28.4
33 37
33
10
1)
References
Projects Pressure (bar) 4,0 1,0 3,45 3,0 1,75 Outer Tunnel- Width of ring Number of Dia. (mm) (mm) segments 9,090 8850 6500 5800 9200 1800 1500 1500 1300 1500 7+1 8+1 5+1 5+1 7+1 year Tunnel length (m) 1314 8100 7500 884 2259
Metro B Oullins Metro Tehran Metro Ahwaz Flamanville Wehrhahnlinie Dsseldorf Greater Cairo Metro Line 3 Paris Ligne 12
1)
4,0
9150
1500
7+1
2008
7
8800 1800 1+5+1 2008
Deviations have effects on the capability! Tunnel gaskets
4200
3636
Date:12.01.2010
14.5
Aditional references
Projects Pressure (bar) 1,5 2,5 Outer Tunnel- Width of ring Number of Dia. (mm) (mm) segments 9400 6550 1500 1500 7+1 6+1 year Tunnel length (m) 1973 508
Metro Marseille Stadtbahn Kln Baulos Nord Tima 1 Project, Paris Metro Moskau Linie Strogino Metro Esfahan Metro Shiraz Randstad Rail Servicetunnel Silberwald Metro Toulouse, Los2
2006 2006
1400 1400
5+1 6+1
2005
1862 1350
1,0
7480
5+1
2002
4849
1,0
7480
6+1
2002
3773
Ashgabat Metro Moscow A 86 Coffiroute, Paris Metro Ankara Pannerdensch Kanaal Detroit River Outfall Singapore C 706 Metro U5 Berlin Metro Izmir Tunnel de Caluire Metro Ligne Mtor Lesotho Highlands Water Project 4,0 1,6 2,0 3,5 2,5 3,0 3,0 3,5
2,0 3,4
2004 3244
Tunnel gaskets
Date:12.01.2010
Test without offset at RT length: 200 mm steel plates with endplates velocity of deflection: 50 mm/min.
Load (kN/m)
tolerance +/- 10 %
45
40
35
30
25
20
15
10
0 0 1 2 3 4 5 6 7 8 9 10
Deflection (mm)
Tunnel gaskets Date:03.07.2007
Criteria: Groove width at bottom 33 mm, groove depth 10 mm, groove angle 15 Groove dimension: Cross section: Agroove = ( tan 15 10 + 33 ) 10 = 356,8 mm2 315 mm2
At full compression (gap 0 mm, distance groove bottom bottom 20 mm) the groove is used with: 315 356,8 100 = 88,3 % ( < 100 % )
100 95 90 85 80 75 70 65 60 16 18 20 22 24 26 28 30
With this calculation also the tolerances of the concrete segment measurements and the profile measurements have been considered.
Tunnel gaskets
Date:24.01.2006
test in a T-joint test rig pressure: < 20 bar - 1 bar / 5 Min. > 20 bar - 2 bar / 5 Min.
29
28
27
26
25
60
without offset
Waterpressure ( bar ) 1)
with 10 mm offset
50
40
30
20
10
5 bar test pressure Metro Bucarest
0 10 9 8 7 6 5 4 3 2 1 0
gap ( mm )
Date:15.02.2008
Tunnel gaskets
1 100
10
50
90 80
Residual stress ( % )
70 60 50 40 30 20 10 0 1,00E+00
1,00E+01
1,00E+02
1,00E+03
1,00E+04
Time (month)
Tunnel gaskets
Date:26.05.1999