and, in addition to this, the specification of three angles of rotation which can be used to rotate the entire group around its axes (see "right-hand rule" at the start of this chapter). The third tab "Object arrangement" contains the angle of rotation of the individual object within the group. Details on the Field grouping type: After you have inserted an individual luminaire in the room, you should open the Control Centre with the Project Control centre menu option or the icon. After clicking on the New button, the Insert new object window will open. You will find the group types that are possible under the Luminaire groups menu item.
96
After selecting the desired group type and clicking on the OK button, the Insert new object window will be closed in the Control Centre and the Properties window for a luminaire group in a field arrangement will be displayed.
Preview window with icons for rotating, zooming and moving the object
Fig. 713 Control centre with Properties window for a luminaire group in a field arrangement
What Relux proposes is a field with three luminaires in the x direction (columns) and two luminaires in the y direction (rows). You can see the
97
configuration in the preview window and change the preview to suit your requirements with the three , and icons. In the left-hand section of the window, the coordinates for starting point A of the group (x=1 m / y=1 m) are given under Position. In the central section of the window, the number of luminaires in the x direction (3) and the luminaire spacing (2 m centre point of luminaire to centre point of luminaire) is given under Distance. In the right-hand section of the window, under Distance, you can see the number of luminaires in the y direction (2) and the luminaire spacing (1.5 m centre point of luminaire to centre point of luminaire). Fig. 714 shows the luminaire arrangement that would result after clicking on the OK button.
If you wish to move the luminaire field you can do this by means of the offset, for example. In the example shown, the offset for the x and y direction is 2 m.
98
The switches for Create chessboard pattern (black/white) switch off individual luminaires.
Note
By pressing the icon you can have the action window re-drawn, and the new luminaire arrangement will be visible.
99
In the right-hand section of the window, you can determine the angle between the individual rows. The default is 90, which makes sense for most applications. In the example, the angle vis--vis the main axis is 45.
With Distance between objects you can position strips of luminaires in a simple manner (distance = 0 m).
Note
The luminaire then starts at position (x=1 m / y=1 m). This is where the centre point of the luminaire was before.
In the left-hand section of the window, you can select the Start/End point option instead of the Position option. The starting point (A) and end point (B) of the group will then be specified (A: x=1 m / y=1 m; B: x=9 m / y=1 m). The Distance or Distance between objects is then no longer relevant, only Uniformly or Centred.
With Uniformly, the luminaires are placed in a uniform arrangement and the centre points of the luminaires are at the starting and end point.
With Centred, the luminaires are arranged in such a way that the distance between the starting point and the centre point of the first luminaire and the distance between the centre point of the last luminaire and the end point is equal to half the luminaire spacing (from luminaire centre point to luminaire centre point) in each case. In the example: 9 m distance between the starting and end point, i.e. the luminaire spacing = 3 m (from luminaire centre point to luminaire centre point) and 1.5 m between the starting point and luminaire centre point of the first luminaire, plus 1.5 m between the luminaire centre point of the last luminaire and the end point.
In the left-hand window section you can also specify a Wall. Its starting and end points are then starting point (A) and end point (B). An arrangement based on Uniformly no longer makes sense, because the luminaires are outside the room. It is also necessary to specify an offset so that the first row of luminaires is not up against the wall.
The wall is always the main axis (A-B), which means that offset y is always the distance between the first row of luminaires and the wall.
A number of examples for the grouping type Field: You want to place a group of luminaires uniformly (5x3) in the room.
You want to place three luminaire rows, each with six luminaires, in the room in a uniform arrangement.
You want to position one row of luminaires with three luminaires along Wall W3 at a distance of 1 m, but only over half the length of the room.
Fig. 79 1 Luminaire row along Wall 3 over half the width of the room
Grouping with the Row function: This works in the same way as grouping with the Field function. You cannot, however, enter a number for the number of rows in the right-hand side section, because there is only one row. Creating an object group via the context menu in the Floor plan action window and the Place objects in row menu option: Once you have selected an object with a click, you should open the context menu with a right click and select the Place objects in row menu option. The cursor will change into crosshairs. You can use the crosshairs to draw a line that determines the end point and the direction of the luminaire group. To do this, click on the point where the luminaire group is to end. The Properties window will open, and you can make further changes here (see Fig. 710).
Fig. 711 "Control centre" window with the properties for a circle of luminaires 1
In many cases, a circle/ellipse arrangement is not required in the form of a complete circle or ellipse. Relux offers the full range of possibilities here: by selecting "Ellipse b = small semi axis", it is possible to specify the side ratios of the ellipse. The input of a starting and ending angle means that any type of circle and ellipse segment can be obtained.
Note 1
a = big semi-axis points in the X direction b = small semi-axis points in the Y direction
Note 2
Under the "Position/Rotation" tab, the angle of rotation "AZ/Z[]" for ellipses can be used to set the position of the ellipse segment in relation to the coordinate axes.
Fig. 712 Control centre window with the properties for mirrored luminaires
This configuration makes it possible to adopt individual luminaires or already-grouped luminaires for illuminating an area (e.g. a sports ground) in the bottom left-hand quarter and then use these for the other three quarters of the sports ground. The specific feature of this configuration is the retention of the light distribution. If the illumination for the bottom lefthand quarter has been optimised, it is no longer necessary to perform an alignment of the individual luminaires for the other poles.
Example for the Mirroring grouping type: An installation with two tennis courts is to be illuminated with eight floodlights (4 poles with 2 floodlights each).The installation is symmetric around the x and y axes. The coordinate origin is in the centre of the installation. As the first step, you should position the individual luminaires. There are two luminaires in our example.
You can now mirror the individual luminaires separately. Start the Control Centre via the Project Control centre menu option or the icon. After that, you should select the luminaire that is to be mirrored. Then click
on the Group button. The Insert new object window will appear. You should now select the Mirroring option here, confirm your selection with the OK button and return to the properties window in the Control centre.
You have to enter the mirror axes as x = 0 m and y = 0 m, because the coordinate origin is located in the centre of the tennis-court installation. You can mirror at the x, y and x/y axis. The following pictures show the resulting arrangements.
The second floodlight also has to be mirrored in order to complete the installation.
Fig. 721 Mirroring the second luminaire at the x, y' and x'/y' axis
7.3
Breaking up groups
Fig. 723 Prompt for breaking up a group; right: depiction of a free group
Mark the corresponding group with the mouse and press the Break button. A window will now open in which you can break up the group entirely, into a free group, or terminate the process. If you break up the group completely, you can edit the objects individually again. If you convert the group into a free group, you can similarly edit the objects individually. The groups are still linked together as a group, however, and can thus be selected as a group in the Floor plan action window, for example, and moved around together.
In the Project Manager, under the Project tab: Open the context menu by right-clicking the desired group and then select the Break menu option. You should then continue in the same way as in the Control centre. In the Floor plan action window: Mark the corresponding group with the mouse. You can then either press the icon or right-click to call up the context menu and select the Break group menu option. There is no safety prompt. The group will be broken up completely straightaway, and you can edit the objects individually again.
LUMINAIRES 123
LUMINAIRES
This chapter gives detailed information on searching for, selecting and positioning luminaires. You will be shown how you can equip the luminaire with a specific lamp type or specify a louvre from a given selection.
8.1
Luminaire selection
You can select the luminaires that you wish to use in your project via the menu option Luminaires Selection or, from within the Project Manager, by selecting Objects Luminaires Add. The Luminaire selection window will open, and the options it contains are described in detail in this Chapter.
LUMINAIRES 124
8.1.1
LUMINAIRES 125
Relux Professional offers you further options for the user-friendly selection of luminaires: 1. Once you have clicked on an article number, this section of the screen will be activated. You can now start entering the desired article number via the keyboard without pausing. The blue bar will come closer to your desired article number with each number or letter that you enter. No distinction is made between upper-case and lower-case letters here. 2. After clicking on the Extended search button, the Extended search window will open. Employing the following search criteria, you can now find one or more luminaires that fit your search criteria: a) search in text: searches the ordering texts b) Search in Catalog number: searches the article numbers (including parts of them) c) Lamp search: searches for luminaires on the basis of the lamp type used, the number of lamps and the lamp wattage d) Ballast search: searches for luminaires according to the ballast employed. You can also combine the search characteristics and thus delimit the search still further. If you know, for example, that the luminaire you are looking for has a BAP high-gloss louvre, is fitted with a 35W bulb and the article number contains a 91, you should fill out the window in the manner shown in Fig. 83.
LUMINAIRES 126
Relux Professional will then find two luminaires that fit your criteria. Since you are looking for a ceiling luminaire, only luminaire 91W04.135.7 will be appropriate. You should select this with a click and add it. The Extended search (active) button shows you that only luminaires that fit the criteria you have entered are being shown. If you want all of a manufacturers luminaires to be shown again, you must open the Extended search window once again and click on the reset button. All the entries in this window will then be deleted. After you have clicked on the reset button, all the article numbers will be shown again. 3. You can also select luminaires by entering the luminaire name and the product group. You can select the luminaire name and the product group by clicking on the appropriate list field. You select the luminaire by clicking on the article number. You must then press the Add button to have the luminaire included in your project. The Luminaire name and Product group buttons with a grey background show that you have restricted the article numbers to this luminaire name or product group. If you click on the two buttons, all the article numbers will appear again.
Fig. 84 Selecting a luminaire via the luminaire name and product group
After selecting a luminaire, you can then select any combinations or lamp types that may be available, after clicking on the appropriate list field. You should pay particular attention to the different lamp types with different light colours and hence different luminous fluxes. For luminaire 91W04.135.7, for example, you can change the default light colour of
LUMINAIRES 127
4000 K (neutral white) to a lamp with 6500 K (daylight white). The luminous flux employed for the calculation will then be automatically changed from 3300 lumen to 3050 lumen. The Luminaire selection tab also gives you a brief description of the luminaire, the light distribution curve and a picture of the light.
LUMINAIRES 128
8.1.2
8.1.3
You can select a luminaire on the basis of the luminaire name, the luminaire number and the file name of the LDC file. If you wish to add a luminaire to your project, you must click on the Add button.
LUMINAIRES 129
8.1.4
LUMINAIRES 130
8.1.5
The search, selection and insertion procedure for a sensor is the same as that set out in Chapter 8.1.1 The Luminaire selection tab .
LUMINAIRES 131
8.1.6
You can, however, save your light distribution curves for non-Reluxmember companies in any desired directory and switch to there. Here, you can select the required luminaire on the basis of the file name and click on the Open button to place the luminaire in the Individual luminaire tab. Here again, you must press on the Add button once more so as to be able to use the luminaire in your project. You can also follow this approach to incorporate more than one luminaire in your project. In this case, you must work through the different steps several times over.
LUMINAIRES 132
8.1.7
Once you have selected a luminaire by clicking on it, you can call up certain items of information on this luminaire and edit the luminaire data. The amount of information available will depend on the data supplied by the luminaire manufacturer in question.
LUMINAIRES 133
The different information options are listed below: Polar diagram button Cone diagram button The light distribution curve is shown as a polar diagram. The cone diagram is displayed. You can increase or reduce the distance from the reference plane via the and icons. You can then see how high the average illuminance is on an ellipse with a semi-axis that is also indicated. CAD button Data sheet button Photo button Soellner button UGR button TM10 button Luminance button Manufacturer button Emergency lighting button A CAD drawing of the luminaire is shown. A detailed output. luminaire description is
A picture of the luminaire is shown. The Sllner curves for a luminaire glare rating are output. The UGR values for a luminaire glare rating are output. The TM10 values for a luminaire glare rating are output. The luminance of the luminaire is output for certain angles. The precise address of the luminaire manufacturer is output. You can configure the selected luminaire for emergency lighting mode under the Luminaire type tab. To do this, click on the emergency lighting button and the Configure luminaire for emergency lighting window will open.
Here you can specify how the luminaire is to be used in the case of emergency lighting or in combination with the normal artificial lighting. You also determine the luminous flux that the light is to emit for emergency lighting mode.
LUMINAIRES 134
In the section entitled Calculate luminous flux for artificial lighting, you can specify how the luminaire is to be switched in normal operation.
Note
It is absolutely essential to observe the manufacturers data concerning emergency luminaires. It might be that emergency luminaires have already been measured in emergency lighting mode. After clicking on the Planning aid button, you can click on the Determine button to obtain an estimate of the maximum possible luminaire spacing for a given luminaire height and a minimum illuminance.
LUMINAIRES 135
Options button
If you click the Options button, the window shown in Fig. 811 "Options" windowwill open. You can now change the lamp designation to your preferred lamp designation system or specify the default height for the cone diagram.
Deletes the luminaire highlighted in blue. By clicking on the Modify type button, you can open the Modify luminaire window for the luminaire highlighted in blue.
LUMINAIRES 136
Note
If you make changes to a luminaire, the luminaire number will be marked with a leading !. In this window, you can adapt the luminaire and the lamp to suit your requirements. The correct luminous flux for a lamp is particularly important. The luminous flux forms the basis for calculations and has a decisive impact on the results. Please note that you should enter the luminous flux for just one lamp. Relux Professional will determine the overall luminous flux from the luminous flux of an individual lamp and the total number of lamps. It is conceivable for the luminous flux to be reduced manually, such as if the luminaire is to be used under extreme environmental conditions. The lamp manufacturers provide you with diagrams for this, showing you how the luminous flux changes at certain temperatures. You can also assign a colour to the lamp if you activate the Lamp colour on/off switch and press the icon. Relux Professional then takes this spectral distribution into account for the calculations. You can see from the 3D luminance view how the different lamp colours affect the result.
Fig. 713 shows the same room twice over. The picture on the left has the Lamp colour option switched off. For the picture on the right, an orange bulb colour was selected. This option is particularly useful for coloured spot beams or RGB applications, because it gives you an estimate of the effect that the light will have.
LUMINAIRES 137
In Fig. 714 you can see how the colour temperatures of light sources and colour filters or RGB values have been actively included in the processing and how their colour impact is visualised. If you activate the Lamp colour on/off switch without changing the colour via the icon, the light colour saved in the luminaire data will be used for the calculations.
These two screen shots show a light colour of 3000 K on the left and 4000 K on the right, depending on the lamp type that you selected during the luminaire selection.
LUMINAIRES 138
8.2
Arranging luminaires
Since the positioning of luminaires, 3D objects, measuring area, room elements and basic objects is performed in a similar manner, the information on this has been summarised in Chapter 7 Positioning objects and object groups. Only the special features concerning luminaires will be explained here.
8.2.1
Aligning luminaires
After you have selected luminaires, the Coordinates window in the Project Manager also shows the button. If you click on this button, an Options window will open and you can specify whether the aiming point of the luminaire is to be moved when the luminaire is moved or whether the previous aiming point is to be retained. In this way, the luminaire can be moved without changing the area that the luminaire lights up. This can be useful for a luminaire aimed a picture, for example, when the luminaire has to be moved but the picture still has to be lit up. If the option Fix aiming points of luminaires when changing their position is not switched on, Relux Professional will not change the rotation of the luminaire when it is moved. The alignment arrow will thus move with the light. If you want to light up a picture with a spot, it would be useful if the spot could be aligned to the middle of the picture without having to know the precise angle of rotation. This will save you the time required to establish the optimum angle of rotation by trial and error. Relux Professional offers you this possibility with the Aim luminaires menu option that can be found in the context menu for the Floor plan or 3D view action window or by pressing on the icon. After clicking on the menu option or the
LUMINAIRES 139
You can now click on any point on a wall, the floor or the ceiling. The alignment arrow will move on to this bulls eye and rotate the luminaire in this direction.
LUMINAIRES 140
In Fig. 817 you can see that the alignment arrow is now aimed at the picture. Once you have aimed all the luminaires, you should click on the icon again, or on the Aim luminaires menu option in the context menu for this action window, so as to deactivate the aim luminaire mode.
9
9.1
9.1.1
Selection
You can select and position all four types in different ways: In the Project Manager, under the Objects tab and in the Room elements folder and then with the mouse:
The simplest method is to drag the required object with the mouse onto the corresponding wall or into the desired room (for the skylight) the dialog window for the additional settings will then open automatically.
You can open the context menu for the required wall or ceiling by rightclicking on it. Under the New menu option, you will see the room elements that are available. After you have selected the required room element, the relevant Properties window will appear. You will find details on the properties of the room elements under 9.1.3 Editing and properties of room elements.
After selecting the required icon, the Selection window will open. In the case of a door, window or picture, you should select the corresponding wall or, in the case of a skylight, the ceiling. In the main menu:
After you have selected the required room element via the main menu option Insert Room elements you should follow the same procedure as under 1. above.
9.1.2
Positioning
Since the positioning of room elements works in the same or a similar way to luminaires, 3D objects, measuring elements and basic objects, information on this has been summarised in Chapter 7 Positioning objects and object groups.
9.1.3
Preview window with icons for rotating, zooming and moving the object
A window is described by a starting point X/Y and the width/height of the window. The reference point for the coordinates is the bottom left-hand corner of the wall being observed, viewing this wall from the inside.
Note
When the coordinates for the window are entered, they are not checked for correctness. Please use the floor plan and the 3D view to conduct a check. The preview window at the top right of the Properties window is also useful here.
Material Transmittance
Glass is used as the default here. Caution! The transmittance must be entered and not the reflectance, such as for walls and cubes, etc.; the reflectance is calculated (ignoring the absorption) as follows: reflectance[%] = 100% transmittance[%] Allows for the influence of pollution dirtying a window (Pollution attenuation factor). 1.0 0.9 0.7 areas corresponds to no pollution standard value for pollution value for highly industrialised 0.9 standard value
Pollution factor
Values:
Allows for the influence of window partitioning (Attenuation factor partitioning). 1.0 corresponds to no partitioning 0.9 standard value Default:
Values:
In the case of a row of windows the option Multiple placement in a row is available in the bottom section of the dialog. If this option is selected, several windows of the same type will be treated as a single object. Using the Relux Vision supplementary module, it is also possible to specify the nature of the frame and the window sill.
Preview window with icons for rotating, zooming and moving the object
A door is described by a starting point X and a width/height. The reference point for the X-coordinate is the bottom left-hand corner of the wall being observed, viewing this wall from the inside.
Note
When the coordinates for the window are entered, they are not checked for correctness. Please use the floor plan and the 3D view to perform a check. The preview window at the top right of the Properties window is also useful here. In the case of a row of doors the option Multiple placement in a row is available in the bottom section of the dialog. If this option is selected, several doors of the same type will be treated as a single object. Using the Relux Vision supplementary module, it is also possible to specify the nature of the frame.
Preview window with icons for rotating, zooming and moving the object
A skylight is defined by the starting point X, Y at the bottom left-hand corner and by its length and width. Contrary to the case for windows, the skylight is observed from outside of the room (see picture in top left with the coordinate axes).
Note
No collision test is carried out between the inputs for the skylight data and the building surface. Please use the floor plan and the 3D view to check this. The preview at the top right of the Properties window is also useful here. This shows the view from inside the room up towards the ceiling (i.e. it differs from the skylight view with the coordinates)
Material Transmittance
Glass is used as the default here. Caution! The transmittance must be entered and not the reflectance, such as for walls and cubes, etc.; the reflectance is calculated (ignoring the absorption) as follows: reflectance[%] = 100% transmittance[%] Allows for the influence of pollution dirtying a window (Pollution attenuation factor ). 1.0 0.9 0.7 corresponds to no pollution standard value for pollution value for highly industrialised 0.9 standard value
Pollution factor
Values:
areas Default: Partitioning factor Allows for the influence of window partitioning (Attenuation factor partitioning). 1.0 corresponds to no partitioning Default: 0.9 standard value
Values:
For a row of skylights, the option Multiple placement in a row is available in the bottom section of the dialog. If this option is selected, several skylights of the same type will be treated as a single object. Using the Relux Vision supplementary module, it is also possible to specify the nature of the frame.
Preview window with icons for rotating, zooming and moving the object
A picture is defined by the starting point X/Y at the bottom left corner and by its width and height.
Note
When the coordinates are entered, they are not checked for correctness. Please use the floor plan and the 3D view to perform a check. The preview window at the top right of the Properties window is also useful here. In the case of a row of pictures, the option Multiple placement in a row is available in the bottom section of the dialog. If this option is selected, several doors of the same type will be treated as a single object. Please note that it is possible to assign a texture to pictures (material assignment). This allows pictures to be assigned surfaces and thus to be displayed even more realistically. Using the Relux Vision supplementary module, it is also possible to specify the nature of the frame.
9.2
Basic objects
There are four different types of basic objects: cube, working surface, pillar und partition wall
9.2.1
Selection
You can select and position all four types in different ways: In the Project Manager, under the Objects tab and in the Basic objects folder:
Fig. 910 Project Manager, Objects tab and Basic objects folder
Click on the required object and move it by Drag & Drop to the required position on the floor plan or a 3D view. You can also right-click on the object and open the context menu and then select menu option Insert into room to insert an object into the room at coordinates 0 m/0 m. You can also insert the object at the coordinate origin by means of a double click. You will find details on the properties of the basic objects under 9.2.4 Editing and properties of basic objects.
2. With the individual icons on the Insert toolbar: By clicking on the individual icon, the desired basic object will be inserted in the room at coordinates 0/0. You will find details on the properties of the basic objects at 9.2.4 Editing and properties of basic objects. With the main menu:
After the required basic object has been selected via main menu option Insert Basic objects, it will be entered in the room at coordinates 0 m / 0 m. You will find details concerning the properties of the basic objects under 9.2.4 Editing and properties of basic objects.
9.2.2
Positioning
Since the positioning of basic elements works in the same or a similar way to luminaires, 3D objects, measuring elements and room elements, information on this has been summarised in Chapter 7 Positioning objects and object groups.
9.2.3
Drawing
You can also draw cubes, working surfaces and partition walls. To do this, call up the context menu of the Floor plan action window and select menu option Draw object or use the Insert toolbar.
After clicking on the required basic object, crosshairs will appear in the Floor plan action window. You can place the crosshairs on the required starting point and create this with a click. After this, you should go to the next points, one-by-one, and create these with further clicks. The connecting lines between the points will be shown in black. You must double-click the last point. The object will then be created and depicted with coloured lines. Depending on the desired accuracy of the area, it can make sense to switch off or refine the placing grid beforehand.
Note
There are two basic types of objects for objects entered by drawing. Area-type objects (cube, working surface) are drawn as a closed polygon. The area drawn constitutes a reference area which can, if necessary, be extruded in the Z direction by the height that is entered. Line-type objects (partition wall) are drawn as an open polyline. This polyline is interpreted as the median line, which is extruded in accordance with its width and height. It is important to check the height after drawing a cube or partition wall.
9.2.4
Preview window with icons for rotating, zooming and moving the object
A cube can be freely dimensioned over its length, width and height. It can be positioned at any desired point in the room by specifying three angles of rotation and a central point (X, Y, Z). All the sides (the standard number is 6) are included in a calculation. A material and/or a colour can be allocated to all the sides either simultaneously or individually. Four options are available for all basic objects that are based on the cube type: Design object These elements are not taken into account in the calculation of measuring elements (they are not cut out). Shading is, however, generated for the visualisation. The element is converted into a pillar: - Floor space set on Z=0 - Height set at room height - Stands vertically in the room Locked Hidden Can no longer be changed or moved via the mouse. The element is no longer shown on the floor plan. It is, however, calculated.
Column
In the Extended tab, it is possible to select the material or colour for each individual object surface and specify whether it is to be calculated (tick next to output). In the case of polygonal objects, it is possible to add corner points or delete them from the list. In the Insertion point tab, it is possible to set the point of insertion for the object (more on this in Chapter 7.1 Positioning objects). In the Calculation tab, you can enter the surfaces to be calculated and the calculation raster to be used. Basic object working surface:
Preview window with icons for rotating, zooming and moving the object
The actual working surface is a rectangular or polygonal surface that can be positioned anywhere in the room. It is defined by means of: Rectangular area Centrepoint - Length - Width - Angle of rotation around 3 axes - Angle of rotation around three axes The working surface has two active sides. These sides are shown as surfaces in the 3D view. Both the illuminance values and the isolines can be shown on each of the sides. A typical working surface would be a desk or a drawing board, for example. The height of a working surface is set at 0.02 m. Polygonal area - Insertion point - Any desired number of corner points
Three options are available for all basic objects that are based on the working surface type: Design object These elements are not taken into account in the calculation of measuring elements. (They are not cut out.) Shading is, however, generated for the visualisation. Can no longer be changed or moved via the mouse. The element is no longer shown on the floor plan, it is, however, calculated.
Locked Hidden
In the Extended tab, it is possible to select the material or colour for each individual object surface and specify whether it is to be calculated (tick next to output). In the case of polygonal objects, it is possible to add corner points or delete them from the list. In the Insertion point tab, it is possible to set the point of insertion for the object (more on this in Chapter 7.1 Positioning objects). In the Calculation tab, you can enter the surfaces to be calculated and the calculation raster to be used.
Preview window with icons for rotating, zooming and moving the object
Pillars are displayed and calculated as cube elements, starting at the floor and extending up to the ceiling. They can be converted into polygonal, round or rectangular pillars in the input dialog for pillars. The side lengths can be varied as required. The minimum side length is 10 cm. Three options are available for all basic objects that are based on the pillar type: Design object These elements are not taken into account in the calculation of measuring elements (they are not cut out). Shading is, however, generated for the visualisation Can no longer be changed or moved via the mouse.. The element is no longer shown on the floor plan, it is, however, calculated.
Locked Hidden
In the Extended tab, it is possible to select the material or colour for each individual object surface and specify whether it is to be calculated (tick next to output). In the case of polygonal objects, it is possible to add corner points or delete them from the list. In the Insertion point tab, it is possible to set the point of insertion for the object (more on this in Chapter 7.1 Positioning objects). In the Calculation tab, you can enter the surfaces to be calculated and the calculation raster to be used .
Preview window with icons for rotating, zooming and moving the object
A partition wall is defined as a footprint which starts at the floor and can be of any height. The partition wall can be positioned at any desired point in the room, but always stands at right angles to the floor. The dimensions for the partition wall are entered by specifying the starting point (left) and end point (right). The partition wall is shown with a thickness of 10 cm as the default, but this can be changed in the Width dialog field. Four options are available for all basic objects based on the partition wall type: Design object These elements are not taken into account in the calculation of measuring elements (they are not cut out). Shading is, however, generated for the visualisation. Column The element is converted into a pillar: - Floor space set on Z=0 - Height set at room height - Stands vertically in the room Locked Hidden Can no longer be changed or moved via the mouse. The element is no longer shown on the floor plan. It is, however, calculated.
In the Extended tab, it is possible to select the material or colour for each individual object surface and specify whether it is to be calculated (tick next to output). In the case of polygonal objects, it is possible to add corner points or delete them from the list. In the Insertion point tab, it is possible to set the point of insertion for the object (more on this in Chapter 7.1 Positioning objects). In the Calculation tab, you can enter the surfaces to be calculated and the calculation raster to be used.
9.3
9.3.1
Importing 3D objects
You can read in 3DS, VRML and DXF files.
Fig. 917 Main menu option File Import -3D object and Open window
After the file has been selected, the Scaling window will open. Here you will see the scaling factor and the size of the bounding box (a cube that the object fits into). You can change the scaling and, after you have entered this, see how the size of the bounding box and hence of the object changes. The number (amount) of triangles gives you information on the degree of detail of the object.
The imported files are only available in the current project. After they have been imported, they are visible in the Project Manager in the 3D objects/furniture folder and can now be used in the project.
9.3.2
Generating furniture
Furniture constitutes a particular form of group. The large number of objects in the library extends from tables, chairs, cupboards and shelves via figures and plants / trees right through to vehicles. A combination of elements of this type can similarly be made up into a furniture element again. There are two prerequisites for creating a new item of furniture: 1. None of the elements may belong to another existing group 2. The point of insertion must be on the coordinate origin The users customised furniture is available in the form of object groups for all new projects. Method: Assemble all the elements for the new item of furniture at the coordinate origin (x=y=z) in the desired orientation. Mark all the elements at once; a) keeping the left-hand mouse button pressed, create a frame around the elements b) click on the elements individually, keeping the Shift button pressed Call up the context menu with the right-hand mouse button and select the Create furniture command. The Edit library dialog will open. A "Customized Objects will now appear at the end of the list, in the section on the left, showing the new furniture object as a sub-option. Enter the designation and activate the areas for which outputs are to be compiled by marking the checkbox in the corresponding line. Terminate the dialog with "OK".
Note
Highly intricate and detailed furniture is made up of a very large number of individual elements; if there is a large amount of furniture of this type, this can increase the computing time considerably. It is recommended that unnecessary areas be deleted where appropriate even after furniture has been generated (the bottom of a cupboard, for example). You will find two furniture libraries in the libraries folder: Standard35.blk Custom35.blk library for the standard available in Relux furniture
9.4
9.4.1
3D objects
Selection
After 3D objects (3DS, VRML, DXF) have been imported, they are available in the project library and can be used in the project. If you wish to insert furniture from a furniture library, you must first select the corresponding furniture so that it is available for the project. To do this, go to the Project Manager, click on the Objects tab and then select the Add option. The Selection window will then open. You can then open the Relux standard furniture library by pressing on the Standard objects button, or open the furniture library with the furniture you have compiled yourself by pressing on the Own objects button. You can also search for and open other libraries with the icon.
If you wish to select several items of furniture, you should press the Accept button. If you only wish to select one item of furniture, or once you have selected all the desired items of furniture, you can press on the Accept and close button. The selected items of furniture are now available in the current project and are visible in the Project Manager under the 3D objects/furniture tab.
You can select and position the 3D objects and furniture in different ways: 1. In the Project Manager, under the Objects tab and the 3D objects/furniture folder:
Fig. 923 Project Manager, Objects tab and "3D objects/furniture" folder
Click on the required object and move it by Drag & Drop into the required position on the floor plan or a 3D view. You can also right-click on the object and open the context menu and then select menu option Insert into room to insert an object into the room at coordinates 0 m / 0 m. You can also insert the object at the coordinate origin by means of a double click. You will find details on the properties of 3D objects/furniture under 9.4.3 Editing and properties of 3D objects.
2. With the individual icons of the Insert toolbar: After selecting the furniture icon, the last object in the list of 3D objects/furniture available in the project will always be positioned in the room at coordinates 0 m / 0 m (Project Manager, Objects tab, 3D objects/furniture folder). To change the furniture type, you must open the properties window for this item of furniture with a double click. You can now have all the furniture that is available in the project displayed under Type; alternatively, you can select a new type from a furniture library by pressing on the icon. You will find details on the properties of 3D objects/furniture under 9.4.3 Editing and properties of 3D objects. 3. With the main menu:
After selecting main menu option Insert 3D objects, you have the option of positioning one of the items of furniture that is available in the project or of going via menu option New 3D Object to select a new type of furniture. The selected object is inserted in the room at coordinates 0 m / 0 m. You will find details on the properties of 3D objects/furniture under 9.4.3 Editing and properties of 3D objects.
9.4.2
Positioning
Since the positioning of 3D objects/furniture works in the same or a similar way to luminaires, room elements, measuring elements und basic objects, information on this has been summarised in Chapter 7 Positioning objects and object groups.
9.4.3
Preview window with icons for rotating, zooming and moving the object
3D objects/furniture can be positioned by entering the X, Y and Z coordinates for their centre point. The rotation is performed around the point of rotation in the X/Y plane of the individual item of furniture. A scaling factor can be set for each coordinate direction. In the Type field, you can select furniture that is available in the project, or you can use the icon to select a new type from a furniture library.
There are five options available for all 3D objects/furniture: Design object These elements are not taken into account in the calculation of measuring elements (they are not cut out). Shading is, however, generated for the visualisation. Sloping lines and curves are depicted more realistically (Anti-aliasing in order reduce the staircase effect on sloping and round lines) It makes sense to use this if a 3D object has one-sided, transparent surfaces or looks as if it incorporates holes Can no longer be changed or moved via the mouse. The element is no longer shown on the floor plan. It is, however, calculated.
Smooth edges
Locked Hidden
In the Insertion Point tab, you can specify the insertion point for the object (more explanations may be found in Chapter 7.1 Positioning objects).
MATERIALS 168
10
MATERIALS
You can depict your planning on a realistic basis with the aid of materials (colours, textures and Vision materials). A material can be allocated to each individual design object or 3D object in Relux.
10.1
Colours/Reflectance
You will find information on the subject of colours and reflectance in Chapter 5.1 Room types.
MATERIALS 169
10.2
Textures
In the Project Manager, open the Properties window by selecting the Project tab and double-clicking on the desired surface (e.g. Wall 1)
Fig. 102 Opening the "Properties" window via the Project Manager
MATERIALS 170
Open the Select material window with the Add button. In the left-hand section of the window you can open the Relux texture library via the Texture library menu option. In the right-hand section, you can use the Picture menu option to select your own pictures (see also 10.3 Special features in picture selection) or, beneath this, you can select Vision materials (see 10.4 Relux Vision materials).
In the left-hand section of the window, select the Texture library menu option. Different folders will then come into view, from which you can select the desired texture.
MATERIALS 171
Fig. 106 "Edit materials" window with the selected texture; right: context menu
MATERIALS 172
You can either give the texture you have added a name or adopt the name from the library. With a right-click of the mouse, you can open the context menu. This allows you to delete materials that are not being used in the project, for example. You can also alter the properties of the texture with the Edit button. The Process surface picture window Reflectance (Rho) and Scaling. opens, with the two tabs
Fig. 107 "Process surface picture" window with the "Reflectance (Rho)" tab
MATERIALS 173
Using the controllers for Colour, Contrast, Brightness and Saturation you can change the properties of the texture to suit your requirements.
MATERIALS 174
In the Scaling tab, you can specify the size in which the texture is to be depicted.
Fig. 109 "Edit surface picture" window with the Scaling tab
You can specify a length for the marked line. This is particularly useful for textures such as tiles or ceiling panels. You can then stipulate how big these are to be. You can use the mouse to go on to the picture and draw a line (red line) yourself (picture points) and then specify a length. This is especially practical for objects such as doors, where you know the dimensions.
MATERIALS 175
If you tick the option scale to fit object size, the texture will be displayed once on the picture, for example, that has been selected. If the option is not ticked, the picture will be shown several times, side-by-side, in accordance with the specified scaling.
MATERIALS 176
The height to width ratio of the texture must correspond to the height to width ratio of the surface to which the texture is to be applied. If this is not the case, the texture will be distorted.
Fig. 1013 The Scale to fit object size" option leads to distortion in the picture on the right
By pressing the OK button, you will be returned to the Edit materials window and another click on the OK button will take you back to the Properties window.
MATERIALS 177
The appearance of the surface that you have edited will be displayed in the preview window.
Preview window with icons for rotating, zooming and moving the object
Another approach is to go via the Project Manager and select the Objects tab. In the Materials/textures folder, you can then select the Add menu option to take you to Select material and follow the procedure set out above. Here too, you can open the context menu with a right click of the mouse and delete materials that are not being used in the project, for example.
Fig. 1015 "Objects" tab with the "Materials/textures" folder and the context menu
MATERIALS 178
Using the mouse, you can drag materials that you have read into the project on to the corresponding surface of a wall, floor, ceiling, 3D object or room element, etc. The 3D View must be displayed in the action window to do this.
Fig. 1016 Textures dragged on to walls, the floor and 3D objects with the mouse
MATERIALS 179
10.3
The Open window will appear. You can now select the desired picture (picture formats: bmp, gif, jgp and jpeg).
MATERIALS 180
After the picture has been selected, the properties of the picture are specified in three steps.
Fig. 1019 "Define size of picture", "Name reflectance" and "Insert scale" windows
In step 1, you can define the size of the picture. The picture should not be too big (a maximum of 1024x1024), because this will make the Relux file unnecessarily large and take up a great deal of memory space. Steps 2 and 3 are performed as described in Section 10.2 Texture. You can now press the OK button to proceed. The Edit materials window will open. You now have the same editing facilities as those described in Section 10.2 Textures.
MATERIALS 181
Fig. 1020 The "Edit materials" window with the new "Edit" button
10.4
11
MEASURING ELEMENTS
Measuring elements are virtual measuring surfaces (which do not cause any shading) that can be used to calculate illuminances or UGR values, for example. There are four different measuring elements that you can use: Virtual measuring surface Reference plane for emergency lighting (this is only calculated for emergency lighting; in accordance with EN 1838 Lighting Applications Emergency Lighting only the direct illuminance is calculated; a value must be specified for the minimum illuminance that is required) Escape route (a median line is defined, plus a maximum width of 2 m, as per EN 1838 Lighting Applications Emergency Lighting; this is only calculated for emergency lighting; in accordance with EN 1838 only the direct illuminance is calculated; a value must be specified for the minimum illuminance required) Task area (as per EN 12464-1 Lighting of work places. Indoor work places it is possible to define a task area and assign partial surfaces and surroundings to these) All the measuring elements have an active side. It is thus important for the measuring elements to be correctly positioned/rotated. The active side is the side that points towards the room interior (points upwards) in the basic state. On the floor plan, these areas are shown with red lines and, in the 3D views, with red lines and red shading (only if the menu option Measuring surface off has not been switched on in the context menu for the 3D View action window).
Fig. 111 Measuring element with the active side pointing up (left) and with the inactive side pointing up (right)
The active side is similarly shown in the preview window of the Properties window.
Fig. 112 Measuring element with the active side pointing up (left) and with the inactive side pointing up (right
11.1
Selection
Relux Professional elements. offers you several ways of selecting measuring
Fig. 113 Project Manager, "Objects" tab, and "Measuring elements" directory
Click on the desired measuring element and move it onto the floor plan or into a 3D view by means of Drag & Drop. You can also right-click the measuring element to call up the context menu and then place a measuring element in the room, at coordinates 0/0, via the menu option insert into room. You can also incorporate a measuring element with a double click. 2. Selection via the Control centre: Start the Control centre with menu options Project Control centre or the icon. After clicking on the New button, the Insert new object window will appear. You can now select the desired measuring element.
Fig. 114 Control centre with the Insert new object window
Confirm your selection by pressing the OK button, close the window and you will find yourself in the Control centre window again.
3. Selection and insertion using the icons on the Insert toolbar: By clicking on the relevant icon you can position either the object centre point of the measuring element (virtual measuring surface, reference plane for emergency lighting) or the start of the escape route in the room, at coordinates x=0 m / y=0 m. Before you can position the task area you must have selected a working surface. The size and position are allocated to the working surface selected.
11.2
Positioning
Since the positioning of measuring elements works in the same or a similar way as for luminaires, 3D objects, room elements and basic objects, information on this has been summarised in Chapter 7 Positioning objects and object groups. Only the special features that apply in the case of measuring elements will be explained here.
11.3
Drawing
You can also draw all the measuring elements by calling up the context menu for the Floor plan action window and the Draw object menu option, or by going via the Insert toolbar
Fig. 116 Context menu for the Floor plan action window
This function is especially practical in the case of polygon surfaces that you have saved as a background image, for example (see Fig. 116). After clicking on the desired measuring element, crosshairs will appear in the Floor plan action window. You can position the crosshairs on the desired starting point and then create this by clicking on it. After this, you should go to the subsequent points, one at a time, and create these through further clicks. The line joining the points will be shown in black. You must mark the final point with a double click. Following this, the measuring element will be compiled and displayed by means of red lines. Depending on the desired accuracy of the surface, it may be advisable to turn off the dynamic placing grid beforehand or to make it finer.
For the escape route measuring element you must mark the median line of the escape route. The final point must be marked with a double click; the surface will then be compiled automatically with a width of 2m.
Note
There are two basic types of objects in the case of objects entered by drawing. Area-type objects (virtual measuring surface, reference plane for emergency lighting) are drawn as a closed polygon. Line-type objects (escape route) are drawn as an open polyline. This polyline is interpreted as the median line of the object, which is extruded in accordance with its width.
11.4
Open the Control centre via the menu option Project Control centre or the icon. After selecting the desired measuring element, the Properties window will similarly appear. The Control centre has the advantage that the New, Delete, Duplicate, Group and Break buttons are also available to you in other words, you have the possibility of administering the objects. The Properties window gives you access to all the settings that can be made via the different tabs for Standard, Extended, Insertion point and Calculation.
Note
Depending on the object selected, not all the settings listed below will be available
In the Standard tab you can select the type (virtual measuring surface, reference plane for emergency lighting, escape route) allocate a name specify the position, rotation, shape (rectangular, round or polygonal) and size specify the evaluation type (standard, task area or reference plane/environment) freeze the measuring element (the measuring element can no longer be selected with the mouse in the Floor plan action window or 3D view but only via the Control centre or via the Project manager and the Project tab or icon ) hide the measuring element (the measuring element is no longer visible in the Floor plan action window or 3D view and is also frozen at the same time, i.e. it can only be selected via the Control centre or via the Project manager and the Project tab or icon) specify a minimum illuminance (only for the reference plane for emergency lighting and the escape route) assign partial surfaces (only for the evaluation type of task area) In the Extended tab you can: change the shape (rectangular, round or polygonal) In the Insertion point tab you can: specify or move the position of the insertion point of the object
In the Calculation tab you can: edit the calculation grid (position and number of calculation points; minimum: 3 points, maximum 100 grid points in the X and Y direction). specify which illuminance/UGR values are to be calculated (only for the virtual measuring surface and task area)
If you wish to change the shape of a measuring element later on, you can select the measuring element in the Floor plan action window and move an individual vertex (corner point) with the mouse. If you wish to change the size of the entire measuring element, you can increase or reduce the size of the object as a whole by selecting the measuring element in the Floor plan action window, right-clicking it to call up the context menu and then selecting the menu option Scale, or you can press the icon. The scaling direction can be defined via the menu icon, or you can have the scaling performed option Scale type or the via a manual factor.
In addition, you can add or delete points by selecting the measuring element in the Floor plan or the 3D view action window, right-clicking it to call up the context menu and then selecting the menu options Add vertex or Remove vertex; or you can use the toolbar. icons in the Edit
To add a point, you must first select the menu option Add vertex or the icon and place the cursor on the line to which you wish to add a new point. The line will then be displayed in red. By clicking on the desired point, you can add a new vertex (corner point). You will see this when you select the measuring element again. If you then move the cursor to the new point, the cursor will become a hand, and you can drag the point to the desired position. To remove a point, you must first select the menu option Remove vertex or the icon and place the cursor on the point that you wish to delete. The point is then displayed in red and can be removed with a click.
CALCULATIONS 192
12
12.1
CALCULATIONS
Calculation manager
After you have created a room and positioned luminaires, you can start a calculation via the Calculation Manager. You can specify all the different parameters for the calculation via the Calculation Manager. To start the Calculation Manager you should either select the Calculation Calculation manager menu option or press the icon.
In the left-hand section of the window, Relux Professional sets out all the possible calculation variants for the project. The switches for those calculation options that are not possible are highlighted in grey and cannot be switched on. If you have created a room without windows or skylights, only the Artificial Light switch will be activated. If the Save results after calculation switch is on, Relux Professional will save the project automatically once the calculation has been completed. This means you dont have to remain at your PC while lengthy calculations are being performed, and you can still be sure that the results of the calculation will be saved. The title in the right-hand section of the window shows the room and calculation variant that you are entering the settings for. After you have clicked on the Start button, Relux Professional will start the calculation. To save your settings and quit the window, you should press the Close button.
CALCULATIONS 193
In Fig. 122 you will see the calculation variants for the same room, i.e. the Office, with windows added to it. Relux Professional recognises the possibility of an additional daylight calculation and allows you to select this via the switches. The tabs shown will change according to the calculation variant selected.
Fig. 123 shows a project with several rooms. By selecting unambiguous room names you will always know which room you are entering settings and performing calculations for. The multi-room capability of Relux Professional is described in greater detail in Chapter 5.2 Multi-room capability. An escape route has been set for the meeting room and the luminaires for emergency lighting mode switched on, which means you can also select emergency lighting here. In this way, you can select different calculation variants for each individual room and have them all calculated at once.
The individual calculation variants are explained in the chapters that follow. Since the setting options are the same for the individual variants in some cases, these are set out at the end of the Artificial light calculation variant, and only the specific differences are then explained for the other variants.
CALCULATIONS 194
12.2
12.2.1
As soon as reflecting objects such as walls and a ceiling are available, you should just use the only direct fraction option for a rough calculation or a control calculation. The only direct fraction option can, however, be selected for exterior installations, such as football pitches.
Note
If the only direct fraction accuracy level is selected for an indoor room this will not produce any results of relevance for the lighting planning! The printouts are thus marked to this effect. The settings in the Raster section also have an impact on the calculation accuracy and the computing time. We thus recommend that you adopt the default settings.
After clicking on the Extended>> button, you will see the setting options for the raster spacing. The raster spacing that you can change here relates to the room surfaces and the surfaces of the design elements. The raster spacing for the measuring areas is set in the measuring surfaces tab, via the Project Manager or the Control Centre (Chapter 11 Measuring elements). The Activate dynamic raster switch is used to switch on the dynamic rastering. Here, the program establishes (in the course of the calculation)
CALCULATIONS 195
the luminous fluxes and illuminance gradients that are being processed. The program then works out which surfaces need to have additional raster points incorporated on them. The dynamic raster can be set anywhere between coarse, medium and fine using the slide controller.
Note
The computing time is influenced to a major extent by this setting. The finer the raster-point monitoring is to be, the longer the computing time that will be required for this. In the Maintenance factor section you can enter a maintenance factor manually under the classical option, and this will be valid for the entire project. You can enter a reason for your choice by pressing the Reason button.
You can also have the maintenance factor determined for each individual luminaire type via the EN12464 option, with the detailed specification of the maintenance factor, as required by Standard EN 12464. To do this, you should click on the EN12464 button, and the assistant for specifying the maintenance factor will open. In Fig. 127 you can see that the data for the room, the luminaires and the lamps has to be entered into the assistant. Relux Professional uses this data to calculate the maintenance factor for the particular lighting situation and the selected luminaire type. You can enter a general note for each luminaire type in a text box. This data will be output in the maintenance plan.
CALCULATIONS 196
Note
The maintenance factor is established using standardised data based on: 1. CIE Publication 'Maintenance of indoor electric lighting systems', version 2005, 1995 (marked as 'CIE') 2. ZVEI Publication 'Lebensdauerverhalten von Entladungslampen fr Beleuchtung' (Service life behaviour of discharge lamps for lighting), version November 2005 (marked as 'ZVEI') 3. Philips OEM Catalogue 2003/4 (marked as 'Philips'). More recent lamp types from the individual manufacturers may differ from these.
After activating the Maintenance factor manually switch you can enter a maintenance factor manually for each luminaire type, by adjusting the value in the Maintenance factor luminaire field. A Maintenance factor luminaire box highlighted in yellow shows you that Relux Professional has calculated the maintenance factor automatically on the basis of your inputs for the room, luminaire and lamp. If the Maintenance factor manually switch is switched on, the Maintenance factor luminaire will be white to show that you have entered the maintenance factor manually.
CALCULATIONS 197
In the Miscellaneous section, you can determine whether the body of the light is to be taken into account for the calculation and can thus cast shadows on other objects.
Note
If luminaires are fitted some distance into the building structure (i.e. if they are mounted behind a suspended ceiling or in a concrete recess) it is important to activate the luminaire shadows, because there will otherwise be excessive deviations in the results. The Calculate external faces switch makes it possible to include the external faces of the walls and the ceiling in the calculation. If you activate the Show selected results automatically switch, then, once the calculation is finished, the results that are marked with Output tab in the Project Manager will be opened. in the
CALCULATIONS 198
12.3
For the fields with a white background, only the horizontal illuminance is calculated at present, and you can make entries in these fields. You can enter the number of calculation points for the x direction and the y direction via x and y. Alternatively, you can also specify the desired spacing of the calculation points via dx and dy. If you enter a number of calculation points, the corresponding spacing will be indicated automatically. When a spacing is entered, Relux Professional takes the next possible number and determines the precise spacing from this. Several different calculation types are already specified for the fields highlighted in grey. No entries can be made in these fields.
CALCULATIONS 199
You can use the switches to activate the calculation for the corresponding illuminance or for the UGR method and to set the raster and the height for the calculation. For the vertical and semi-cylindrical illuminance you can select the direction in which the calculation is to be performed. You can add additional directions with the button. For the camera illuminance, you should enter the position of a camera. You can add more cameras by pressing on the button.
CALCULATIONS 200
The half raster width distance to the edge switch lets you specify that the first calculation point should start at a distance equivalent to half the raster width. (See Fig. 1211)
Fig. 1211 first: calculation points on the edge; then: first calculation point half a raster
The Do not calculate measuring points inside objects switch can be used to ensure that these calculation points are not included in the calculation of the average illuminances and uniformities. You can then prevent the results from being distorted by objects. If you wish to assign the same raster to several measuring surfaces, you can do this rapidly by means of the Synchronize selected lines button.
CALCULATIONS 201
12.3.1
You can add an observer by clicking on the observer by clicking on the icon.
Entering a designation will make it easier for you to identify the observers on the floor plan. In the Number of observers section, you can control the animation of the selected observer. The slide controller allows you to set how rapidly the sightline zone should be depicted for the animation. This then allows you to control both the position and the sightline of the observer.
CALCULATIONS 202
12.4
12.5
12.6
In Fig. 1213 all the luminaires are activated in the emergency lighting field. If you wish to activate individual luminaires, you must break up the luminaire group and activate the desired luminaires via the escape route, for example.
CALCULATIONS 203
A reference plane for emergency lighting or an escape route must be positioned in the room. You can enter a separate reduction factor for the emergency lighting in the Calculation tab. Relux Professional will perform an emergency lighting calculation with the activated luminaires and the specific light flow for emergency lighting on the reference plane for emergency lighting and escape routes.
12.7
CALCULATIONS 204
This output in Fig. 1215 shows the detection range of the sensor in pseudo colours, on the basis of its characteristics, as follows: light green area: detection of the tangential direction of motion (the person moves in a circle around the sensor easy for the sensor to detect) green area: detection of the tangential direction of motion (the person moves towards the sensor difficult for the sensor to detect) blue area: detects very small movements (person only moves slightly (presence) very difficult for the sensor to detect) grey area: no persons can be detected here (obstacles, distance too great)
12.8
CALCULATIONS 205
12.9
By clicking on the
If there are a large number of luminaires in a room, it is advisable to restrict the list via the Limit list button on the basis of the minimum luminous intensity and the number of lights that are output.
OUTPUTS 206
13
13.1
OUTPUTS
Project data and calculation results can be output on the screen, printed out or compiled in the form of a pdf document.
Screen outputs
The outputs appear in the action window. All the possible outputs are listed under the Output tab. Possible outputs means that the Luminaire data folder, for instance, will only appear in the folder tree if a luminaire has already been selected, and the Calculation results folder will only appear if a calculation has been performed. Apart from this, the user can see which output windows are open in the action window. Folders can be marked with: a red tick a grey tick , i.e. all the sub-options of the folder are open , i.e. only individual sub-options of the folder are open
Sub-options can be marked with: a red tick , i.e. the sub-option will be shown as a window
a blue tick , i.e. this sub-option will only be displayed in the active window until a new sub-option is selected a red monitor , i.e. the window is always open after the light calculation. First of all, you must open the corresponding output window by clicking on the monitor or the name. Following this, you can select the Edit Open after calculation menu option in the results output window, and the monitor will go red . It is not necessary for there to be a tick in the monitor. Another way to make this setting is to go via the template manager. You will find more on this in Chapter 13.4 Print manager.
OUTPUTS 207
A rapid output of individual windows can also be obtained using the icons on the toolbars for Outputs
and View
OUTPUTS 208
Overview of the current project including calculation results Illuminance on the reference plane (table) Isoline representation on the reference plane Pseudo colours on the reference plane 3D representation of the light distribution Representation of the rooms floor plan 3D view Overview representation Luminance distribution in 3D (variable view) Four standard views, 3D luminance distribution Vision results By selecting the Window Close output window main menu option you can have all the output windows closed. The output windows can be arranged differently with the Window Cascade, Alongside each other or Tile main menu option.
OUTPUTS 209
13.2
13.2.1
via the menu options in the Zoom menu for the individual action window
with the corresponding shortcuts (see above or Chapter 17 Annex) by rotating the mouse wheel: zoom in/out
OUTPUTS 210
Setting the properties of the action window: the Properties window will open when you select the Edit Properties Floor plan menu options here you can switch on and off the options of label room elements and label luminaires; you can also have the luminaire orientation, cameras, observer, background images and placing grid etc. either displayed or not displayed.
OUTPUTS 211
13.2.2
via the menu options in the Zoom menu for the individual action window
with the appropriate shortcuts (see above or Chapter 17 Annex) by rotating the mouse wheel: zoom in/out with the cursor keys: up/down Moving the 3D view: press on the icon and click on the 3D view then, keeping the mouse button pressed, move the 3D view, or use the right/left cursor keys
OUTPUTS 212
Rotating the 3D view: press on the icon and click on the 3D view then, keeping the mouse button pressed, move the 3D view or use the cursor keys: shift+right/left/up/down Setting the viewing angles for the variable 3D view (View 1): via the icon or with the View Set 3D view menu option, or with the Edit Properties 3D views menu option you can set, save and add your own observers/3D views, or delete existing observers/3D views (see Fig. 135 Properties 3D views window). Setting the properties for the action window: select the Edit Properties menu option to open the Properties window on the left, you can choose the following icons: 3D views settings 3D or Origin and placing grid , General
OUTPUTS 213
3D views: here you can define observers, select standard views and have exterior views or wire frame views or the like shown. 3D general settings: You can specify step sizes for the change by using the keyboard and specify whether: in the case of suspended and freestanding luminaires, the suspension and stand are to be shown on the 3D views or not in the case of exterior installations and daylight, the background is to be coloured black or not Making changes via the action window menu: user-defined observers/3D views can be selected via the View User defined views menu option by selecting the Display menu and then different menu sub-options, you can have the exterior view and wire frame model displayed and either have the luminaire orientation shown or not Making changes via the context menu:
you can copy the current output window to the clipboard via the Copy picture menu option you can save the current output window as a jpg or bmp file via the Save picture menu option
OUTPUTS 214
you can have either the C-planes, the volume model or the luminaire orientation displayed via the Show 3D ldc menu option
you can aim luminaires by specifying the aiming point (see Chapter 8.1.2 The Online tab); to do this you should select the Aim luminaires menu option you can have the desired view displayed by selecting the Exterior view menu option or the Wire frame view menu option
you can switch off the hatching on the measuring surface and simply have the edge displayed by selecting the Measuring surface off menu option
OUTPUTS 215
13.2.3
OUTPUTS 216
tabular output: select the Table icon: set the number of decimal places icon: set the number of decimal places, display
select the Isolines/Pseudo colours icon: you can now set your own scaling and also set your own colours for the pseudo colour diagrams select the Overview uniformities icon: set the number of decimal places and show
OUTPUTS 217
Making changes via the action window menu: by selecting the Edit Open after calculation menu option you can specify that the selected window should always be opened after the calculation. These outputs will be marked with a red monitor Project Manager Output tab. in the
changes cannot be made via a context menu in the case of results outputs, since these do not have any context menus.
OUTPUTS 218
13.2.4
via the menu options in the Zoom menu for the individual action window
with the appropriate shortcuts (see above or Chapter 17 Annex) by rotating the mouse wheel: zoom in/out with the cursor keys: up/down moving the 3D view: press the icon and click on the 3D view then, keeping the mouse button pressed, move the 3D view or use the right/left cursor keys rotating the 3D view: press the icon and click on the 3D view then, keeping the mouse button pressed, rotate the 3D view or use the following cursor keys: shift+right/left/up/down setting the viewing angle for the variable 3D view (View 1): open the Properties window by pressing on the icon or selecting the View User defined views menu option or the Edit Properties menu option and then selecting the icon you can set, save and add your own observers/3D views or delete existing observers/3D views (see Fig. 135 Properties 3D views window). setting the properties of the action window: you can open the Properties window by selecting the Edit Properties menu option you can select the following icons on the left-hand side: Brightness 3D views , 3D general settings or White balance . ,
OUTPUTS 219
Brightness: the brightness of the display can be changed automatically here with the Automatic scaling button or you can also change it manually 3D views: you can define observers, select standard views, an exterior view or wire frame view, etc. 3D general settings: You can specify step sizes for the change by using the keyboard and specify whether: in the case of suspended and freestanding luminaires the suspension and stand are to be shown on the 3D views or not in the case of exterior installations and daylight, the background is to be coloured black or not White balance: you can perform a white balance here Making changes via the action window menu: you can select the user-defined observer/3D views via the View User defined views menu option you can have the 3D raster points displayed and the luminaire orientation displayed or not displayed by selecting the View menu and different menu sub-options
OUTPUTS 220
you can copy the current output window to the clipboard via the Copy picture menu option you can save the current output window as a jpg or bmp file via the Save picture menu option you can have either the C-planes, the volume model or the luminaire orientation displayed via the Show 3D ldc menu option
the brightness can be set manually via the Brightness menu option
a white balance that has been performed beforehand can be switched on or off by means of the White balance menu option you can have a white balance performed by selecting the Configure white balance menu option
OUTPUTS 221
you can have the raster points displayed by selecting the 3D raster points menu option.
13.3
Page preview
You can call up the Page preview window by pressing on the icon. This shows all the pages that are marked in the Project Managers Output tab (blue or red tick). In other words, all the windows that are open in the action window are shown.
The left window shows the folder trees and the available outputs. The right window shows the output selected in the left window (marked in grey or blue ) as a print preview of the page. You can change the size of the presentation (Zoom) or browse through the pages by means of the toolbar above the right window . The Properties button under the left window will open the Properties window for the page selected in the left window (marked in blue or grey). You can make a large number of changes, as set out in Chapter 13.2 Changing screen outputs
OUTPUTS 222
You can make a large number of settings under the right window.
When you click on the Project data button, the Enter project data window will be shown. You have the option of making changes to the project data. You will find more information on this in Chapter 14.1 Entering the project location. After selecting the Page setup button, the Page setup window will appear.
Here you can set the paper size and source, portrait or landscape format and the size of the margins. By pressing the Printer button you can select the desired printer. The printout or PDF compilation can then be started by pressing the OK button. When you select the Header and Footer button, the Header and footer window opens, where you can make changes to the page layout. You will find more information on this in Chapter 4.4 Page setup. Additional selection fields allow to you select whether chapter numbers and page numbers, are to be output or not, which pages are to be printed out, and which printer is to be used, or whether a PDF document is to be compiled. You can start the printout by pressing the Print button.
OUTPUTS 223
13.4
Print manager
Another possibility for producing a printout is to go via the print manager. This is called up via the Output Print main menu option.
The Print Manager summarises all the data from the Project Manager (Output tab) and the Page preview window in a single window. It also gives the user access to the Template manager. The left-hand section of the window shows the available outputs, the central section, the selected outputs, and the right-hand section the print preview. Select the outputs you require from amongst the available outputs in the left section of the window. When you click on the printer symbol prior to the output, a red tick will be added to it for the output and the output will be placed in the current print outputs (central section of the window). If entire folders are to be output, this can be done by clicking on the printer symbol for the folder. A red tick is then assigned to the folder and all the sub-options. If only parts of a folder are to be output, it is first necessary to open the folder. You can then select the required output by means of a click on the printer symbol. The folder will then be marked with a grey tick , meaning that only parts of the folder will be output. If you had already marked outputs in the project beforehand, these can be adopted by pressing on the Add to printjob button under Open screen outputs. If this function has already been implemented or if all the windows are already contained in the current output, the Add to printjob button will not be displayed.
OUTPUTS 224
Template manager
On the bottom left, under Template you can select a standard template (Basic, Advanced, Highend or User-defined), or you can start the Profile Manager by pressing the icon and then define new templates. All the templates are not only available in the current project but can also be called up for other projects.
When you press the Create new profile button, the Add new profile window will open and you can create a new profile. The new profile can be based on any existing profile or on the standard profile. The standard profile is always empty and cannot be edited.
OUTPUTS 225
All the possible outputs are shown in the Available outputs window on the left, and you can select the ones you require from amongst all the outputs shown. A distinction is drawn between a screen output : screen output: all the selected windows will automatically be opened after the calculation; this is highlighted in the Output tab of the project manager through the red monitor printout: all the selected windows will be printed out The right-hand Current print outputs window only shows the selected outputs for printouts. You can also define the properties of the printouts selected. You will find more on this in Chapter 13.2 Changing screen outputs. With the option Accept current profile as default, you can determine which profile is to be used as the standard. It is important here that you should save your selection with the Save button and then, when quitting, answer the prompt regarding changes with yes. The functions in the central and right-hand section of the Print manager window have already been described in Chapter 13.3 Page preview and will not be described again here. and a printout
14
14.1
DAYLIGHT CALCULATIONS
Entering the project location
The project location is entered via main menu option: Project - Location. A location can either be selected from the location list, or a new location entered. To register a new location, it is necessary to enter the geographic longitude and latitude and the time zone (difference compared with UTC Universal Time Coordinated). It is also possible to make allowance for daylight saving time (summer time) and enter the start and end of daylight saving time.
14.2
You can use the North angle button to specify the orientation of the room compared with geographic north. The orientation of the room is important for daylight calculations. The North angle that is entered is also shown on the floor plan for each room separately. An example for a North angle of 30 is set out in Fig. 143.
Fig. 143 "North angle" window and depiction on the floor plan
14.3
These settings are only relevant for the daylight and sun calculations. The thickness of the walls is necessary to ensure the correct calculation of daylight/insolation, so that allowance can be made for niches in the wall. The thickness of the ceiling is necessary to ensure the correct calculation of daylight/insolation, so that the influence of openings in the ceiling can be taken into account.
14.4
Canopy
You can enter a canopy in the Control centre. To start the Control centre, select menu option Project Control centre or the icon. Following this, select the New button. The Insert new object window will open. Here you should select the Canopy menu option and confirm it with the OK button, which will take you back to the Properties window in the Control centre.
Fig. 145 Control centre with the "Insert new object" window
Fig. 146 Control centre with the Properties window for a canopy
A canopy is defined as a surface that is attached horizontally to a wall. The starting point x' can be established by looking at the wall in question from the outside and from the front. The starting point x is then calculated from the left-hand outermost corner (including the wall thickness). The canopy reduces the impact of daylight in the indoor room, as well as the insolation. The canopy is taken into account for calculating the lighting
in the room. The "Extended" tab corresponds to the one for a cube object. It is also possible to subsequently change the associated wall that goes with the canopy here. The sides can be assigned different materials, textures and colours. The desired surfaces can be marked for the calculation outputs.
Fig. 147 Room with a canopy floor plan and exterior view
The 3D exterior view can be called up via the context menu of the 3D view action window by selecting the Exterior view menu option (see Fig. 148).
Context menu for the "3D view" action window with the "Exterior view" menu
14.5
External obstructions
External obstructions reduce the impact of daylight in an indoor room as well as the insolation. If there are obstructions in the surroundings, these must be entered for daylight calculations. You can use the basic object of Cube here. You will find more about the basic object Cube in Chapter 9.2 Basic objects.
The 3D exterior view can be called up via the context menu for the 3D view action window by selecting the Exterior view menu option (see Fig. 148).
14.6
Sky models
Clear sky to CIE Only the sky radiance, without the radiation from the sun is taken into account here. CIE Publication No. 22 of 1973 (Relux: for calculations with sun) The CIE defines an overcast sky with non-uniform light distribution which differs slightly from DIN 5034 Part 2. CIE Publication No. 22 of 1973
14.7
Daylight factor
The daylight factor in an indoor room with a diffuse sky state to DIN 5034 is calculated as follows:
Note
D = 100%
Ei Ea
D Daylight factor in percent Ei Horizontal illuminance in lux at a point inside the room Ea Horizontal illuminance in lux outdoors, with a uniformly overcast sky Apart from the daylight factor, the program also calculates the resultant illuminance for the uniformly overcast sky to DIN 5034. To ensure that this data can be correctly important for the location and the times of be entered accurately. The North angle calculation, since the sky is assumed to be calculated by the program, it is day and the times of the year to does not play any role in the rotationally symmetric.
These results are similarly influenced by other factors, such as obstructions through other buildings, a buildings own shadows and data on daylight openings. Since, with a uniformly overcast sky, the illuminance in the indoor room always changes in proportion to the outdoor illuminance, once the daylight factor has been calculated, this is independent of the time of day and time of year and can be taken as a basis for further work with daylight.
14.8
Daylight calculations
Daylight calculations can be started by selecting main menu option Calculation Calculation manager or going via the icon.
In the Calculation manager window that then opens, you can choose between a Daylight calculation or a Solar altitude graph. It is also possible to opt for Artificial and daylight. You will find further details on this in Chapter 12.
14.8.1
Daylight
There are three tabs for the Daylight calculation.
Under the Calculation tab, you can select the calculation precision, the raster, the sky model and the options listed under Miscellaneous. In the top section of this tab, you can set the desired precision (number of interreflections).
The dialog shows four different settings: only direct fraction This should only be used for rough calculations or control calculations. The results of the direct calculation can be viewed on the screen. If they are printed out, they will have a bar running at an angle over the page with the words direct part only. low indirect fraction This is used for directly-radiating luminaires, or if the interreflections of the walls do not contribute very much to the illuminances on the reference plane, e.g. big halls, rooms with large window surfaces, or low reflectances at the walls. This should only be used as a trial calculation for daylight calculations. average indirect fraction Average calculation accuracy for luminaires with a low indirect component or big halls without a great deal of wall surface. This is the standard mode for daylight calculations. high indirect fraction The best level of precision, calculating a high number of interreflections; specially intended for luminaires with a higher indirect component. This calculation mode requires the most computing time but also offers the most accurate results. The central section contains the setting for the raster interval on the room surfaces and the surfaces of the structural elements. The raster intervals for the measuring areas are set in the Measuring areas tab or in the Properties window for the measuring areas. You will find more details on this in Chapter 11.4. You can also switch on a "dynamic raster" in order to improve the results. This means that the program will work out the luminous fluxes and illuminance gradients while the calculation is progressing. The program then works out from this which areas need to have additional raster points inserted on them.
Note
The calculation time is influenced to a major extent by this setting. The finer this verification, the longer the computing time that will be required. In the third section, the sky is selected: - overcast sky according to CIE - clear sky according to CIE (with sun)
In the Measuring areas tab, you can enter the calculation parameters for the measuring surfaces in the project. You will find more on this subject in Chapter 11.4.
Fig. 1412 Calculation manager with the "Measuring areas" tab and the "Calculation parameters" window
In the Date tab, you still have to enter a date and a time of day so that the solar altitude can be determined, together with the resultant luminance in the sky. In addition to this, you can enter the project location and the North angle.
Note
The local time can be entered for the time. The true local time required for the calculation is calculated on the basis of the location. If the illuminances only the daylight component are to be calculated inside a room, it is also possible to establish the daylight factor from this. The daylight factor can then also be output for the measuring surfaces. The daylight factor is required for the Daylight economic efficiency calculation. You will find more details on this in Chapter 15.1. You can start the calculation by pressing the Start button.
14.8.2
On the matrix-like pattern of the solar altitude graph, the virtually horizontal lines represent the month curves. The shortest line is for 21.12. The date changes for the first six months of the year, from the top downwards, to 21.01, 21.02, 21.03, 21.04, 21.05 and 21.06. The data for the second six months of the year then follows the opposite course, which means that the solar altitudes in the sky are repeated for the second half of the year. The curves for 21 March and 21 September are thus identical. The curved vertical lines show the times of day. The areas shaded in light yellow show the time of year and time of day when direct sunlight falls on the previously-defined point. The solar altitude can be precisely calculated for each individual point on the Earths surface and for each point in time. The height and azimuth of the sun can thus also be read off the picture provided.
Note
For this calculation, it is mandatory to ensure the correct North angle and also the degrees of latitude and longitude for the buildings location.
A point in the room must be specified for the calculation. The calculation is then started by pressing the Start button.
14.9
Efficiency Daylight
You will find information on the economic efficiency calculation for a daylight-based lighting control system in Chapter 15.1.
ECONOMICS 239
15
ECONOMICS
You can perform economic efficiency calculations for daylight or artificial light via main menu option Calculation Economics - .
15.1
Economics: Daylight
The main menu option Calculation Economics - Daylight is used to perform an economic efficiency calculation for the use of daylightcontrolled systems. This section of the program determines the monthly or annual percentage share of time for which daylight (using a defined daylight factor that has been determined beforehand in a daylight calculation) is sufficient to illuminate the workplace with a specified illuminance.
Note
D = 100%
Ei Ea
D Daylight factor as a percentage Ei Horizontal illuminance in lux at a point inside the room Ea Horizontal illuminance in lux outdoors with a uniformly overcast sky
The calculation is performed on the basis of horizontal illuminances to DIN 5034 taking the two sky states of overcast sky and clear sky From these two extreme sky states, the so-called average sky is determined, which is calculated from the percentage shares (sun probabilityof the two sky states. If there are no details of the sky states at a selected location, the clear sky component can be taken to be 40% and the overcast sky component 60% (DIN 5034). This all-in assumption, however, rates the winter months too
ECONOMICS 240
highly, since these months generally have 20-30% clear sky, and it also underrates the summer months. The sun probability for Basel is saved in the tables and should form the basis for all calculations. To ensure that the calculation is as accurate as possible, only those times for which the office is actually used are taken into account. For this reason, the program only makes allowance for working days (Monday - Friday). If necessary, the staff breaks, holiday periods and public holidays can also be taken into account. The following steps are necessary for calculating the economic efficiency for daylight: 1. Defaults
Start and end of the working day: - The time must be entered in the format shown (e.g. 8:00) Staff breaks: - Three staff breaks can be entered Holiday periods: - Three holiday periods are possible, specifying the start and end of the holiday Format: dd.mm.(yyyy) - Daylight saving time (summer time): The calculation can be performed with daylight saving time if required. - Illuminance data: For calculating the percentage share of daylight in the overall lighting, it is necessary to have the lighting engineering data for the daylight factor (in %) determined by means of the daylight calculation beforehand and the required illuminance (in lux) at the workplace.
ECONOMICS 241
The average daylight factor is generally obtained from the detection range of a daylight sensor that controls the system. You must decide on a location for one or more sensors and conduct a daylight calculation so that you can enter the value here.
Note
The geographical data (location, degree of longitude and latitude) and the project data will be taken from the current project. 2. Sun probability
In this window, the sun probabilities for determining the average sky are selected. The DIN Standard makes provision for a breakdown into 40% clear sky and 60% overcast sky, i.e. 40 will be entered for all the months if the DIN Standard button is pressed. It is also possible for you to enter your own values for each month, e.g. those taken from DIN 4710 for eight German cities. If you enter your own values for your project location, you will receive an additional button (in the Figure, this is Basel, for example).
ECONOMICS 242
Lighting installation
Data on the number and power consumption of the luminaires and also on the electricity tariff 4. Isolux curves
The corresponding Isolux lines that are to be depicted on the diagram output can be set here. After the inputs have been made, the evaluation of the data can be started with the Calculate menu option. After the evaluation has been completed, the results are presented directly in four windows: - Isolux curves for an overcast sky - Isolux curves for a clear sky - Evaluation of the monthly results and the overall annual value (percentage of working time with sufficient daylight) Cost comparison with and without light control
ECONOMICS 243
15.2
An economic comparison can be compiled for up to three luminaire types. The basic values specified are used to calculate the installation costs and the annual operating costs. These points are listed together on the output for the selected luminaire types. The luminaire types to be compared can be adopted from the current project by pressing the Accept button, or can simply be entered manually. The user must enter the calculation basis (procurement price, etc.) prior to the calculation via the Edit button. The Edit single luminaire window will open with four tabs. The corresponding values must be entered in these.
ECONOMICS 244
Once all the data has been entered for the luminaire types that are to be compared, the output of the calculation results can be started with the OK button.
ECONOMICS 245
Fig. 1510 Results output for the artificial light efficiency calculation
ECONOMICS 246
Explanation of the individual items on the efficiency calculation: Description of the lighting installation No. Lighting cost factor 1. Luminaire order number 2. Luminaire name 3. Lamp designation lamp wattage 4. No. of lamps per luminaire Basic values 5. Nominal luminous flux of all lamps in the luminaire (lm) 6. Average lamp service life (h) Watts per luminaire, incl. ancillary equipment (W) 8. 9. Pollution factor (0.8) 10. Number of luminaires (quantity) 11. 12. Electricity tariff (EUR, CHF/kWh) 13. Estimated annual operating period (hours) Installation costs 14. Costs of a luminaire (EUR, CHF) 15. Accessory costs per luminaire (EUR, CHF) e.g. separate control units, suspension, etc. 16. Wiring and installation costs per luminaire (EUR, CHF) 17. Price per lamp (EUR, CHF) 18. Lamp price per luminaire (EUR, CHF) (Item 4 * Item17) 19. Total procurement costs per luminaire (EUR, CHF) (Item 14 + Item 15 + Item 16 + Item 18) 20. Total installation costs (EUR, CHF) Annual operating costs 21. Total procurement costs per luminaire without lamps (EUR, CHF) (Item 14 + Item 15 + Item 16) 22. Total installation costs without lamps (EUR, CHF) (Item 10 *Item 21) 23. Annual fixed costs (EUR, CHF)(15% of Item 22, including 10% depreciation and 5% taxes, interest and insurance) (Item10 * Item19)
ECONOMICS 247
Annual operating costs 24. Number of lamps changed per year (Item 4 * Item 10 * Item 13)/Item 6 25. Annual lamp replacement costs (EUR, CHF) (Item 17 * Item 24) 26. Annual costs for replacement parts (EUR, CHF) e.g. starters, etc. 27. Total annual cost of replaced material (EUR, CHF) (Item 25 + Item 26) 28. Estimated labour costs (EUR, CHF) for changing a lamp 29. Estimated labour costs (EUR, CHF) for lamp changing each year (Item 24 * Item 28) 30. Cleaning costs per luminaire 31. Number of times each luminaire is cleaned per year 32. Annual cleaning costs (EUR, CHF) (Item 10 * Item 30 * Item 31) 33. Total annual labour costs for maintenance (EUR, CHF) (Item 29 + Item 32) 34. Total annual costs for maintenance (EUR, CHF) (Item 27 + Item 33) 35. Annual electricity costs (EUR, CHF) (Item 7 * Item 10 *Item 12 * Item 13)/1000 36. Annual total operating costs (EUR, CHF) (Item 34 + Item 35) Total and relative costs 37. Annual total costs (EUR, CHF) (Item 23 + Item 36)
16
OFFER PROGRAM
The project data (information on the luminaire types used) can be transferred to the offer program RELUX Offert via the main menu option Calculation Start offer program.
Fig. 161 The Relux Offert offer program with data from the Relux project
You can use the Relux Offert program to compile offers (with a price) or tenders (without a price, leaving space for alternative products). You will find further information in the Help provided in the Relux Offert program.
ANNEX 250
17
17.1
ANNEX
Shortcut table for main menu
Main menu Menu option Edit Select All Edit Cut Edit Paste Edit Break group Edit Copy Edit Delete Edit Group objects Edit - Undo Edit Hide/freeze objects Edit - Redo File - New File - Open File - Save Project Control centre Shortcut Ctrl+A Ctrl+X Ctrl+V Ctrl+Shift+ G Ctrl+C Del Ctrl+G Ctrl+Z Ctrl+L Ctrl+Y Ctrl+N Ctrl+O Ctrl+S Ctrl+Enter Explanation Select all Cut out Insert Break up group Copy Delete Group objects Undo an action Opens a window for hiding or freezing objects Redo action Open new project Open existing project Save project Open Control centre
ANNEX 251
17.2
Ctrl+Q Shift+F3
ANNEX 252
17.3
Corner point Delete Settings toolbar Show 3D light distribution Calculate toolbar Artificial light Daylight Artificial and daylight Relux Vision View toolbar Representation of the rooms floor plan Overview representation
Ctrl+F
Ctrl+K
F2
F7
Shift+F7
ANNEX 253
17.4
Shortcut table for context menus (right mouse button) in the action window
This table only lists the shortcuts that are not already contained in the other tables. Context menu in the action window Menu option Properties Unlock reference plane Move object to front Shortcut Ctrl+B Ctrl+Shift+ 8 Ctrl++ (numeric keypad) Explanation Opens the Properties window for the selected object Reference plane is unlocked and can be edited The selected object is shown in front of others on the floor plan. This does not have any impact on the true arrangement, however! The selected object is shown behind others on the floor plan. This does not have any impact on the true arrangement, however!
Ctrl+(numeric keypad)
ANNEX 254
17.5
List of Figures
Fig. 11 Starting the installation .....................................................................................................7 Fig. 12 Installing Relux Professional, and the licence agreement ........................................................7 Fig. 13 Selecting the country and installation path ...........................................................................8 Fig. 14 Language settings .............................................................................................................8 Fig. 15 Installing the luminaire data ...............................................................................................9 Fig. 16 Products zone webpage.................................................................................................10 Fig. 17 "Update Manager" and "Relux Update" windows..................................................................11 Fig. 18 "Select packages" window ................................................................................................12 Fig. 19 Relux Administrator.........................................................................................................13 Fig. 110 "Import luminaires" and "Add new company" windows .......................................................15 Fig. 111 Relux Vision licence .......................................................................................................16 Fig. 112 "Licence" window for Relux Vision ...................................................................................16 Fig. 21 Relux interface ...............................................................................................................18 Fig. 22 Window main menu .......................................................................................................19 Fig. 23 Undo action window......................................................................................................21 Fig. 24 Show or hide toolbars......................................................................................................21 Fig. 25 Toolbars that have been moved ........................................................................................22 Fig. 26 Objects tab..................................................................................................................23 Fig. 27 Administering different scenes in a project .........................................................................23 Fig. 28 Project tab with the menu for the objects to be displayed ..................................................24 Fig. 29 Project tab with the context menu for the reference plane .................................................25 Fig. 210 Properties window for luminaires ..................................................................................25 Fig. 211 Output tab .................................................................................................................26 Fig. 212 "Coordinates" window ....................................................................................................27 Fig. 213 Project Manager context menu........................................................................................27 Fig. 214 Output window Floating mode ...................................................................................28 Fig. 215 Example of a different configuration for the Relux interface ................................................28 Fig. 216 Floor plan with context menu..........................................................................................29 Fig. 217 3D view with context menu ............................................................................................30 Fig. 218 3D luminance with context menu ....................................................................................30 Fig. 31 Start window with Relux Express.......................................................................................31 Fig. 32 Enter project data ...........................................................................................................32 Fig. 33 Interior window ............................................................................................................32 Fig. 34 Select material color window..........................................................................................33 Fig. 35 Assigning a colour to other walls .......................................................................................34 Fig. 36 Luminaire selection window ...........................................................................................35 Fig. 37 EasyLux window ...........................................................................................................36 Fig. 38 Output of a Relux Express project .....................................................................................38 Fig. 39 Save As .........................................................................................................................39 Fig. 310 Safety prompt when closing the project ...........................................................................39 Fig. 311 Start window with Interior ...........................................................................................40 Fig. 312 Enter project data .........................................................................................................40 Fig. 313 Interior window ..........................................................................................................41 Fig. 314 Select material color with the RAL Farbe/RAL color tab .................................................42 Fig. 315 "Interior" window with the data for the sample room .........................................................42 Fig. 316 Specify the North angle..................................................................................................43
ANNEX 255
Fig. 317 Overview presentation of the sample room with a changed floor plan, wall colours and floor and ceiling textures ......................................................................................................................43 Fig. 318 "Properties" window for the windows ...............................................................................44 Fig. 319 "Properties" window for the door and picture ....................................................................45 Fig. 320 Overview presentation of the sample room with the door, windows and picture.....................46 Fig. 321 Luminaire selection window with the Luminaire type tab and the luminaire types selected.47 Fig. 322 "Properties" window with the furniture for workplace A1.....................................................48 Fig. 323 Overview presentation of the sample room with the furniture in position ..............................48 Fig. 324 "Properties" window with the measuring surface for workplace A1 .......................................49 Fig. 325 Overview presentation of the sample room with the measuring surfaces in position ...............49 Fig. 326 "Properties" window with a suspended luminaire ...............................................................50 Fig. 327 Overview presentation of the sample room with the luminaires in position............................50 Fig. 328 "Calculation manager" window ........................................................................................51 Fig. 329 Print manager window.................................................................................................52 Fig. 330 Results output for workplace A1 in the form of pseudo colours, isolinies and a table ..............52 Fig. 331 3D Luminance with Relux Professional and with Relux Vision artificial light ........................53 Fig. 332 3D Luminance with Relux Professional and with Relux Vision daylight and artificial light ......53 Fig. 333 Save As .......................................................................................................................55 Fig. 334 Safety prompt when a project is closed ............................................................................55 Fig. 41 The Enter project data window .......................................................................................56 Fig. 42 Illustration of the header lines ..........................................................................................56 Fig. 43 Excerpt from the cover sheet............................................................................................57 Fig. 44 Location window...........................................................................................................58 Fig. 45 Language settings ...........................................................................................................58 Fig. 46 Header and footer window .............................................................................................59 Fig. 47 "Options" window with the general settings ........................................................................60 Fig. 48 Left: default setting: no luminaire type shown; Right: luminaire type shown ..........................60 Fig. 49 "Options" window with the defaults ...................................................................................61 Fig. 410 "Options" window with details of the exterior area .............................................................62 Fig. 411 Properties window for the coordinates origin, placing grid and drawing grid .......................63 Fig. 412 Floor plan action window: EditProperties and DisplayOrigin, raster width .....................64 Fig. 51 Room type: " Rectangle"..................................................................................................65 Fig. 52 "Select material color" window..........................................................................................66 Fig. 53 Assigning a colour to other walls .......................................................................................67 Fig. 54 Selecting a texture ..........................................................................................................67 Fig. 55 The "North angle" window and its depiction on the floor plan................................................68 Fig. 56 Room type: "Semi-circle" .................................................................................................69 Fig. 57 Room type: "L-room shape" .............................................................................................70 Fig. 58 Room type: "Polygon" with a sample geometry...................................................................71 Fig. 59 Room type: "Gable roof ...................................................................................................72 Fig. 510 Room type: "Trapezoid" .................................................................................................73 Fig. 511 Room type: "Exterior installation"....................................................................................74 Fig. 512 Menus for multi-room capability ......................................................................................75 Fig. 513 Selecting a scene via the toolbar .....................................................................................76 Fig. 514 Selecting a scene via the menu .......................................................................................76 Fig. 515 Duplicating a scene .......................................................................................................77 Fig. 516 Active scene and safety prompt ......................................................................................78 Fig. 61 Scale for the DXF import ..................................................................................................79 Fig. 62 shows an import with a scale of 1 (above) and a scale of 0.5 below. ................................80 Fig. 63 An example of planning with ReluxCAD..............................................................................81 Fig. 64 Specifiying the scale for the background image...................................................................82
ANNEX 256
Fig. 65 Fully adjusted background image ......................................................................................83 Fig. 66 Entire background image and background image restricted to the room................................84 Fig. 71 "Properties" window for a virtual measuring surface ............................................................86 Fig. 72 "Properties" window for the cube type Standard tab.......................................................87 Fig. 73 Properties window for the cube type Extended tab.......................................................87 Fig. 74 Properties window for the cube type - "Insertion point" tab................................................88 Fig. 75 "Properties" window for the cube type - "Insertion point" tab - defaults .................................89 Fig. 76 The Project Manager with luminaires and the Coordinates window ......................................90 Fig. 77 Moving a luminaire in a 3D view .......................................................................................90 Fig. 78 Rotating a luminaire in the 3D view ...................................................................................91 Fig. 79 Control centre with individual luminaire .............................................................................92 Fig. 710 "Insert new object" window ............................................................................................93 Fig. 711 Control centre" window with the properties for Field .........................................................95 Fig. 712 Control centre with "Insert new object" window ................................................................96 Fig. 713 Control centre with Properties window for a luminaire group in a field arrangement ............96 Fig. 714 Proposed luminaire arrangement accepted .......................................................................97 Fig. 715 Moving the luminaire field by means of the offset..............................................................98 Fig. 716 Chessboard pattern black ...............................................................................................99 Fig. 717 Chessboard pattern white............................................................................................. 100 Fig. 718 Angle to main axis 45................................................................................................. 101 Fig. 719 Mirroring at the x'/y' axis ............................................................................................ 118 Fig. 720 Mirroring at the x ,y' and x'/y' axis ............................................................................... 119 Fig. 721 Mirroring the second luminaire at the x, y' and x'/y' axis ................................................. 120 Fig. 722 "Control centre" window Break button......................................................................... 121 Fig. 723 Prompt for breaking up a group; right: depiction of a free group ....................................... 121 Fig. 81 The Luminaire selection window the first time it is called up............................................. 123 Fig. 82 Luminaire selection tab adding a luminaire.................................................................. 124 Fig. 83 Selecting a luminaire Extended search .......................................................................... 125 Fig. 84 Selecting a luminaire via the luminaire name and product group ......................................... 126 Fig. 85 "Imported Companies" tab ............................................................................................. 128 Fig. 86 "Plug-In" tab ................................................................................................................ 129 Fig. 87 "Sensors" tab ............................................................................................................... 130 Fig. 88 Individual luminaire tab with the Open window .............................................................. 131 Fig. 89 "Luminaire type" tab ..................................................................................................... 132 Fig. 810 Configure luminaire for emergency lighting window....................................................... 134 Fig. 811 "Options" window ........................................................................................................ 135 Fig. 812 "Modify luminaire" window ........................................................................................... 135 Fig. 813 Example showing lamp colours...................................................................................... 136 Fig. 814 Example showing how the light colour is used................................................................. 137 Fig. 815 "Coordinates" window and fixing luminaire aiming points ................................................. 138 Fig. 816 Aiming a luminaire at a picture ..................................................................................... 139 Fig. 817 The luminaire is aimed at the picture ............................................................................. 140 Fig. 91 Project Manager, "Objects" tab and "Room elements" folder............................................... 141 Fig. 92 Properties window after positioning with the mouse ........................................................ 142 Fig. 93 Context menu for the wall .............................................................................................. 142 Fig. 94 "Selection" window........................................................................................................ 143 Fig. 95 Insert room elements .................................................................................................... 143 Fig. 96 Properties window for windows..................................................................................... 144 Fig. 97 "Properties" window for doors......................................................................................... 146 Fig. 98 "Properties" window for skylights .................................................................................... 147 Fig. 99 "Properties" window for pictures ..................................................................................... 149
ANNEX 257
Fig. 910 Project Manager, Objects tab and Basic objects folder................................................. 150 Fig. 911 Inserting basic objects ................................................................................................. 151 Fig. 912 Context menu of the "Floor plan" action window.............................................................. 152 Fig. 913 "Properties" window for cubes....................................................................................... 153 Fig. 914 "Properties" window for working surfaces ....................................................................... 154 Fig. 915 "Properties" window for pillars ...................................................................................... 156 Fig. 916 "Properties" window for partition walls ........................................................................... 157 Fig. 917 Main menu option File Import -3D object and Open window ...................................... 159 Fig. 918 "Scaling" window......................................................................................................... 160 Fig. 919 objects/furniture folder with an imported 3D object ......................................................... 160 Fig. 920 "Edit library window ................................................................................................... 161 Fig. 921 Adding furniture from the library to the project ............................................................... 163 Fig. 922 3D objects/furniture folder with imported furniture .......................................................... 164 Fig. 923 Project Manager, Objects tab and "3D objects/furniture" folder ...................................... 164 Fig. 924 Insert 3D objects/furniture ........................................................................................... 165 Fig. 925 "Properties" window for 3D objects/furniture .................................................................. 166 Fig. 101 Indoor room project with different textures .................................................................... 168 Fig. 102 Opening the "Properties" window via the Project Manager ................................................ 169 Fig. 103 Edit materials window ............................................................................................. 169 Fig. 104 "Select material" window.............................................................................................. 170 Fig. 105 Relux Texture Library showing tiles as an example ....................................................... 171 Fig. 106 "Edit materials" window with the selected texture; right: context menu ........................... 171 Fig. 107 "Process surface picture" window with the "Reflectance (Rho)" tab.................................. 172 Fig. 108 Left: Original colour; right: modified colour .................................................................... 173 Fig. 109 "Edit surface picture" window with the Scaling tab ...................................................... 174 Fig. 1010 Door with a width entered by the user ......................................................................... 175 Fig. 1011 Tiled material............................................................................................................ 175 Fig. 1012 Scale to fit object size option.................................................................................... 176 Fig. 1013 The Scale to fit object size" option leads to distortion in the picture on the right .............. 176 Fig. 1014 "Properties" window with the new texture..................................................................... 177 Fig. 1015 "Objects" tab with the "Materials/textures" folder and the context menu .......................... 177 Fig. 1016 Textures dragged on to walls, the floor and 3D objects with the mouse ............................ 178 Fig. 1017 Select material window........................................................................................... 179 Fig. 1018 Open window for picture selection............................................................................ 179 Fig. 1019 "Define size of picture", "Name reflectance" and "Insert scale" windows .......................... 180 Fig. 1020 The "Edit materials" window with the new "Edit" button ............................................... 181 Fig. 111 Measuring element with the active side pointing up (left) and with the inactive side pointing up (right) .................................................................................................................................. 183 Fig. 112 Measuring element with the active side pointing up (left) and with the inactive side pointing up (right ................................................................................................................................... 183 Fig. 113 Project Manager, "Objects" tab, and "Measuring elements" directory ................................. 184 Fig. 114 Control centre with the Insert new object window ......................................................... 185 Fig. 115 Control centre with virtual measuring surface ................................................................. 185 Fig. 116 Context menu for the Floor plan action window ............................................................ 186 Fig. 117 Example: traffic roundabout polygon surfaces .............................................................. 187 Fig. 118 Escape route: median line and area............................................................................... 187 Fig. 119 "Properties" window Virtual measuring surface ............................................................. 188 Fig. 1110 Position of the calculation grid..................................................................................... 190 Fig. 121 Calculation manager .................................................................................................... 192 Fig. 122 Calculation variants with windows in the room ................................................................ 193 Fig. 123 Calculating a multi-room project ................................................................................... 193
ANNEX 258
Fig. 124 Setting the accuracy .................................................................................................... 194 Fig. 125 Setting the raster spacing ............................................................................................ 194 Fig. 126 Specifying the maintenance factor................................................................................. 195 Fig. 127 Assistant for specifying the maintenance factor............................................................... 196 Fig. 128 Miscellaneous settings.................................................................................................. 197 Fig. 129 The Measuring areas tab............................................................................................ 198 Fig. 1210 "Calculation parameters" window................................................................................. 199 Fig. 1211 first: calculation points on the edge; then: first calculation point half a raster .................. 200 Fig. 1212 "Glare rating" tab ...................................................................................................... 201 Fig. 1213 Activating emergency lighting for a luminaire................................................................ 202 Fig. 1214 Activating the sensor for calculations ........................................................................... 203 Fig. 1215 Output of a sensors detection range............................................................................ 204 Fig. 1216 Determining the luminous intensity.............................................................................. 205 Fig. 131 Output tab ............................................................................................................... 207 Fig. 132 Zoom menu................................................................................................................ 209 Fig. 133 Properties floor plan window ..................................................................................... 210 Fig. 134 Zoom menu................................................................................................................ 211 Fig. 135 Properties 3D views window ....................................................................................... 212 Fig. 136 3D view context menu............................................................................................... 213 Fig. 137 Properties overview window ....................................................................................... 215 Fig. 138 Properties table window............................................................................................ 216 Fig. 139 Properties isolines pseudo colours window ................................................................... 216 Fig. 1310 Properties sections window ...................................................................................... 217 Fig. 1311 Zoom menu .............................................................................................................. 218 Fig. 1312 Properties brightness window ................................................................................... 219 Fig. 1313 3D luminance context menu ..................................................................................... 220 Fig. 1314 ldc display: left: C-planes; right: volume model ............................................................ 220 Fig. 1315 Brightness window .................................................................................................. 220 Fig. 1316 Page preview window .............................................................................................. 221 Fig. 1317 Page preview window, bottom right........................................................................... 222 Fig. 1318 Page setup window ................................................................................................. 222 Fig. 1319 The Print manager window ....................................................................................... 223 Fig. 1320 Template selection..................................................................................................... 224 Fig. 1321 Profile manager window........................................................................................... 224 Fig. 1322 "Add new profile" window ........................................................................................... 224 Fig. 141 Location window ....................................................................................................... 226 Fig. 142 Entering the North angle .............................................................................................. 227 Fig. 143 "North angle" window and depiction on the floor plan ...................................................... 227 Fig. 144 "Options" window for the exterior area........................................................................... 228 Fig. 145 Control centre with the "Insert new object" window ......................................................... 229 Fig. 146 Control centre with the Properties window for a canopy ................................................... 229 Fig. 147 Room with a canopy floor plan and exterior view .......................................................... 230 Fig. 148 Context menu for the "3D view" action window with the "Exterior view" menu option ......... 231 Fig. 149 3D Exterior view showing obstructions (made up from cubes ........................................... 231 Fig. 1410 Calculation Calculation manager main menu option .................................................. 233 Fig. 1411 Calculation manager with the "Calculation" tab.............................................................. 233 Fig. 1412 Calculation manager with the "Measuring areas" tab and the "Calculation parameters" window ..................................................................................................................................... 235 Fig. 1413 Calculation manager with the "Date" tab ...................................................................... 236 Fig. 1414 Solar altitude graph ................................................................................................... 237 Fig. 1415 Calculating the solar altitude graph.............................................................................. 238
ANNEX 259
Fig. 151 Options for economic efficiency calculations.................................................................... 239 Fig. 152 "Defaults" window ....................................................................................................... 240 Fig. 153 "Sun probability window ............................................................................................. 241 Fig. 154 Lighting installation window" ...................................................................................... 242 Fig. 155 "Luminaire efficiency results output.............................................................................. 243 Fig. 156 Installation costs" tab .................................................................................................. 243 Fig. 157 "Operating costs" tab................................................................................................... 244 Fig. 158 "Illuminance system" tab ............................................................................................. 244 Fig. 159 "Basic values" tab ....................................................................................................... 244 Fig. 1510 Results output for the artificial light efficiency calculation ............................................... 245 Fig. 161 The Relux Offert offer program with data from the Relux project .................................... 248 Fig. 162 Sample offer............................................................................................................... 249 Fig. 163 Sample tender ............................................................................................................ 249
ANNEX 260
17.6
Index
3D ldc ........................................................................................................... 214 3D view......................................................................................................... 208 3DS .............................................................................................................. 159 Action window.............................................................................................18, 29 active sides ................................................................................................... 154 Administer luminaire data.................................................................................. 13 Administrator ................................................................................................... 13 Aim luminaires ............................................................................................... 214 Aligning luminaires ......................................................................................... 138 Amount ......................................................................................................... 159 Area-type objects .................................................................................... 152, 187 Attenuation factor partitioning................................................................... 145, 148 average indirect fraction.................................................................................. 234 Axes of the body .............................................................................................. 85 Background images ................................................................................... 82, 210 Big symbols ..................................................................................................... 19 bmp.............................................................................................................. 179 Bounding box............................................................................................ 88, 159 Break............................................................................................................ 121 Brightness .............................................................................................. 173, 219 Calculation grid .............................................................................................. 190 Calculation manager ....................................................................................... 192 Calculation raster ......................................................................154, 155, 156, 158 Calculation results in tabular form .................................................................... 208 Camera ......................................................................................................... 210 Canopy ......................................................................................................... 228 Chair ............................................................................................................ 161 Chapter number ............................................................................................. 222 Circle ....................................................................................................... 94, 112 Clear sky ................................................................................................ 232, 239 Closed polygon............................................................................................... 187 Collision .......................................................................................................... 85 Colour........................................................................................................... 173 Column ......................................................................................................... 153 Combination .................................................................................................. 161 Company data.................................................................................................. 59 Company logo .................................................................................................. 59 Computing time ............................................................................................. 162 Configure white balance .................................................................................. 220
ANNEX 261
Contrast ........................................................................................................ 173 Coordinates origin ............................................................................................ 63 Coordinates window.......................................................................................... 26 Copy picture .................................................................................................. 213 cost comparison ............................................................................................. 242 Cover sheet ..................................................................................................... 57 Cube...................................................................................................... 150, 153 Cupboard ...................................................................................................... 161 Customer ........................................................................................................ 56 Daylight .......................................................................................... 202, 238, 239 Daylight calculation ........................................................................................ 233 Daylight control.............................................................................................. 239 Daylight saving time ...........................................................................57, 226, 240 Decimal places ............................................................................................... 215 Default values .................................................................................................. 61 Define observers ............................................................................................ 213 Design-Object ................................................................................................ 153 Direct fraction ................................................................................................ 194 Door ...................................................................................................... 141, 146 Doors, row of ................................................................................................. 146 Drag&Drop ...................................................................................................... 90 Draw...................................................................................................... 152, 186 Draw object ............................................................................................ 152, 186 Drawing ........................................................................................................ 152 Drawing grid .................................................................................................... 63 Dynamic raster .............................................................................................. 234 Economic efficiency ........................................................................................ 239 Efficiency....................................................................................................... 238 Efficiency calculation ....................................................................................... 239 Electricity tariff............................................................................................... 242 Ellipse ........................................................................................................... 112 Emergency lighting .................................................................................. 182, 202 Evaluation type .............................................................................................. 189 Example field ................................................................................................. 108 Example mirroring .......................................................................................... 114 Exterior view.................................................................................................. 213 Field ............................................................................................................... 94 Figure ........................................................................................................... 161 Final point ..................................................................................................... 187 Floor plan ...................................................................................................... 208 Footer ............................................................................................................. 59 Footprint ....................................................................................................... 157 Free group..................................................................................................... 121
ANNEX 262
Freestanding luminaire.................................................................................... 213 Freeze........................................................................................................... 189 Furniture ....................................................................................................... 166 gif ................................................................................................................ 179 Glare rating ................................................................................................... 201 GR................................................................................................................ 201 Group arrangements ......................................................................................... 93 Header ............................................................................................................ 56 hidden .......................................................................................................... 153 Hide.............................................................................................................. 189 high indirect fraction ....................................................................................... 234 Holiday period................................................................................................ 240 Icon................................................................................................................ 20 Illuminance camera....................................................................................................... 199 semi-cylindrical ........................................................................................... 199 vertical ....................................................................................................... 199 Illuminances .................................................................................................... 88 Importing floor plans ........................................................................................ 79 Indirect fraction ............................................................................................. 194 Insertion point .......................................................................................... 88, 189 Installation ...................................................................................................6, 56 by download .................................................................................................10 off DVD .................................................................................................. 6, 124 Installation costs ............................................................................................ 243 Isolines ......................................................................................................... 216 jgp ............................................................................................................... 179 jpeg.............................................................................................................. 179 Label room elements ...................................................................................... 210 Landscape format ........................................................................................... 222 Language settings ............................................................................................ 58 Layout reset .................................................................................................... 18 Line-type objects..................................................................................... 152, 187 Location ................................................................................................... 57, 241 Location list .............................................................................................. 57, 226 locked ........................................................................................................... 153 low indirect fraction ........................................................................................ 234 Luminaire efficiency ........................................................................................ 243 Luminaire information ..................................................................................... 132 Luminaire legend............................................................................................ 215 Luminaire orientation ...................................................................................... 210 Luminaire search ............................................................................................ 125 Luminaire selection......................................................................................... 123
ANNEX 263
from local database....................................................................... 124, 128, 130 imported companies..................................................................................... 128 individual luminaire...................................................................................... 131 online..................................................................................................128, 214 Luminaire types ............................................................................................. 243 Main menu ...................................................................................................... 18 Maintenance factor ......................................................................................... 195 Make faces double sided.................................................................................. 167 Margins ......................................................................................................... 222 Material allocation ............................................................................................ 88 Material assignment........................................................................................ 149 Measuring areas ............................................................................................. 198 Measuring element, shape of ........................................................................... 190 Measuring elements........................................................................................ 182 Measuring surface off...................................................................................... 214 Measuring surfaces ......................................................................................... 182 Medial line ..................................................................................................... 187 Minimum illuminance ...................................................................................... 189 Mirroring ......................................................................................................... 94 Month curve .................................................................................................. 237 Move .............................................................................................................. 90 Multi-room capability ........................................................................................ 75 North angle .............................................................................................. 67, 227 Object groups .................................................................................................. 93 Objects Tab ..................................................................................................... 23 Observer ................................................................................................ 201, 210 Offers ........................................................................................................... 248 Offertprogramm ............................................................................................. 248 Only direct fraction ......................................................................................... 234 Open screen outputs....................................................................................... 223 Operating costs .............................................................................................. 243 Outline............................................................................................................ 94 Output tab....................................................................................................... 26 Output window, closed .................................................................................... 208 overcast sky .................................................................................................. 239 Overcast sky.................................................................................................. 232 Page number ................................................................................................. 222 Page preview .......................................................................................... 221, 225 Paper size...................................................................................................... 222 Partial surface ................................................................................................ 189 Partial surfaces .............................................................................................. 182 Partition wall........................................................................................... 150, 157 Partitioning factor .................................................................................... 145, 148
ANNEX 264
PDF .............................................................................................................. 222 Picture ............................................................................................ 141, 149, 179 Picture format ................................................................................................ 179 Pillar ............................................................................................................. 156 Place objects in row ........................................................................................ 111 Placing grid............................................................................................... 63, 210 Placing grid, turn off ....................................................................................... 186 Plant............................................................................................................. 161 Plug-In for luminaires ..................................................................................... 129 Pollution attenuation factor ....................................................................... 145, 148 Pollution factor ........................................................................................ 145, 148 Polygon surfaces ............................................................................................ 186 Polygon, closed .............................................................................................. 152 Polyline .................................................................................................. 152, 187 Portrait or landscape format ............................................................................ 222 Precision ....................................................................................................... 194 Print manager ................................................................................................ 222 Print preview .......................................................................................... 221, 223 Printout......................................................................................................... 225 Processed by.................................................................................................... 56 Program settings .............................................................................................. 56 Program settings exterior area ......................................................................... 228 Project data ..................................................................................................... 56 Project description ............................................................................................ 57 Project examples Relux Express ...............................................................................................31 Project location .............................................................................................. 226 Project manager............................................................................................... 18 Project Manager ............................................................................................... 23 Project number ................................................................................................ 56 Project tab....................................................................................................... 23 Pseudo colours ............................................................................................... 216 Public holidays ............................................................................................... 240 Raster ........................................................................................................... 194 Redefine insertion point..................................................................................... 88 Reflectance............................................................................................. 172, 174 Relux Express .................................................................................................. 31 Relux Interface ................................................................................................ 18 RELUX Offert.................................................................................................. 248 Relux Vision Licence ......................................................................................... 16 Right-hand rule ................................................................................................ 85 Room elements .............................................................................................. 141 Room orientation.............................................................................................. 57
ANNEX 265
Room types ..................................................................................................... 65 Exterior installation ........................................................................................74 Gable roof.....................................................................................................71 L-room shape................................................................................................70 Polygon ........................................................................................................71 Rectangle .....................................................................................................65 semi-circle ....................................................................................................69 Trapezoid .....................................................................................................73 Rotate............................................................................................................. 91 Rotate mouse wheel ....................................................................................... 209 Rotation direction ............................................................................................. 85 Rotation of the body ......................................................................................... 85 Row ................................................................................................................ 94 Saturation ..................................................................................................... 173 Save picture .................................................................................................. 213 Scale .............................................................................................. 172, 174, 190 Scale for background image............................................................................... 82 Scale type ..................................................................................................... 190 Scaling.....................................................................................159, 172, 174, 216 Scaling factor.......................................................................................... 159, 166 Scene ............................................................................................................. 75 Screen output ................................................................................................ 225 Screen outputs............................................................................................... 206 Sections ........................................................................................................ 217 Select printer ................................................................................................. 222 Sensor selection ............................................................................................. 130 Sensors......................................................................................................... 203 Set lamp colour .............................................................................................. 136 Shelves ......................................................................................................... 161 Shortcut ........................................................................................................ 250 Side length, minimum ..................................................................................... 156 Sky models.................................................................................................... 232 Skylight ........................................................................................................ 147 Smooth edges................................................................................................ 167 Solar altitude graph ........................................................................................ 237 Sports ground ................................................................................................ 113 Staff breaks ................................................................................................... 240 Standard template.......................................................................................... 224 Statusbar ........................................................................................................ 19 Step size ....................................................................................................... 213 Sun probability............................................................................................... 239 Surroundings ................................................................................................. 182 Suspended luminaire ...................................................................................... 213
ANNEX 266
Switch off placing grid..................................................................................... 152 System recommendation ..................................................................................... 6 Table ............................................................................................................ 161 Template manager ......................................................................................... 223 Tender .......................................................................................................... 248 Texture ..................................................................................... 41, 169, 179, 180 Texture library ............................................................................................... 170 Thickness of the ceiling ................................................................................... 228 Thickness of the walls ..................................................................................... 228 Time zone ................................................................................................ 57, 226 Times of day .................................................................................................. 237 Toolbar ........................................................................................................... 18 Transmittance ......................................................................................... 145, 148 Tree.............................................................................................................. 161 UGR.............................................................................................................. 201 Uniformity ..................................................................................................... 215 Uniformly ........................................................................................................ 94 Update via the Internet ..................................................................................... 10 User defined views ......................................................................................... 219 Vehicle .......................................................................................................... 161 Vertex, add.................................................................................................... 191 Vertex, remove .............................................................................................. 191 Viewing angle ................................................................................................ 212 VRML ............................................................................................................ 159 White balance ................................................................................................ 219 Window .................................................................................................. 141, 144 Window Properties Floor plan ........................................................................ 210 Windows, row of............................................................................................. 145 Wire frame view ............................................................................................. 213 Working days ................................................................................................. 240 Working surface ...................................................................................... 150, 154 Zoom in ........................................................................................................ 209 Zoom out ...................................................................................................... 209