N= 1200 ton η= 0.8644 < 1 V = 47.786 m³ MT s.d TK = 25 m (tiang pancang Group Pile) Berat = 114.687 ton dw = 3m Ukuran Pile Cap 2. Berat Σpile ɣb = 1.5 t/m³ n= 28 tiang V = 104.832 m³ ɣsat = 1.8 t/m³ D real = 0.4 m Berat = 251.597 ton ɣw = 1 t/m³ D ekiv. = 0.45 m 3. Beban Lantai kerja ɣd = 0.8 t/m³ S= 1.81 m (4 D) t LK = 0.1 m MB = 40 t.m n1 = 4 baris V= 7.964 m³ ML = 60 t.m n2 = 7 baris Beban = 14.336 ton eo = 1.65 Lg = 11.2 m 4. Beban penutup lantai Qo1 ep = 0.7 Bg = 5.8 m t lantai = 0.03 m Cc = 0.55 Poer Lx = 12.0 m Berat = 0.078 t/m² C= 18 t/m² Poer By = 6.6 m Beban = 6.212 ton Qo1 2600 kg/m³ L pile = 23.4 m 5. Beban berguna Qo2 = 2.6 t/m³ Jumlah Gaya Vertikal Beban = 31.858 ton Qo2 400 kg/m² 1. Berat pile cap 114.687 ton 6. Beban akibat kons. = 0.4 t/m² 2. Berat Σpile 251.597 ton N= 1200 ton ɣb. b = 2.4 t/m³ 3. Beban lantai kerja 14.336 ton ɣb. tb = 1.8 t/m³ 4. Beban lantai Qo1 6.212 ton Pile = (40 x 40) cm 5. Beban berguna Qo2 31.858 ton D real = (0.4 x 0.4) m 6. Beban akibat kons. 1200 ton T= 0.6 m ΣV = 1618.690 ton Diketahui: Tegangan Angka Pori 2/3 pile = 15.6 m Δe1 = 0.189 Δh = 9.40 m Δe2 = 0.123 Δh1 = 2.35 m Δe3 = 0.084 Δh2 = 2.35 m Δe4 = 0.059 Δh3 = 2.35 m ΣΔe = 0.454 Δh4 = 2.35 m Settlement of Consolidation z1 = 1.175 m ΔSc1 = 0.167 m z2 = 3.525 m ΔSc2 = 0.109 m z3 = 5.875 m ΔSc3 = 0.074 m z4 = 8.225 m ΔSc4 = 0.052 m Settlement (S) dan Waktu (t) ΣΔSc = 0.403 m Tegangan Efektif Tanah ΣΔSc = 40.291 cm A1 = σo1 = 15.52 t/m² Waktu Penurunan A2 = σo2 = 17.4 t/m² Cv = 0.0000015 cm/detik A3 = σo3 = 19.28 t/m² u= 0.9 A4 = σo4 = 21.16 t/m² Tv = 0.848 Penyebaran Tegangan Tanah H= 940 cm A1 = 86.78 m² t1 = t9 = 15839.9459 tahun Δσo1 = 18.65 t/m² t2 = 4751.98376 tahun A2 = 137.90 m² t total = 20591.930 tahun Δσo2 = 11.74 t/m² Settlement of Immediate A3 = 200.06 m² µ= 0.5 (Tabel) Δσo3 = 8.09 t/m² E= 70 kg/cm² A4 = 273.27 m² Lg/Bg = 1.93 Δσo4 = 5.92 t/m² Ip = 0.78 (Grafik) Si = 12.04041 cm Menghitung Ss Cα = -0.8689224 Ss = 251.22388 cm S Total = 303.55491 cm Beban tiap pancang Daya Dukung (Qgs) X1 4 tiang α= 0.3 (Grafik) = 0.00 m F= 5.4 t/m² X2 8 tiang θ= 25 (Tabel) = 1.81 m Nc = 20.72 (Tabel) X3 8 tiang Kedalaman = 23.4 m = 3.61 m Maka, Qg = 36000.09 ton X4 8 tiang SF = 3 (Monumental) = 5.42 m Qgs = 12000.03 ton > ΣV (Aman) Y1 14 tiang Kapasitas 1 tiang pancang (Qis) = 0.90 m Qfriction = 179.1284 ton Y2 14 tiang Qtip = 59.6736 ton = 2.71 m Qulti = 238.802 ton ΣX1² = 0.000 m² SF = 3 (Monumental) ΣX2² = 26.089 m² Qis = 79.601 ton > Qmax (Aman) ΣX3² = 104.357 m² Kontrol Efisiensi ΣX4² = 234.803 m² Ø= 14.04 ᵒ ΣX² = 365.248 m² m= 4 ΣY1² = 11.414 m² n= 7 ΣY2² = 102.726 m² Eg = 0.86 ΣY² = 114.140 m² = 86 % Qmax= Q7 = 59.650 ton Qall = 1912.3 ton > ΣV (Aman) Qmin= Q22 = 55.971 ton Kontrol = 18.139 % < 20% (OK)
Kontrol Suspension Bridge Panjang = 50 m Lebar = 1.5 m Ukuran kabel (main cable = IWRC 22mm B.J Kayu (asumsi) = 860 kg/m3 Beban Hidup = 100 kg/m2 σijin kayu Kls III = 60 kg/m2