35m
BRIDGE NO. 618
Internal length of box 4.2 m
Internal height of box 3.35 m
Thikness of wall 0.5 m
Overall lenght of box 5.2 m
Overall height of box 4.35 m
Effective span 4.7 m
Clear ht of wall 3.35 m
Haunch size 0.4 m
Calculations of dispersion length
Depth of rail = 0.156 m
Depth of sleeper = 0.235 m
Depth of ballast = 0.3 m
Depth of Earth fill = 0.20 m
Note: Since the box is cast in segments, dispersion through slab is ignored conservatively.
As per Bridge Rules clause 2.3.4.2.a dispersion occurs at slope not greater
than half horizontal to one vertical.
Total length for dispersion on either side of sleeper= 0.15 m
Length of sleeper = 2.75 m
Width of loaded length = 3.05 m
SIDL Of ballast
Weight of the ballast /m length = 6.75 t/m
Total load for B.M for 1 track for 1 cells loaded for 5.2 m length = 71.8 T
Total load for S.F for 1 track for 1 cells loaded for 5.2 m length = 97.53 T
C.D.A (as per clause 2.4.2.1 (a) of bridge rules) for 1 cells loaded condition = 0.89
Live load intensity after dispersion for single cell (5.2m) loaded 8.556 t/m2
Weight of the wearing coat per 1m length of box = 0.360 t/m2 3.5316
At rest
Horizontal component of D.L.Surcharge at top of box culvert =ko x qxcos d= 1.055936 t/m 10.35873
Horizontal component of D.L.Surcharge at bott. of box culvert = ko x q x cos d= 1.055936 t/m 10.35873
Total horizontal component 2.111872 t/m 20.71747
Vertical component ( total hor.x0.5xht of wallxtan(.18)) 0.835845 t 8.199637
At Active
Horizontal component of D.L.Surcharge at top of box culvert =ka x qxcos d= 0.644498 t/m 6.322528
Horizontal component of D.L.Surcharge at bott. of box culvert = ka x q x cos d= 0.644498 t/m 6.322528
Total horizontal component 1.288997 t/m 12.64506
Vertical component ( total hor.x0.5xht of wallxtan(.18)) 0.510164 t 5.004707
Earth pressure:
ko = 0.4849619 Angle of wall friction = 0.18 radian
ka = 0.296 Overall Height of box culvert = 4.35 m
Height of fill = 0m
At Rest Unit weight of soil = 1.8 t/m3
At top of the wall Horizontal component=0.0+.250=.250m 0.214707 t/m2 2.106276
At the bottom of wall Horizontal component = 4.251199 t/m2 41.70426
Vertical component = 0.5 t 4.905
At Active
At the top of wall Horizontal component= = 0.131048 t/m2 1.285581
At the bottom of wall Horizontal component = 2.59475 t/m2 25.4545
Vertical component = 0.31 t 3.0411