This document contains data from two measurements where Ta and Tf represent initial and final temperatures, and Displasemen represents displacement in tons. The first measurement showed an initial temperature of 8.25 m, final temperature of 7.45 m, and displacement of 12318.82 tons. The second measurement had an initial and final temperature both of 7.85 m, and a displacement of 12318.89 tons.
This document contains data from two measurements where Ta and Tf represent initial and final temperatures, and Displasemen represents displacement in tons. The first measurement showed an initial temperature of 8.25 m, final temperature of 7.45 m, and displacement of 12318.82 tons. The second measurement had an initial and final temperature both of 7.85 m, and a displacement of 12318.89 tons.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
This document contains data from two measurements where Ta and Tf represent initial and final temperatures, and Displasemen represents displacement in tons. The first measurement showed an initial temperature of 8.25 m, final temperature of 7.45 m, and displacement of 12318.82 tons. The second measurement had an initial and final temperature both of 7.85 m, and a displacement of 12318.89 tons.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
Kontrol Suspension Bridge Panjang = 50 m Lebar = 1.5 m Ukuran kabel (main cable = IWRC 22mm B.J Kayu (asumsi) = 860 kg/m3 Beban Hidup = 100 kg/m2 σijin kayu Kls III = 60 kg/m2